§ 20-264 — Grading and drainage regulations; design standards for fills

Peoria, Arizona, City Code (2026 S-10: Local legislation current through Ord. 2026-20, passed 10-6-26) · Peoria, Ariz., City Code § 20-264

Corpus is an independent public-information project, not the official City of Peoria website. Stable reference: corpuslaw.us/code/1b067aab-5e91-4867-8a4b-3fc5f2bffa3a

Sec. 20-264. Grading and drainage regulations; design standards for fills.

(a) Finishing. All material placed as fill shall be bladed and graded to a uniform surface and shall not be left on the site as irregular dumping. (b) Compaction. All fills shall be compacted to not less than the minimum densities as listed in the Maricopa Association of Governments Specifications, Section 601. Fills which will support the foundations of structures shall be constructed under the supervision of a registered Civil Engineer licensed by the State of Arizona. EXCEPTIONS: (1) Fills in non-hillside areas that are made for yard purposes and which do not exceed 18" in depth need not be compacted. (2) Sanitary landfills and refuse disposal areas that hold a valid aquifer protection permit issued by the State and that regulated by the State and County. When foundations of structures are not to be supported by the fill, the Engineering Director may allow deviations from the above requirements if he finds that their strict enforcement is unduly restrictive for the intended purpose. (c) Preparation of Ground. The area over which fills are to be made shall be cleared of all trash, trees, stumps, timber, debris, or other material not suitable as a foundation for a fill. Where slopes are five horizontal to one vertical or steeper, scarifying or benching into sound bedrock or other competent material shall be required. Five feet (5') of the lower most bench shall be exposed beyond the toe of the fill. The bench shall be sloped for sheet overflow or a paved drain shall be provided. (d) Fill Slope. No fill shall be made which creates an exposed surface steeper in slope than one and one-half horizontal to one vertical. The Engineering Director may require that the fill be constructed with an exposed surface flatter than one and one-half horizontal to one vertical if this is necessary for stability and safety. (e) Fill Material. The material to be used for fill shall be approved by the engineer prior to use when the fill is to support the foundations of structures. No organic material shall be permitted in fills. When the fill material includes large rocky or hard lumps, such as hardpan or cemented gravel which cannot be broken readily, such material shall be well distributed throughout the fill. Sufficient earth of other fine material shall be placed around the larger material as it is deposited so as to fill the interstices and produce a dense, compact fill. However, such material shall not be placed within two feet (2') of the finished grade of the fill. (f) Drainage Terraces. All fill slopes in excess of thirty feet (30') vertical height shall have paved drainage terraces at vertical intervals not exceeding twenty-five feet (25'). Where only one terrace is required, it shall be at mid-height. Such terraces shall drain into a paved gutter, pipe, or other watercourse adequate to convey the water in a safe disposal area. The terrace shall be at least six feet (6') wide. (g) Slopes to Receive Fill. Fills toeing out on natural slopes which are steeper than two horizontal to one vertical will not be permitted. (Ord. No. 98-95, enacted, 8/26/98; Ord. No. 02-41, 6/7/02, amended (SUPP 2002-2))

Ask a question about Peoria law

Corpus searches the Peoria sections it holds and shows the ones that match, with their citations. Free, no sign-in.