§ 30-175 — Removal of overhead structures or poles; limitations on new installations; adaptation of existing service facilities
Code of the City of Charleston, South Carolina (Supp. No. 115: codified through Ordinance No. 2026-092, enacted May 26, 2026) · Charleston, S.C., City Code § 30-175
Corpus is an independent public-information project, not the official City of Charleston website. Stable reference: corpuslaw.us/code/1e59def7-c91f-4a3f-8fe7-9807abd79758
Sec. 30-175. - Removal of overhead structures or poles; limitations on new installations; adaptation of existing service facilities.
(a) When any street or portion thereof within the city is designated as a district, any person, firm, company or corporation owning or maintaining overhead wires or equipment, associated overhead structures or poles serving the same in such street or portion thereof shall remove such wires and equipment, associated structures and poles prior to or concurrently with the underground placement of non-standard service utilities in the district and shall install same underground concurrently with the underground placement of non-standard service utilities in the district, with the exception of such poles as are necessary to support street lighting, traffic signals and transmission lines above forty-three thousand (43,000) volts. (b) It shall be unlawful for any person to erect, construct, maintain or use any pole, overhead wires or associated structure within a district, excepting such poles as are necessary to support street lighting, traffic signals, and transmission lines above forty-three thousand (43,000) volts, after the date when such utilities are required to have been removed, or after a reasonable period of time after the designation by City Council of a district or the extension of a district. (c) All conduits, conductors and associated equipment necessary to receive utility service between service conductors or underground pipe or conduit of the supplying utility and the service facilities to the structure being served shall be provided by the person owning such property. Such required construction shall be accomplished within one hundred eighty (180) days after the installation of the utility's facilities.
(Ord. No. 2021-052, § 1, 4-13-21)