For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 6-25-9 — General installation policies and procedures

Memphis Code of Ordinances (Supp. No. 33: codified through Ordinance No. 5959, enacted May 12, 2026) · Memphis Code of Ordinances § 6-25-9

Corpus is an independent public-information project, not the official City of Memphis website. Stable reference: corpuslaw.us/code/1e872db6-f8b9-464b-9dbd-391494799477

Sec. 6-25-9. - General installation policies and procedures.

A. Timing of installations. To minimize interference with the safe use, operation and maintenance of the right-of-way, and as reasonably necessary to manage the right-of-way, the city engineer may limit the timing of access so that, to the extent possible, there is no more than one utility cable installation project underway at any given time on any particular segment of a state freeway. B. Location and alignment criteria. 1. General location policy. To minimize interference with the safe use, operation and maintenance of the city's streets, longitudinal installations of utility systems and facilities shall be located outside the travelled way and as near to the outer edge of the right-of-way line as is reasonably practical; provided, however, that alternative locations within the right-of-way, including the travelled way, may be permitted where the city engineer determines that it is not reasonably practical to locate the utility systems and facilities along the outer edge of the right-of-way and that the use of the alternative location is consistent with the city's goal to minimize interference with the safe use, operation and maintenance of the streets and highways. 2. Horizontal and vertical clearance zones. As a general rule, subsequent installations of underground utility systems and facilities outside the travelled way shall be located not less than three feet from any previously installed utility system or other utility installation, if any, within the city's right-of-way or such greater clearance zones required by utility codes as they relate to electrical, water, gas or sewer systems. Exceptions may be considered on a case-by-case basis and as may be reasonably necessary to manage the city's right-of-way. 3. Depth. All underground utility systems and facilities shall be located and installed in accordance with a minimum depth of 36 inches, or at such greater depths as the city engineer may require as a special condition of a right-of-way agreement or as shall be necessary to comply with the horizontal and vertical clearance zone requirement. 4. Access points. Devices for accessing underground utility systems and facilities for routine service or site visits shall not be allowed within the travelled way, except as the city engineer may otherwise expressly permit or require. 5. Support facilities. All above-ground support facilities for underground utility systems and facilities shall be located outside the travelled way and as near to the outer edge of the right-of-way line as is reasonably practical. No above-ground facility may be located on the city's right-of-way without the express written approval of the city engineer. 6. Attachment to roadway and roadside structures. The attachment of utility systems and facilities to roadway and roadside structures — including without limitation bridges, overpasses, underpasses, culverts and tunnels — shall be permitted only with the prior written approval of the city engineer.

(Ord. No. 5807, 11-16-2021)

Ask a question about Memphis law

Corpus searches the Memphis sections it holds and shows the ones that match, with their citations. Free, no sign-in.