For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

PREFERENCE TO MAINE WORKS AND CONTRACTORS

M.R.S. tit. 26, ch. 15
in effect

26 M.R.S. §1301 Local residents preferred; exception

26 M.R.S. §1302 Proposals and bids recorded

26 M.R.S. §1303 Public works; minimum wage and benefits; assisted projects

26 M.R.S. §1304 Definitions

26 M.R.S. §1305 Policy declared

26 M.R.S. §1306 Fair minimum rate of wages and benefits; determination

26 M.R.S. §1306-A Assisted project

26 M.R.S. §1307-A Minimum wage and benefits rate on construction projects

26 M.R.S. §1308 Prevailing wages and benefits established at regular intervals; how determined

26 M.R.S. §1309 Contract to contain provisions relative to rate of wages and benefits to be paid

26 M.R.S. §1310 Wage and benefits rates to be kept posted

26 M.R.S. §1311 Wage and benefit record of contractor

26 M.R.S. §1312 Penalties for violation

26 M.R.S. §1313 Existing contracts

26 M.R.S. §1314 Exceptions

26 M.R.S. §1315 Cooperation with the United States Department of Labor

26 M.R.S. §1317 Construction safety training requirements for craft workers

Source: Maine Legislature, Office of the Revisor of Statutes (legislature.maine.gov)URL: https://legislature.maine.gov/statutes/26/title26ch15sec0.htmlFetched: 10/20/2026