22.803.020 - Minimum requirements for all discharges and real property
A. Requirement to provide documentation and to map infrastructure. The owner is required to make plans, procedures, and schedules required by this subtitle available to the Director when requested. When requested to aid in applying the Stormwater Code, the owner must provide to the Director a complete map of all drainage, side sewer, and plumbing infrastructure on the property. B. Requirement to report spills, releases, or dumping. A responsible party is required to, at the earliest possible time, but in any case within 24 hours of discovery, report to the Director of SPU a spill, release, dumping, or other situation that has contributed or is likely to contribute pollutants to a public drainage system, a private drainage system, or a receiving water. This reporting requirement is in addition to, and not instead of, any other reporting requirements under federal, state or local laws. C. Requirements to maintain facilities. All treatment facilities, flow control facilities, drainage control facilities, and drainage systems shall be maintained as specified in rules promulgated by the Director in order for these facilities and systems to be kept in continuous working order. Facility components must be kept accessible for inspection and maintenance purposes, including for inspections conducted by the City. D. Requirements for disposal of waste from maintenance activities. Disposal of waste from maintenance of drainage control facilities shall be conducted in accordance with federal, state and local regulations, including the Minimum Functional Standards for Solid Waste Handling, Chapter 173-304 WAC, guidelines for disposal of waste materials, and, where appropriate, Dangerous Waste Regulations, Chapter 173-303 WAC. E. Requirements to maintain records of installation and maintenance activities. When a drainage control facility is installed, the party having the facility installed shall make records of the installation and shall identify the party (or parties) responsible for maintenance and operations. The parties shall retain a continuous record of all maintenance and repair activities, and shall retain the records for at least ten years. If a transfer of ownership occurs, these records of installation, repair, and maintenance shall be transferred to the new property owner. These records shall be made available to the Director of SPU during inspection of the facility and at other reasonable times upon request of the Director of SPU.
(Ord. 127444, § 4, 2026; Ord. 126336, § 3, 2021; Ord. 124872, § 32, 2015; Ord. 123105, § 3, 2009.)
Ask a question about Seattle law
Corpus searches the Seattle sections it holds and shows the ones that match, with their citations. Free, no sign-in.