8-6-6.5. - Small Cell Facilities in the Public Right-of-Way Permits.
(a) Purpose and Intent. The city council finds that the requirements of this section are necessary to establish a local policy concerning telecommunication service providers, accommodate the communication needs of residents, visitors and businesses while protecting the public health, safety and general welfare of the community. Further the city council intends to:
(1) Minimize adverse visual effects of small cell facilities in the public right-of-way through careful design and siting standards, including but not limited to compatible design techniques, appropriate screening and undergrounding of associated equipment whenever possible;
(2) Encourage collocation and maximize the use of existing and approved structures to accommodate new small cell facilities to reduce the number of support structures needed to serve the community;
(3) Encourage the deployment of smaller, less intrusive wireless communications facilities to replace or supplement existing larger wireless communications facilities;
(4) Promote competition in the provision of telecommunications services; and
(5) Facilitate the provision of wireless communications services to the residents, visitors and businesses of the city.
(b) Definitions. The following words and phrases used in this section shall have the following meanings unless the context clearly indicates otherwise:
Antenna shall mean any device used to transmit and/or receive radio or electromagnetic waves such as, but not limited to panel antennas, reflecting discs, microwave dishes, whip antennas, directional and non-directional antennas consisting of one or more elements, multiple antenna configurations, or other similar devices.
Collocation means the mounting or installation of transmission equipment on an eligible support structure for the purpose of transmitting and/or receiving radio frequency signals for communication purposes.
Eligible facilities request means any request for modification of an existing eligible support structure that does not substantially change the physical dimensions of such facility involving: (1) collocation of new transmission equipment; (2) removal of transmission equipment; or (3) replacement of transmission equipment.
Micro wireless facility means a small wireless facility that is no larger in dimensions than twenty-four inches in length, fifteen inches in width and twelve inches in height and that has an exterior antenna, if any, that is no more than eleven inches in length.
Public right-of-way means dedicated roads, streets, alleys and dedicated generic utility easements. The term does not include any portion of a road, street, alley or utility easement that was not dedicated to the city but was acquired by means of purchase, eminent domain, exchange of property or payment of other compensation, nor does it include specific-purpose utility easements, unless the specific purpose of the utility easement dedication permits the use of land for which an applicant applies. However, the city manager may declare a portion of a road, street or alley to be public right-of-way under this section if the manager finds that said portion of a road, street or alley is owned by the city and functions and will continue to function as a dedicated road, street, or alley does.
Small cell facility means any of the following:
A personal wireless communications facility as defined by the federal "Telecommunications Act of 1996" as amended as of August 6, 2014; or
A wireless communications facility that meets the following qualifications:
The facilities are mounted on structures fifty feet or less in height including their antennas; are mounted on structures no more than ten percent taller than other adjacent structures; or, do not extend existing structures on which they are located to a height of more than fifty feet or by more than ten percent, whichever is greater;
Each antenna is located inside an enclosure of no more than three cubic feet in volume or, in the case of an antenna that has exposed elements, the antenna and all of its exposed elements could fit within an imaginary enclosure of no more than three cubic feet; and
Primary equipment enclosures are no larger than twenty-eight cubic feet in volume as measured on the exterior surface of the enclosure. The following associated equipment may be located outside of the primary equipment enclosure and, if so located, is not included in the calculation of equipment volume: Electric meter, concealment, telecommunications demarcation box, ground-based enclosures, back-up power systems, grounding equipment, power transfer switch and cut-off switch; or
A micro wireless facility.
Small cell network means a collection of interrelated small cell facilities designed to deliver wireless service.
Telecommunications provider shall mean a person that provides telecommunications service or services, with the exception of cable services and aggregators of telecommunications services as those terms are defined by federal law. Telecommunications provider does not mean a person or business using antennas, support towers, equipment and/or buildings used to transmit high power over-the-air broadcast of AM and FM radio, VHF and UHF television and advanced television services, including high definition television.
Telecommunications services shall mean the offering of telecommunications for a fee directly to the public or to such classes of users as to be effectively available directly to the public, regardless of the facilities used.
Vertical infrastructure means an existing or new pole, including without limitation, a light pole, light standard, traffic signal or utility pole.
Wireless communications facility means a facility used to provide personal wireless services as defined in U.S.C. Section 332(c)(7)(C); or wireless information services provided to the public to such classes of users as to be effectively available directly to the public via licensed or unlicensed frequencies; or wireless utility monitoring and control services. A wireless communications facility does not include a facility that is an accessory use. A wireless communications facility includes an antenna or antennas, including without limitation, directional, omni-directional and parabolic antennas, small cell facilities, support equipment and their permitted supporting structure, but does not include the support structure for the wireless communications facility or its attached components if the use of such structure for the wireless communications facility is not the primary use. This term does not include mobile transmitting devices used by wireless service subscribers, such as vehicle hand held radios/telephones and their transmitting antennas.
(c) Scope and Applicability. No person shall construct an antenna, pole or other wireless communications facility, improvement or structure within the public right-of-way except in compliance with the provisions of this section or as approved pursuant to Section 8-6-6, "Requirements for Revocable Permits, Short-Term Leases and Long-Term Leases," B.R.C. 1981. Telecommunications providers or broadband providers may request permission to locate or collocate small cell facilities in the public right-of-way pursuant to the requirements of this section. The siting, mounting, placement, construction and operation of a small cell facility or a small cell network is a permitted use by right, subject to the requirements of this section, in the public right-of-way in any zone, provided that the conditions of this section are satisfied.
(d) Exceptions. Government-owned communications facilities located on city-owned property or public right-of-way are not subject to the requirements of this chapter.
(e) Design Standards. Small cell facilities may be permitted within the public right-of-way, if all of the following standards are met:
(1) Attached to Existing Facilities. Attachment of facilities on an existing or replacement traffic light pole, street-light standard or other vertical infrastructure is encouraged. These facilities may be permitted provided that:
(A) The owner of the vertical infrastructure approves the use;
(B) The facility meets the compatibility design techniques to conceal the equipment, and the facility, either:
i. Does not exceed the height of the existing infrastructure on which it is mounted by more than ten feet; or
ii. Does not exceed the height limitations for principal buildings and uses in Chapter 9-7, "Form and Bulk Standards," B.R.C. 1981, whichever results in a lesser height;
(C) Antenna installations on traffic signal standards are placed in a manner so that the size, appearance and function of the traffic signal will not be considerably altered; and
(D) Each antenna is located inside an enclosure of no more than three cubic feet in volume or, in the case of an antenna that has exposed elements, the antenna and all of its exposed elements could fit within an imaginary enclosure of no more than three cubic feet.
(2) Freestanding Facilities. Where a new freestanding facility is proposed (that is not an attachment to existing infrastructure or a replacement pole), a freestanding small cell facility may be permitted, provided that:
(A) The facility:
i. Proposes a new pole with an antenna that is architecturally compatible with the surrounding area through application of the compatibility requirements of this section; and
ii. Existing trees shall be preserved to the maximum extent possible in a manner that meets the requirements of Chapter 6-6, "Protection of Trees and Plants," B.R.C. 1981.
(B) The maximum facility height, including both vertical infrastructure and antenna, is not more than:
i. Thirty feet when the facility is within three hundred feet of a property of the P, RR-1, RR-2, RE, RL-1, RL-2, RM-1, RM-2, RM-3, RH-6 and MH zoning districts; and
ii. For all other zoning districts, the facility height does not exceed the height limitations for principal buildings and uses in Chapter 9-7, "Form and Bulk," B.R.C. 1981.
(C) Each antenna is located inside an enclosure of no more than three cubic feet in volume or, in the case of an antenna that has exposed elements, the antenna and all of its exposed elements could fit within an imaginary enclosure of no more than three cubic feet.
(3) Compatibility Required. Compatibility techniques shall be used in the design and siting of small cell facilities. The compatibility techniques will minimize or eliminate the visual impact of such facilities to surrounding uses. A small cell facility shall utilize compatibility techniques by:
(A) Utilizing or replacing existing permitted facilities (including without limitation, traffic signs, traffic signals, light poles or light standards) so that the presence of the small cell facility is not readily apparent;
(B) Integrating the equipment in an architectural feature of an existing structure;
(C) Integrating or attaching equipment to an outdoor fixture such as a traffic signal, light standard, utility pole or flagpole;
(D) Using a design which mimics or is consistent with the nearby natural or architectural features; and
(E) Being consistent with the size and shape of the pole-mounted equipment installed by communications companies on utility poles within three hundred feet of the facility.
(4) Non-reflective Materials. The visible exterior surfaces of small cell facilities, such as poles, antennas, vaults and equipment enclosure structures shall be constructed out of or finished with non-reflective materials and shall be painted to match as closely as possible the color and texture of the vertical infrastructure on which it is mounted.
(5) Equipment Vaults Below Grade. Except for the equipment that is expressly permitted above grade for a small cell facility, equipment vaults and other transmission equipment associated with the pole and antenna, shall be placed below grade when located within the public right-of-way. Such equipment may be placed above grade outside of the public right-of-way if compatibility techniques of this section are otherwise met.
(6) Multiple Users. To the extent practical, all small cell facilities shall be designed and constructed to permit such facility to accommodate at least two wireless service providers on the same facility.
(7) Separation. The facility shall be separated from all other wireless communications facilities and small cell facilities within the right-of-way by a distance of at least six hundred feet, unless the facility replaces an existing traffic signal, street-light pole or similar vertical infrastructure. In determining compliance with this separation requirement, the city manager may consider approved and pending applications for wireless communications facilities.
(8) Residential Areas. New freestanding facilities shall meet the following:
(A) When placed adjacent to a residential zoned property, the facility shall not be installed within the perpendicular extension of the front yard facing walls of the principal structure on the property or within the perpendicular extension of any walls of said structure facing a side yard that is adjacent to a street. The facility shall be located at least five feet from the nearest edge of the garage or driveway, whichever is closer. In the case of a corner lot, where practical, the facility shall be placed on the corner formed by two intersecting streets.
(B) When placed in a zone that is not classified as a residential zone, to the extent practical, the facility shall not be installed along a property with a residential use; where that is not practical, the facility shall be installed consistent with the standards in Subparagraph (e)(8)(A) of this section.
(C) For purposes of this section, front yard and side yard shall have the meanings defined in Section 9-16-1, "Definitions," B.R.C. 1981.
(9) Lighting. No exterior lighting may be installed for the benefit of small cell facilities, unless required by the FAA or other applicable governmental authority or the small cell facility is mounted on a light pole or other similar structure primarily used for lighting purposes.
(10) Historic Preservation. Any small cell facility that is constructed in a historic district shall be required to get an alteration certificate pursuant to Chapter 9-11, B.R.C. 1981. The city manager is the approval authority for alteration certificates and will use the standards and criteria in Section 9-11-18, "Standards for Landmarks Alteration Certificate Applications," B.R.C. 1981.
(11) Public Safety. Any ground mounted equipment shall be located in a manner necessary to address both public safety and aesthetic concerns in the reasonable discretion of the city manager. The applicant shall demonstrate that the vertical infrastructure to which any equipment is fastened to can safely support such equipment.
(12) Sidewalk Clearance. Any encroachment on a sidewalk shall maintain a minimum clearance of eight feet vertically and horizontally of unobstructed pedestrian way. The requirements of this paragraph may be modified by the city manager if reasonable passage is provided on the sidewalk and the safety of pedestrians, bicyclists and motorists is not impaired.
(13) Unreasonable Interference with Traffic and Parking Prohibited. Small cell shall not alter vehicular circulation or parking within the right-of-way or impede vehicular, bicycle or pedestrian access or visibility along the right-of-way. All equipment installations shall comply with the Americans With Disabilities Act and every other local, state and federal law and regulation. No small cell may be located or maintained in a manner that causes unreasonable interference. Unreasonable interference means any use of the right-of-way that disrupts or interferes with its use by the city, the general public or other persons authorized to use or be present upon the right-of-way, when there exists an alternative that would result in less disruption or interference. Unreasonable interference includes any use of the right-of-way that disrupts vehicular or pedestrian traffic, any interference with public utilities and any other activity that will present a hazard to public health, safety or welfare.
(14) The city manager may modify the design standards of this subsection (e) if the manager finds that the proposed design will result in an improved design with less adverse impacts than if the small cell facility met the design standards of this subsection.
(f) Compliance with Other Laws. Small cell facilities shall meet the requirements of the city of Boulder Design and Construction Standards, the requirements of Chapter 8-5, "Work in the Public Right-of-Way and Easements," B.R.C. 1981, Title 10, "Structures," B.R.C. 1981, and all other applicable local, state and federal laws.
(g) Abandonment and Removal. Any small cell facility in the public right-of-way that is not used for a period of six months or more shall be deemed to be abandoned. No small cell facility owner or applicant shall fail to remove a wireless communications facility that is abandoned or is unused for a period of six months. If the small cell facility owner fails to remove an abandoned facility at the request of the city manager, the city manager may remove the small cell facility and charge the costs to the small cell facility owner.
(h) Exclusion of Competitors Prohibited. No small cell facility owner or lessee or officer or employee thereof shall act to exclude or to attempt to exclude any other competitor from using the same structure for the location of other antennas.
(i) Conditions of Approval. Any construction proposed or design elements that are approved as part of a small cell application, to insure compliance with the provisions of this section, shall be considered conditions of approval granted for the small cell facility.
(j) Application Fee. An applicant for a small cell facility shall pay the fees described in Section 4-20-43, "Development Applications Fees," B.R.C. 1981, for wireless communications facilities.
(k) Application and review. Applications for wireless facilities in the public right-of-way shall be processed and reviewed using the review procedures and requirements described in Section 9-6-4(f)(5), "Wireless Communications Facility," B.R.C. 1981, for the review of initial applications and for eligible facilities requests. The city manager shall be the final approval authority for all eligible facilities requests.
(1) For small cell networks involving multiple individual small cell facilities the city will allow the applicant, at the applicant's discretion, to file a consolidated application and receive a single permit for the small cell network instead of filing separate applications for each individual small cell facility.
(2) For a consolidated application, each small cell facility within the consolidated application remains subject to review for compliance with the requirements of this section. The denial of any individual small cell facility is not a basis to deny the consolidated application as a whole or any other small cell facility incorporated within the consolidated application.
(3) If a wireless service provider applies to locate or collocate several wireless service facilities within the city, the city manager will:
(A) Allow the applicant, at the applicant's discretion, to file a single set of documents that will apply to all the wireless service facilities to be sited; and
(B) Render a decision regarding all the wireless service facilities in a single administrative proceeding.
(l) Submittal Requirements. The applicant shall submit a completed application, signal interference letter, fees, scaled site plan(s), photo simulation(s), scaled elevation view(s) and other supporting drawings, calculations and other documentation, signed and sealed by appropriate qualified professionals, showing the location and dimension of all improvements, including information concerning topography, radio frequency coverage, tower height, setbacks, drives, parking, fencing, landscaping, adjacent uses, drainage, and other information deemed by the city manager to be necessary to assess compliance with this section.
(m) Inventory of existing sites. Each applicant for a small cell facility shall provide to the city manager a narrative and map description of the applicant's existing or then currently proposed small cell facilities within the city, and outside of the city within one mile of its boundaries. In addition, the applicant shall inform the city generally of the areas of the city in which it believes small cell facilities may need to be located within the next three years. The inventory list should identify the site name, site address or general vicinity if no address is known and a general description of the facility (i.e. - rooftop antennas and ground mounted equipment). This provision is not intended to be a requirement that the applicant submit its business plan, proprietary information or make commitments regarding locations of small cell facilities within the city. Rather, it is an attempt to provide a mechanism for the city and all applicants for small cell facilities to share general information to promote competition and collocation, assist in the city's planning process and promote collocation by identifying areas in which small cell facilities might be appropriately constructed for multiple users.
(n) Information sharing. The city may share such information with other applicants applying for administrative approvals or permits under this chapter or other organizations seeking to locate small cell facilities within the city for planning purposes.
(o) Indemnification. As a condition of the permit, the wireless service provider shall agree, at its sole cost and expense, to indemnify, hold harmless and faithfully defend the city, its officials, boards, commissions, commissioners, agents and employees against any claims, suits, causes of action, proceedings and judgments for damages or equitable relief arising out of the construction, maintenance or operation of its equipment authorized by this section. This will apply whether the act or omission complained of is authorized, allowed or prohibited by applicable law or a permit requirement, except in cases where liability is solely caused by the gross negligence of the person or persons covered by the indemnity.
(p) Federal requirements. All small cell facilities shall meet the current standards and regulations of the FAA, the FCC and any other agency of the federal government with the authority to regulate small cell facilities. If such standards and regulations are changed, then the owners of the small cell facilities shall bring such facility into compliance with such revised standards and regulations within the time period mandated by the controlling federal agency.
(q) Radio frequency standards. All small cell facilities shall comply with federal standards for radio frequency emissions.
(r) Signal interference. All small cell facilities shall be designed and sited so as not to cause interference with the normal operation of radio, television, telephone and other communication services utilized by adjacent residential and non-residential properties; nor shall any such facilities interfere with any public safety communications.
(s) Operation and maintenance. To ensure the structural integrity of small cell facilities, the owner of a small cell facility shall ensure that it is maintained in compliance with standards contained in applicable local building and safety codes. If upon inspection, the city concludes that a small cell facility fails to comply with such codes and constitutes a danger to persons or property, then, upon written notice being provided to the owner of the small cell facility, the owner shall have thirty days from the date of notice to bring such small cell facility into compliance. Upon good cause shown by the owner, the city manager may extend such compliance period. If the owner fails to bring such small cell facility into compliance within said time, the city may remove such small cell facility at the owner's expense.
(t) Modifications. The city manager may approve a modification to the requirements of this section that would result in a violation of state or federal law or in accordance with Section 1.05, "Alterations, Modifications, and Waivers," of the City of Boulder Design and Construction Standards.
(u) The approval under this section for any small cell facility expires if the small cell facility is not established within one year of the approval or if it is abandoned or unused for a period of six months.
Ordinance Nos. 8215 (2017); 8373 (2019); 8556 (2023); 8694 (2025)