Sec. 74-511. - Submittal requirements for stormwater management plans.

(a) A stormwater management plan is required where the development of a site meets at least one of the applicability criteria found in section 74-504(a) or section 74-504(c). The stormwater management plan shall detail how post-development runoff will be controlled or managed and how the proposed development will meet the requirements of this article, including the Georgia Stormwater Management Manual. (b) This plan shall be in accordance with the criteria established in this section and must be prepared under the direct supervisory control of either a professional engineer or a landscape architect, either of which may seal and sign the overall plan. However, the items required by subsections (d)(6) through (d)(9) shall be sealed and signed by a professional engineer. Any document sealed and signed under this provision constitutes a verification that the design of all stormwater management measures meet the submittal requirements of this article. (c) Plans and studies shall be presented in a format that itemizes each of the requirements in section 74-511(d), including the stormwater management standards. (d) The stormwater management plan must ensure that the requirements and criteria in this article are being satisfied and that opportunities are being taken to minimize adverse post-development runoff impacts from the development. The plan shall consist of maps, narratives, and supporting design calculations (hydrologic and hydraulic) for the proposed stormwater management system. The plan shall include all applicable design requirements and forms found in the Georgia Stormwater Management Manual and the city's submittal requirements for all development that is subject to this article. This includes but is not limited to the following: (1) Common address and legal description of the site; (2) Vicinity map; (3) Existing conditions/proposed site plans. Existing conditions and proposed site layout sketch plans, which illustrate at a minimum: a. Existing and proposed topography (minimum two-foot contours); b. Perennial and intermittent streams; c. Mapping of predominant soils from soil surveys; d. Boundaries of existing predominant vegetation and proposed limits of clearing and grading; and e. Location of existing and proposed roads, buildings, parking areas and other impervious surfaces; (4) Infiltration rates. Infiltration rates shall be determined by soil surveys, on-site soil analysis, or an infiltration test. If the site has been previously developed or graded or contains urban soil types, an infiltration test is required; (5) Natural resources inventory. A written or graphic inventory of the natural resources in existence prior to the commencement of the development. This inventory shall address resources both on the site and in the surrounding area that are or may be impacted by the development. Particular attention should be paid to environmentally sensitive features that present constraints for development. This inventory shall also include: a. A description of soil conditions, trees and canopy cover, topography, wetlands, and other native vegetative areas on the site; b. The location and boundaries of other natural feature protection and conservation areas such as wetlands, lakes, ponds, floodplains, stream buffers; and c. Other setbacks, including but not limited to drinking water well setbacks and septic setbacks (6) Existing conditions hydrologic analysis. The existing condition hydrologic analysis for runoff rates, volumes, and velocities, in accordance with the Georgia Stormwater Management Manual, which shall include: a. A topographic map of existing site conditions with the drainage basin boundaries indicated; b. Acreage, soil types, and land cover of areas for each subbasin affected by the development; c. All perennial and intermittent streams and other surface water features; d. All existing stormwater conveyances and structural stormwater controls; e. Direction of flow and exits from the site; f. Analysis of runoff provided by off-site areas upstream of the site; g. Methodologies, assumptions, site parameters and supporting design calculations used in analyzing the pre-development hydrology. For Redevelopment, predevelopment conditions shall be modeled using the established guidelines in section 74-513; (7) Post-development hydrologic analysis. The post-development hydrologic analysis for runoff rates, volumes, and velocities, which shall be calculated in accordance with the Georgia Stormwater Management Manual, and include: a. A topographic map of developed site conditions with the post-development drainage basin boundaries indicated; b. Total area of post-development impervious surfaces and other land cover areas for each subbasin affected by the development; c. Calculations for determining the runoff volumes that need to be addressed for each subbasin for the development to meet the stormwater management standards; d. Location and boundaries of proposed natural feature protection and conservation areas; e. Documentation and calculations for any applicable site design credits that are being utilized; f. Methodologies, assumptions, site parameters and supporting design calculations used in analyzing the pre-development hydrology; g. Evidence that an application for sewer service capacity has been made; h. For a subdivision or planned development, post-development runoff volumes, rates, and velocities shall be calculated based on the built-out conditions of the entire parcel to be subdivided, regardless of future ownership of individual lots; and i. Estimates of impervious surfaces shall be made based on maximum allowable lot coverage in accordance with section 16-29.001(38) of the Land Development Code when meeting the stormwater management standards in section 74-513(c) through (i). The owner of said subdivided parcel or applicant may provide the runoff reduction/water quality measures in accordance with sections 74-513(a) and (b) for individual lots and must be reflected accordingly on the final plat; (8) Stormwater management system. The description, scaled drawings and design calculations for the proposed post-development stormwater management system, which include: a. A map and/or drawing or sketch of the stormwater management measures, and the placement of existing and proposed structural stormwater controls, including design water surface elevations, storage volumes available from zero to maximum head, location of inlet and outlets, location of bypass and discharge systems, and all orifice/restrictor sizes; b. A narrative describing how the selected structural stormwater controls will be appropriate and effective; cross-section and profile drawings and design details for each of the structural stormwater controls in the system, including supporting calculations to show that the facility is designed according to the applicable design criteria; c. A hydrologic and hydraulic analysis of the stormwater management system for all applicable design storms (including stage-storage or outlet rating curves, and inflow and outflow hydrographs); d. Documentation and supporting calculations to show that the stormwater management system adequately meets the post-development stormwater management standards; e. Drawings, design calculations, elevations and hydraulic grade lines for all existing and proposed stormwater conveyance elements including stormwater drains, pipes, culverts, catch basins, channels, swales, and areas of overland flow; and f. Where applicable, a narrative describing how the stormwater management system corresponds with any watershed protection plans, total maximum daily load implementation plans, and/or local greenspace protection plans; (9) Post-development downstream analysis. In accordance with the Georgia Stormwater Management Manual, a downstream peak flow analysis which includes the assumptions, results and supporting calculations to show safe passage of post-development design flows downstream and which shall: a. Address each and every point or area along the site boundaries at which runoff will exit the property; b. Focus on the portion of the drainage Channel or watercourse immediately downstream from the development. This area shall extend downstream from the site to a point in the drainage basin where the development area is ten percent of the total basin area; and c. Calculate runoff volumes and discharge rates with consideration to be given to any planned future upstream land use changes; (10) Construction phase erosion and sedimentation control plan. An erosion and sedimentation control plan that shall include: a. Information on the sequence/phasing of construction and temporary stabilization measures and temporary structures that will be converted into permanent stormwater management measures; b. A proposed staged construction and inspection control schedule for approval; otherwise, the construction and inspection control schedule will be for the entire drainage system; c. A provision that no staged work related to the construction of Stormwater Management Measures or best management practices for erosion and sedimentation control shall proceed to the next stage of work, according to the sequence specified in the approved staged construction and inspection control schedule, until that stage has been inspected and approved; d. A construction sequencing plan; and e. A proposal for runoff reduction and water quality measures to be installed according to the construction sequencing plan as late in the construction process as practicable to prevent clogging, soil compaction and other issues; (11) Stormwater planting plan. A detailed landscaping and vegetation plan describing the woody and herbaceous vegetation that will be used within and adjacent to stormwater management measures. The stormwater planting plan must also include: a. The arrangement of planted areas, natural and greenspace areas and other landscaped features on the site plan; b. Information necessary to construct the landscaping elements shown on the plan drawings; c. Descriptions and standards for the methods, materials and vegetation that are to be used in the construction; density of plantings; d. descriptions of the stabilization and management techniques used to establish vegetation; and e. a description of who will be responsible for ongoing maintenance of vegetation for the stormwater management measures and how adequate vegetative cover is preserved; (12) Operation and maintenance agreement. An operation and maintenance agreement; and (13) Request for a determination of infeasibility. Any request for a determination of infeasibility.

(Ord. No. 2020-66(20-O-1498), § 1, 11-25-20)