Responsibilities.
Round Rock Code of Ordinances § 44-186
in effectSec. 44-186. - Responsibilities.
(a) All property owners shall comply with the applicable provisions of this article. In the event of any changes to the plumbing system, it is the responsibility of the property owners to notify the director. All property owners are also responsible for the following:
(1) Payment of all costs designated the responsibility of the property owner pursuant to this article, and the purchase and installation of the assemblies required by this article.
(2) To install all assemblies in accordance with this article and acceptable industry practices.
(3) If not obtained by the licensed backflow prevention assembly tester, apply for and obtain a building permit from the building official of the city prior to commencing any work, including testing of, on any assembly device.
(b) All water customers shall comply with the applicable provisions of this article. All water customers are also responsible for the following:
(1) Payment of all costs designated the responsibility of the water customer pursuant to this article, and all maintenance, testing and required repairs excluding costs for installation and initial testing of assemblies required by this article.
(2) All commercial establishments shall annually test, or cause to be tested, all assemblies on the premises. Such tests must be conducted by a licensed backflow prevention assembly tester who is registered with the city.
(3) Maintain all assemblies in proper working order at all times, including making repairs as required to ensure the proper functioning of the assemblies.
(5) Maintain all assemblies such that the assemblies may be tested by a method that has been approved by the director.
(6) Each record related to assembly installation, testing and repair shall be maintained on the premises for a minimum of three years.
(c) All licensed backflow prevention assembly testers shall:
(1) Annually register with the third party vendor, pay any required fee, and provide the information required by this article.
(2) Maintain testing equipment in proper working condition/calibration.
(3) Maintain the design or operation characteristics of an assembly.
(4) Ensure that devices are tested in compliance with accepted industry practices, commission regulations, and all other applicable laws and regulations.
(5) Enter the required testing data, including test gauge serial numbers, on third party vendor's website.
(6) Report test results electronically to the third party vendor's website within five days of testing. For any new assemblies, either new installs or previously undocumented assemblies not in the third party vendor's system, the tester may submit by e-mail or fax the test results to the third party vendor for the initial year.
(7) Provide a copy of the completed initial test report required after installation to the property owners subject to the testing requirements of this article. All other completed test reports after the initial test report shall be provided to the water customer.
(8) Maintain each testing and/or repair record for a minimum of three years.
(9) If not obtained by the property owner, apply for and obtain a building permit from the building official of the city prior to commencing any work, including testing, on any assembly device.
(10) Pay the third party vendor fee as a data entry charge for each test report submitted to the third party vendor's website.
(11) Immediately turn off all devices that fail a test.
(d) The director shall have the authority to enforce the provisions of this article, state law and regulations regarding cross connections. The director shall inspect and initially test, or cause to be tested, all assemblies installed pursuant to the requirements of this article. Permanent water service shall not be provided to new facilities until all assemblies have been tested and are functioning properly. Except in cases where the testing of assemblies must be delayed until the installation of internal production or auxiliary equipment, the director shall not approve a certificate of occupancy until all assemblies have been tested and are functioning properly.
(e) The third party vendor shall:
(1) Through the use of its proprietary software, maintain an online database and website for testers to register and input test reports.
(2) Send by mail a notice to the water customer approximately 30 days prior to the testing due date, advising the water customer that the assembly is due for testing, and transmit a copy of the notice to the last tester of record.
(3) Send by mail a second notice to the water customer once the testing due date has passed if a test report for the assembly has not been submitted.
(4) Transmit a notice of noncompliance to the director by electronic transmission if the third party vendor fails to receive a test report within 15 day of the mailing the second notice.
(Code 1995, § 10.714; Ord. No. O-2015-2423, § I, 5-14-2015; Ord. No. O-2016-3846, § I, 10-27-2016)
Source: City of Round Rock, Texas, Code of Ordinances (Municode Library, library.municode.com)URL: https://library.municode.com/tx/round_rock/codes/code_of_ordinances?nodeId=PTIICOOR_CH44UT_ARTVIICRCOCOPR_S44-186REFetched: 11/16/2026
