For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 15.01.355 — Required electrical inspections

Henderson Municipal Code (Supp. No. 59: codified through Ordinance No. 4163, adopted June 16, 2026) · Henderson Municipal Code § 15.01.355

Corpus is an independent public-information project, not the official City of Henderson website. Stable reference: corpuslaw.us/code/1b05e98c-48d4-4924-9ebd-2ccbb3913dba

15.01.355 - Required electrical inspections.

Upon receipt of a proper inspection request, the building official shall perform the following electrical inspections: A. Concrete-encased electrode ground inspection. An inspection of the concrete-encased electrode ground shall be performed before or concurrently with the building foundation inspection and prior to the foundation being poured. The concrete-encased electrode ground shall be installed per the electrical code. B. Underground electrical inspection. An underground electrical inspection shall be performed before the building concrete slab or under-floor inspection and after all in-slab or under-floor building service equipment items are in place, but before any concrete is poured or floor sheathing is installed, including sub-flooring. C. Rough electrical inspection. A rough electrical inspection shall be performed before or concurrently with the building framing inspection and after the initial installation of all electrical equipment and conduit or wiring. D. Other electrical inspections. Depending on the type of electrical installation, inspection of additional electrical system components may be required by the building official. E. Final electrical inspection. A final electrical inspection shall be performed when the electrical work is complete and prior to any use or occupancy.

(Ord. 2736, § 1 (part), 2008)

Ask a question about Henderson law

Corpus searches the Henderson sections it holds and shows the ones that match, with their citations. Free, no sign-in.