§ 95.507 — Aerobic systems: Additional requirements
Code of Ordinances, City of Springfield, Illinois (Supp. No. 82: codified through Ordinance No. 146-04-26, enacted April 7, 2026) · Springfield, Ill., City Code § 95.507
Corpus is an independent public-information project, not the official City of Springfield website. Stable reference: corpuslaw.us/code/18caa907-d058-4688-a566-84b7c94aa93b
§ 95.507. - Aerobic systems: Additional requirements.
(a) An effluent receiving trench shall be required for all class 1 aerobic systems installed after October 16, 1998. Systems installed prior to this date will upon sale of the property, be required to meet the guidelines of this section. (1) The effluent receiving trench shall be designed at three gallons per square foot of trench bottom area based on the daily design flow of the system. (2) Effluent receiving trenches or beds shall not be greater than 36 inches below the ground surface and shall have a minimum earth cover of six inches and a maximum earth cover of 12 inches. (3) The effluent receiving trench system shall be designed so the entire trench or bed is the first component to be filled with effluent. Any excess effluent shall be directed to the chlorine feed/contact chamber prior to discharge. The effluent receiving trench shall not be installed in direct series with the open-discharge. (See diagram #1) Diagram #1 [image omitted; see the official code] Diagram #1
(Ord. No. 518-10-98, § 1(Exh. A), 10-6-98; Ord. No. 586-11-98, § 1, 11-17-98)
Ask a question about Springfield law
Corpus searches the Springfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.
