Provision of Stage 2 mobile support.
47 C.F.R. § 54.1513
in effectEffective (a) A recipient of Stage 2 mobile support shall commit to, at a minimum, the full restoration of its pre-hurricane network coverage area, as determined by FCC Form 477 reporting standards, at a level of service that meets or exceeds pre-hurricane network levels and at reasonably comparable levels to those services and rates available in urban areas.
(b) Each recipient of Stage 2 mobile support shall demonstrate mobile network coverage that is equal to or greater than 66 percent of its pre-hurricane coverage by the end of year two of the Stage 2 term of support, and that is equal to or greater than 100 percent of its pre-hurricane coverage by the end of year three of the Stage 2 term of support.
Source: eCFRURL: https://www.ecfr.gov/api/versioner/v1/full/2024-07-01/title-47.xmlFetched: 7/26/2026
