§ 52.04 — Stormwater Management Plan (SWMP)
Saint Paul Legislative Code (Supp. No. 133, Update 1: codified through Ordinance No. 26-26, adopted May 13, 2026) · Saint Paul Legislative Code § 52.04
Corpus is an independent public-information project, not the official City of St. Paul website. Stable reference: corpuslaw.us/code/19844ed5-0852-479a-aff7-610a233bb4e8
Sec. 52.04. - Stormwater Management Plan (SWMP).
Any person, firm, sole proprietorship, partnership, corporation, state agency, or political subdivision proposing a land disturbance of greater than one-quarter (¼) acre that triggers a site plan review per city code or a construction activity of equal to or greater than one (1) acre within the city shall submit a SWMP to the city for approval. The city, based upon the current version of the National Pollutant Discharge Elimination System (hereinafter, "NPDES") NPDES construction general permit in effect at the time the SWMP is submitted, may also require a Stormwater Pollution Prevention Plan (hereinafter, "SWPPP") based on the NPDES construction stormwater general permit and the SWMDS standards then in effect. No land shall be disturbed until the SWMP, conforming to the standards set forth within the SWMDS, is approved by the city. (a) Stormwater runoff rate control. Stormwater runoff rate control is required for sites larger than one-quarter (¼) of an acre which go through the city's site plan review process. Stormwater discharge into public storm sewers shall be controlled, in accordance with the SWMDS. Post land disturbance activity runoff rates shall not exceed existing runoff rates for the 2-year, 10-year, and 100-year 24-hour storm events using Atlas 14 precipitation depths and MSE3 storm distributions. Runoff rates may be restricted to less than the existing rates when the capacity of downstream conveyance systems is limited. Discharge of all stormwater runoff and surface water shall be in a fashion so as to preclude drainage onto adjacent property or toward buildings. (b) Flood control for buildings. The low floor elevation for new habitable buildings must be a minimum of two (2) foot above the critical one hundred-year flood elevation and at least four (4) feet above normal groundwater elevation, provided; additional requirements as defined in the SWMDS shall be applied as specified therein. (c) Temporary sediment basins. For common drainage locations that serve an area with ten (10) or more acres disturbed at one (1) time, a temporary (or permanent) sediment basin must be provided prior to the runoff leaving the construction site or entering surface waters. In addition to this requirement, the applicant is encouraged to install temporary sediment basins where appropriate in areas with steep slopes or highly erodible soils even if less than ten (10) acres drains to one (1) area. The basins must be designed and constructed in accordance with the current version of the NPDES construction stormwater general permit. (d) Volume control and water quality. (1) Any construction activity, including new development, redevelopment, and linear projects, with a land disturbance of greater than or equal to one (1) acre, including smaller individual sites that are part of a common plan of development or sale, within the city's jurisdiction, must meet the volume control and water quality requirements outlined in the SWMDS and the current version of the NPDES construction stormwater general permit. (2) At a minimum these facilities must conform to the most current technology as reflected in the current version of the SWMDS, MPCA's Minnesota Stormwater Manual, and NPDES construction stormwater general permit. (3) Permanent stormwater best management practices (herein "BMPs") to be designed by a professional engineer licensed in the state. Constructed controls must be certified by a professional engineer as required in section 52.04(f)(3). (e) Models/methodologies/computations. Hydrologic models and design methodologies used by the applicant for determining runoff characteristics and analyzing stormwater management structures must be approved in writing by the city. Unless otherwise approved by the city in writing, plans, specifications and computations for stormwater management facilities submitted for city review must be sealed and signed by a licensed professional engineer. (f) Inspection and maintenance of the SWPPP. (1) The applicant must routinely inspect the construction site as specified in the SWMDS. (2) The city is authorized to perform inspections and enforce provisions of this chapter as may be required to ensure that erosion and sediment control measures are properly installed and maintained. If the applicant fails to maintain proper erosion control measures on site and/or perform necessary remedial action, as directed by the inspector, the inspector may take such enforcement action as may be required to achieve compliance. Enforcement may be, but is not limited to, stopping all construction work at the site, until necessary remedial actions have been completed and erosion and sediment controls are in compliance with the approved plans. (3) For sites that require permanent stormwater management BMPs, a certification letter shall be submitted after the facilities have been installed to affirm that construction has been completed in accordance with the approved SWMP. At a minimum, certification shall include a set of as-built drawings, signed by a licensed professional engineer, comparing the approved SWMP with what was constructed. Other information shall be submitted as required by the city or other approving agency under the SWMDS. (4) It shall be the responsibility of the applicant to obtain any necessary easements required to allow city access to the stormwater management facilities for inspection and maintenance purposes. Such easements must be submitted for review and approval by the city. (5) All SWMP facilities must be designed to minimize the need of maintenance, to provide easy vehicle and personnel access for maintenance purposes and must be structurally sound. These facilities must have a plan of operation and maintenance that ensures continued effective removal of the pollutants carried in stormwater runoff. All facility operation and maintenance plans required under the SWMDS shall be submitted for review and approval by the city.
(C.F. No. 04-267, § 1, 4-7-04; Ord 23-17, § 1, 4-12-23)
Ask a question about St. Paul law
Corpus searches the St. Paul sections it holds and shows the ones that match, with their citations. Free, no sign-in.