Sec. 10-134. - Required findings.

Before issuing an erosion response permit, the planning director must find that: (1) Any new construction seaward of the erosion setback line includes the following criteria: a. The proposed construction is for or related to a public or private elevated dune walkover, a beach access roadway, public parking facility, or associated public facilities and amenities, which will be constructed under the Texas General Land Office construction standards. b. New construction on a lot platted prior to August 31, 2010, and there are no practicable alternatives to the construction of the structure or a portion of the structure seaward of the erosion setback line exist. For purposes of this subparagraph, practicable means available and capable of being done after taking into consideration existing building practices, siting alternatives, FEMA requirements, and the footprint of the structure in relation to the area of the buildable portion of the lot, and considering the overall development scheme for the property. c. The applicant will comply with any compensatory mitigation requirements for unavoidable adverse effects on dunes and dune vegetation. d. The construction relates to the repair, reconstruction, or modification of an existing structure located seaward of the erosion setback line prior to August 31, 2010, if any modifications do not increase the footprint of the structure. Structures seaward of building setback line that have been damaged more than fifty (50) per cent of their value or destroyed, or have been abandoned (e.g., not occupied or used) for more than twelve (12) months shall be subject to the construction standards in section 10-134(2). (2) The following construction requirements have been met: a. The plans and certifications for the structure have been prepared and sealed by a registered professional engineer licensed in the State of Texas providing evidence of the following: 1. There is a minimum two-foot freeboard above base flood elevation ("BFE"). 2. There are no enclosures exceeding three hundred (300) square feet below BFE. 3. The elevated building foundations are adequate and there is proper placement, compaction, and protection of fill when used as construction for all newly constructed, substantially damaged, and substantially improved buildings elevated on pilings, posts, piers, or columns in accordance with the latest edition of specifications outlined in American Society of Civil Engineers, Structural Engineering Institute, Flood Resistant Design and Construction, ASCE 24-05. 4. It is not feasible to relocation of a habitable structure seaward of the erosion setback line. 5. All construction is designed to minimize impacts on natural hydrology. b. All construction will be landward of the landward toe of the foredune ridge, where practicable. (3) The applicant is taking all steps necessary to preserve, restore, and enhance any critical sand dunes for natural storm protection and conservation purposes that are located on the applicant's property, including any common areas in which the applicant has an interest. The necessary steps must include the following: a. Restoring and filling in gaps and blowouts in the foredune ridge. b. Planting dune vegetation, using appropriate native plant species. c. Limiting the use of fertilizer and mowing. (4) The proposed construction does not involve a prohibited activity as defined in section 10-136. (5) The proposed construction activity will not materially weaken dunes or materially damage dune vegetation seaward of the erosion response line based on substantive findings under section 10-137. (6) There are no practicable alternatives to the proposed activity and adverse effects cannot be avoided as provided in section 10-138. (7) The applicant's mitigation plan will adequately minimize, mitigate, and compensate for any unavoidable adverse effects, as provided in section 10-138. (8) The proposed activity complies with any applicable requirements of article IV (requirements for beachfront construction certificates), article V (concurrent requirements for both dune protection permits and beachfront construction certificates), and article VI (management of the public beach) of these regulations.

(Ord. No. 029541, § 10, 6-26-2012)