For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 138-166 — Permit required

Atlanta City Code (Code of Ordinances, Part II) (Supp. No. 108, Update 1: codified through Ordinance No. 2026-37 (26-O-1511), enacted September 30, 2026) · Atlanta City Code § 138-166

Corpus is an independent public-information project, not the official City of Atlanta website. Stable reference: corpuslaw.us/code/1eeceb88-b906-40f9-933a-623b1d0872c7

Sec. 138-166. - Permit required.

(a) A permit is required to collocate a small wireless facility in the public right of way or to install, modify, or replace a pole or a decorative pole in the public right of way. A permit is not required to perform the activities described in O.C.G.A. § 36-66C-6(e) or (f). (b) Any person seeking to collocate a small wireless facility in the public right of way or to install, modify, or replace a pole or a decorative pole in the public right of way shall submit an application to the department of transportation for a permit. Applications are available from the department of public works, office of transportation. Any material change to information contained in an application shall be submitted in writing to the department of transportation within 30 days after the events necessitating the change. (c) Each application for a permit shall include the maximum application fees permitted under O.C.G.A. § 36-66C-5(a)(1), (a)(2) and (a)(3). Such maximum application fees shall automatically increase on January 1 of each year beginning January 1, 2021, as provided under O.C.G.A. § 36-66C-5(b). (d) The department of transportation shall review applications for permits according to the timelines and using the procedures identified in O.C.G.A. §§ 36-66C-7 and 36-66C-13. (e) Applications for permits shall be approved except as follows: (1) In order to receive a permit to install a pole or replace a decorative pole, the applicant must have determined after diligent investigation that it cannot meet the service objectives of the permit by collocating on an existing pole or support structure on which: (i) the applicant has the right to collocate subject to reasonable terms and conditions; and (ii) such collocation would not impose technical limitations or significant additional costs. The applicant shall certify that it has made such a determination in good faith, based on the assessment of a licensed engineer, and shall provide a written summary of the basis for such determination. (2) The department of transportation may deny an application for a permit upon any of the conditions identified in O.C.G.A. § 36-66C-7(j), including, but not limited to: (i) interference with traffic control equipment; (ii) interference with site lines or clear zones; (iii) non compliance with the ADA or similar laws regarding pedestrian access or movement; (iv) interference with road widening, repair, reconstruction, or relocation that has been advertised for bid and scheduled for completion within six months; (v) interference with laws governing management of the right-of-way or that address pedestrian and vehicular traffic and safety requirements; (vi) failure to comply with applicable codes; (vii) exceeding maximum height limitations provided for in this division; (viii) failure to comply with historic district, residential zoning district, or decorative pole requirements identified in O.C.G.A. §§ 36-66C-10, 36-66C-11 or 36-66C-12 (ix) interference with public works construction projects; (x) applications that request ground-mounted equipment be located more than 7.5 feet in radial circumference from the base of the pole. (3) For applications for new poles in the public right of way in areas zoned for residential use, the department of transportation may propose an alternate location in the public right of way within 100 feet of the location set forth in the application, and the wireless provider shall use the department of transportation's proposed alternate location unless the location imposes technical limits or significant additional costs. The wireless provider shall certify that it has made such a determination in good faith, based on the assessment of a licensed engineer, and it shall provide a written summary of the basis for such determination. (f) A permit issued under this division shall authorize such person to occupy the public rights of way to: (i) collocate a small wireless facility on or adjacent to a pole or a support structure that does not exceed the limitations set forth in O.C.G.A. § 36-66C-7(h)(3) or on or adjacent to a decorative pole in compliance with O.C.G.A. § 36-66C-12; and (ii) install, modify, or replace a pole or decorative pole for collocation of a small wireless facility that does not exceed the limitations set forth in O.C.G.A. § 36-66C-7(h)(1) and (h)(2). (g) Upon the issuance of a permit under this division, and on each anniversary of such issuance, every person issued a permit shall submit to the city the maximum annual payments permitted under O.C.G.A. § 36-66C-5(a)(4) and (a)(5); provided, however, that if such person removes its small wireless facilities from the public rights-of-way pursuant to O.C.G.A. § 36-66C-5(e), then such person shall be responsible for the pro rata portion of the annual payment based on the number of days of occupation since the last annual payment. Upon making such pro rata payment and removal of the small wireless facilities, the person's annual payment obligations under this section shall cease as of the date of the actual removal. The maximum annual payments shall automatically increase on January 1 of each year beginning January 1, 2021, as provided under O.C.G.A. § 36-66C-5(b). (h) Any person issued a permit shall pay the fees identified in O.C.G.A. § 36-66C-5(a)(6) and (a)(7), as applicable. (i) The city may revoke a permit issued pursuant to this division if the wireless provider or its equipment placed in the public right of way under that permit subsequently is not in compliance with any provision of this division or the Georgia Streamlining Wireless Facilities and Antennas Act. Upon revocation, the city may proceed according to (j). (j) If a wireless provider occupies the public rights of way without obtaining a permit required by this division or without complying with the SWFAA, then the city may, at the sole discretion of the city, restore the right of way, to the extent practicable in the reasonable judgment of the city, to its condition prior to the unpermitted collocation or installation and to charge the responsible wireless provider the reasonable, documented cost of the city in doing so, plus a penalty not to exceed $1,000.00. The city may suspend the ability of the wireless provider to receive any new permits from the city under this division until the wireless provider has paid the amount assessed for such restoration costs and the penalty assessed, if any; provided, however, that the city may not suspend such ability of any applicant that has deposited the amount in controversy in escrow pending an adjudication of the merits of the dispute by a court of competent jurisdiction. (k) All accepted applications for permits shall be publicly available subject to the limitations identified in O.C.G.A. § 36-66C-6(c). (l) An applicant may file a consolidated application related to multiple small wireless facilities, poles or decorative poles so long as such consolidated application meets the requirements of O.C.G.A. § 36-66C-13. (m) Activities authorized under a permit shall be completed within the timelines provided in O.C.G.A. § 36-66C-7(k)(2). (n) Issuance of a permit authorizes the applicant to: (i) undertake the collocation, installation, modification or replacement approved by the permit and (ii) operate and maintain the small wireless facilities and any associated pole covered by the permit for a period not to exceed ten years. (o) Permits shall be renewed following the expiration of the term identified in (n) upon the terms and conditions identified in O.C.G.A. § 36-66C-7(k)(2)(B). (p) If an application for a permit seeks to collocate small wireless facilities on authority poles in the public rights of way, then the city shall, within 60-days of receipt of the completed application: (i) provide a good faith estimate for any make-ready work necessary to enable the authority pole to support the proposed facility; or (ii) notify the wireless provider that the wireless provider will be required to perform the make-ready work. Any make-ready work performed by the city shall be completed pursuant to and in accordance with the provisions of O.C.G.A. § 36-66C-7(n).

(Ord. No. 2019-47(19-O-1488), § 1, 9-12-19; Ord. No. 2020-32(20-O-1379), § 55, 6-23-20)

Ask a question about Atlanta law

Corpus searches the Atlanta sections it holds and shows the ones that match, with their citations. Free, no sign-in.