§ 26-156 — National Categorical Pretreatment Standards
Code of Ordinances, City of Denton, Texas (Supp. No. 37, Update 1: codified through Ordinance No. 26-296 adopted March 24, 2026) · Denton City Code § 26-156
Corpus is an independent public-information project, not the official City of Denton website. Stable reference: corpuslaw.us/code/1e3caa26-fe99-4fb9-b84b-13d240826193
Sec. 26-156. - National Categorical Pretreatment Standards.
Users must comply with the categorical pretreatment standards found at 40 CFR Chapter I, Subchapter N, Parts 405—471. (a) Where a categorical pretreatment standard is expressed only in terms of either the mass or the concentration of a pollutant in wastewater, the city manager, or their designee, may impose equivalent concentration or mass limits in accordance with 40 CFR Part 403.6(c)(1). (b) When the limits in a categorical pretreatment standard are expressed only in terms of mass of pollutant per unit of production, the city manager, or their designee, may convert the limits to equivalent limitations expressed either as mass of pollutant discharged per day or effluent concentration for purposes of calculating effluent limitations applicable to individual industrial users. (c) When wastewater subject to a categorical pretreatment standard is mixed with wastewater not regulated by the same standard, the city manager, or their designee, shall impose an alternate limit in accordance with 40 CFR 403.6(e). (d) Once included in its permit, the industrial user must comply with the equivalent limitations developed in this section, in lieu of the promulgated categorical standards from which the equivalent limitations were derived. (e) Many categorical pretreatment standards specify one limit for calculating maximum daily discharge limitations and a second limit for calculating maximum monthly average, or four-day average, limitations. Where such standards are being applied, the same production or flow figure shall be used in calculating both the average and the maximum equivalent limitation. (f) Any industrial user operating under a permit incorporating equivalent mass or concentration limits calculated from a production-based standard shall notify the city manager, or their designee, within two (2) business days after the user has a reasonable basis to know that the production level will significantly change within the next calendar month. Any user not notifying the city manager, or their designee, of such anticipated change will be required to meet the mass or concentration limits in its permit that were based on the original estimate of the long term average production rate.
(Ord. No. 21-242a, § 1, 3-16-21)
Ask a question about Denton law
Corpus searches the Denton sections it holds and shows the ones that match, with their citations. Free, no sign-in.
