Sec. 13-309. - Fee for new connections; service line.
(a) (1)
The city shall charge connection fees for each metered customer added to the water and/or sewer system. Connection fees for all new construction shall be due and payable at the time the plumbing permit for connecting the structure to the outside water and/or sewer service is issued. No such permit shall be issued unless the connection fee is paid first. The following schedules shall be used for the various classifications of customers.
(2) Water and sewer connection fees for all new residential construction shall be based on the number of square feet of heated living area contained by the new construction. The area is to be computed as defined by the Veterans Administration. Mobile homes and other prefabricated structures that are moved onto a building site shall also be classified as new residential construction for this purpose. The fee per unit shall be as follows:
New residential construction water connection fee: Twenty cents ($0.20) per square foot.
New residential construction sewer connection fee: Eighty cents ($0.80) per square foot.
(b) If inspection reveals a misrepresentation or understatement of the actual area of the permitted structure by an amount greater than five (5) percent, an adjustment of the fee shall be made and the additional area shall be charged to the holder of the building permit at twice the normal rate.
(c) Water and sewer connection fees for existing residential construction and for new and existing commercial and industrial construction shall be based on the size of the primary water meter(s) serving the customer according to the following schedule:
Sewer Connection Fee
Meter Size | Water Connection Fee | New Construction | Existing Construction
¾″ | $ 400 | $ 800 | $ 600
1″ | 800 | 1,500 | 1,000
1½″ | 1,200 | 2,500 | 2,000
2″ | 1,800 | 4,000 | 2,500
3″ | 2,500 | 5,000 | 3,000
4″ | 3,500 | 8,000 | 5,000
6″ | 6,000 | 12,000 | 8,000
8″ | 10,000 | 20,000 | 15,000
(d) (1)
Secondary meters, yard, and irrigation meters: In addition to the primary meter supplying the customer, meters may be installed to record water flows such as for yard irrigation which do not enter the sewer system and consequently these flows do not result in a sewer charge. Secondary meters may also be installed to separate flows that formerly went through one meter such as when a master meter for an existing apartment complex is replaced by individual meters. Each additional meter is charged only the following fee.
(2) Water connection fee for yard/irrigation meters for new and existing construction and for other secondary meters that are added to existing customers to separate flows for billing purposes:
Meter Size | Meter Fee
¾″ | $200.00
1″ | 250.00
1½″ | 500.00
2″ | 800.00
3″ | 2,000.00
4″ | 3,500.00
6″ | 5,000.00
(e) (1)
Connection fees are not charged where existing services are being replaced unless such replacement results in an increase of meter size in which case a fee is charged equal to the difference between the connection fees for the original meter size and the fee for the new meter size.
(2) Connection fees are not charged where the applicable service is connected directly to a water or sewer main installed with Federal Community Development Grant funds.
(3) The above connection fee prices include the cost of the meter and the charge for tapping the main where applicable. The city shall make all water and sewer taps on mains that have been accepted by the city for operation and maintenance. The customer shall be responsible for all excavation, provision, and installation of tap materials, and backfilling. Taps on new main installations not yet accepted by the city shall be made by the installing contractor.
(f) In cases where a tap on a city main is made without the requirement for a meter, such as for main extensions or a fire service line, a connection fee is charged as follows:
Water Tap Size | Fee
¾″ | $150.00
1″ | 200.00
2″ | 250.00
3″ | 300.00
4″ | 350.00
6″ | 450.00
8″ | 650.00
10″ | 750.00
(g) (1)
Buildings requiring a fire service line six (6) inches in size or less, shall be required to pay a connection fee as set forth in subsection (f) above. A backflow prevention device meeting the requirements of title 8, section 8-407(2), (3) of the Clarksville Municipal Code shall be installed at the property boundary and become part of the fire system. The chief utility engineer, at his sole discretion, may require the fire line be metered when it is determined to be in the city's best interest to do so.
(2) Buildings requiring a fire service line greater than six (6) inches shall be required to meter such service as well as meet the requirements of subsection (g)(1) above and pay a connection fee based on cost plus ten (10) percent. The cost includes the cost of the meter, all appurtenances, and a tapping fee as established in subsection (f) above.
(3) All fire service lines shall be separate and independent of any other water service line to the property/building.
(h) Connections to city water mains by manipulating valves and adding fittings may be performed only when approved by the city engineer. Such approval shall not relieve the contractor of notifying any affected customer, nor of any other associated liability. Such connections shall be without charge unless a meter is required, in which case the appropriate water connection fee will be charged to the individual installing the meter set-up.
(i) Meter box fees will be charged for all new meter installation including secondary meters based on actual cost plus ten (10) percent.
(j) Connections to city sewer mains or manholes for the purpose of extending a main or replacing a service shall not be subject to a connection fee. Any new service extending from such a main or manhole shall be subject to the appropriate sewer connection fee. When a sewer tap is required on an existing main, it will be made by the city. The cost of such sewer tap is considered to be included in the applicable connection fee. If a tap is required to replace an existing service, an additional connection fee is not charged, but a tapping fee of fifty dollars ($50.00) shall be charged.
(k) Natural gas service and main extensions.
(1) Customers that have an existing service line up to their premises will only have to apply for proper permit and pay connection fee. Add-ons to present meters will be limited to permit and connection fee requirements.
(2) Customers' requests for relocation of mains, service lines, meters, or other services will be honored by the gas department. Property owners or contractors will be charged total costs for this type work.
(3) For each gas service connection, the customer shall apply for service at the Clarksville Gas and Water Department and pay twenty-five dollars ($25.00) for each service line application. This application fee will be refunded if the customer wishes to withdraw their application. The application fee may be transferrable to the connection fee, if the tenant is the person whose name appears on the application.
(4) For new service line requests, the customer or contractor shall be required to pay a gas service connection fee plus a tapping fee of one hundred fifty dollars ($150.00), which includes the first one hundred fifty (150) feet of the gas service line from the main to the meter as follows:
Service line size:
¾-inch and 1-inch—For base-load gas installations: The first one hundred fifty (150) feet or less from the gas main to the meter will be installed at no additional cost to the customer. Footage over one hundred fifty (150) feet shall be charged two dollars ($2.00) per foot of additional service line.
¾-inch and 1-inch—For less than base-load gas installations: The first one hundred fifty (150) feet or less from the gas main to the meter will be installed at no additional cost to the customer. Footage over one hundred fifty (150) feet shall be charged two dollars ($2.00) per foot of additional service lines. No refunds of tapping fee will be made to the customer.
Larger than 1-inch—The first one hundred fifty (150) feet or less from the gas main to the meter will be installed at no additional cost to the customer. Footage over one hundred fifty (150) feet shall be charged the actual cost to install the additional service line.
(5) Base-load gas installations: For the purpose of determining who qualifies for base-load gas incentives, the base-load gas installation is defined as follows:
Residential: Water heating, gas air conditioning, or a combination of other appliances as deemed acceptable (to adequately increase base-load requirements) by the manager gas division.
Commercial: Water heating, gas air conditioning, cooking, or a combination of other appliances as deemed acceptable (to adequately increase base-load requirements) by the manager gas division.
Industrial: Water heating, gas air conditioning, or in the processing of manufacturer's materials or goods (to adequately increase base-load requirements) as deemed acceptable by the manager gas division.
Incentives: New residential/commercial customers who install new base-load gas appliances will be offered incentives per gas appliance. Existing customers who change over from electric/propane to base-load gas appliances will be offered the same incentives per gas appliance. The manager of the gas division and the general manager of the gas and water department shall offer these incentives throughout the year and for scheduled time periods as deemed appropriate by the manager of the gas division and the general manager of the gas and water department and approved by the mayor and the public utilities committee.
(6) Main extensions for City of Clarksville: The first three hundred (300) feet will be installed at no cost to the customer. Any footage installed in excess of three hundred (300) feet will be required to make a contribution in aid of construction equal to three dollars ($3.00) per foot. No refunds will be made for future customer connections to the gas main.
(7) Main extensions for outside City of Clarksville: The first two hundred (200) feet will be installed at no cost to the customer. Any footage installed in excess of two hundred (200) feet will be required to make a contribution in aid of construction equal to five dollars ($5.00) per foot. No refunds will be made for future customer connections to the gas main.
(8) Main extensions for large commercial or industrial customers: Gas service lines or gas main extensions to large commercial or industrial customers that require service line or gas main extensions, additions, or improvements to the Clarksville Gas Department's distribution system will be furnished by the gas department if the main extension is deemed economically feasible by the manager gas division and/or general manager of Clarksville Gas and Water.
(9) Main extensions—General:
a. Customers who sign up for a main extension must be prepared to receive flowing gas through their meters within one hundred eighty (180) calendar days. If the customer does not meet this requirement due to environmental or geographic constraints, then he may request a thirty-day extension from Clarksville Gas and Water. If the customer does not have gas flowing through his meter within the required time frame, then the customer shall bear the entire cost of the main extension.
b. The Clarksville Gas Department reserves the right to determine the size of all gas main extensions. Gas main costs to the customer shall be based upon a two-inch polyethylene gas main. All gas mains installed larger than two (2) inches in diameter, or gas mains installed made with steel, are installed for the future benefit of the gas system or to improve pressure. When an extension requires a gas main in excess of two (2) inches in diameter or one made of steel, the Clarksville Gas Department will pay the difference between the cost of a two-inch polyethylene gas main and the actual cost of the new gas main to be installed.
c. All gas main extensions, additions, or improvements shall become the property of the Clarksville Gas Department, as they are installed, even though all or some part of the cost thereof is paid by parties other than the Clarksville Gas Department.
(10) New subdivisions City of Clarksville: The gas department will install distribution mains within new subdivisions if an agreement between developer, home builder, and the gas department can be finalized, guaranteeing that a sufficient number of housing units will be installed to meet the following requirements:
a. Housing units will meet the definition of base-load gas installation.
b. Housing units will be constructed within piped areas designated for natural gas use.
c. A minimum of one housing unit will use natural gas for each three hundred (300) feet of main installed to serve the subdivision.
d. Certain areas within the subdivision may be designated for natural gas use.
The manager gas division and/or the general manager of Clarksville Gas and Water can approve exceptions or variances to these requirements.
(11) The manager gas division and the general manager of [Clarksville] Gas and Water shall only authorize service to subdivisions outside the City of Clarksville where it is an economical advantage to the City of Clarksville to do so. Service to subdivisions that is not economically advantageous to the City of Clarksville, but may have other advantageous value, may be approved by the gas, water and wastewater committee of the city council. Service lines into subdivisions shall be installed under the guidelines set previously in this policy.
(12) The gas department, at its discretion, may install segments of distribution piping that would be an asset for future development. The gas department reserves the right to refuse service to any customer under this policy who is remotely located from existing facilities that service would not be economically feasible.
(13) Refund policy:
a. Customers who make contributions in aid of construction shall not be entitled to refunds from main extensions (for additional customer additions to main) under the new main extension policy.
b. Refunds for customers who made contributions in aid of construction prior to the new main extension policy and Ordinance No. 7-1997-98, but after Ordinance No. 4-1990-91, will be due refunds as follows:
(i) Customers who make contributions in aid of construction shall be entitled to refunds, if within three (3) years after construction additional customers services are connected to their specific gas main extension. In no case shall the customer making the payment be refunded more than he paid. The amount of the refund shall be two hundred dollars ($200.00) for each additional total gas customer and one hundred dollars ($100.00) for each less than total gas customer. If more than one customer makes contributions in aid of construction, the total refund shall be proportionately divided according to the original contributions.
(ii) There shall be no duplication of reimbursements, i.e., customers added to additional extensions of a gas main shall be a part of a separate contract and not included in calculating reimbursements for the initial extension.
(iii) The previous policy and its reimbursement features are effective only for mains that are extended subsequent to the effective date of Ordinance No. 4-1990-91 and prior to this new main extension policy and Ordinance No. 7-1997-98.
(14) A customer requesting the installation of an excess flow valve will be responsible for the payment of the actual cost associated with the installation of the excess flow valve and cost associated with the maintenance, if any, of the excess flow valve.
(l) Hazelwood Drainage Basin (HDB):
(1) A special sewer assessment district is hereby established to be known as the Hazelwood Drainage Basin (HDB) and more fully defined as the general area outlined on exhibit "A." In addition to the current connection fee authorized under this section, a wastewater capacity fee based on the number of residential equivalent units (REU) demanded to equal the peak day anticipated volume, or part thereof, is hereby assessed in the HDB. A residential equivalent unit shall be defined as two hundred (200) gallons per day peak demand. The fee shall be one thousand five hundred dollars ($1,500.00) per REU. The fee is due and payable prior to the issuance of a sewer connection permit. For commercial/industrial purposes the peak demand shall be based on fixture values as established in the latest publications of the American Water Works Association.
(2) The following schedule shall prevail to establish a guide as to the number of residential equivalent units associated with certain types of activities:
Single family dwelling (home) | One unit
Apartment (each) | One unit
Motel Room (each) | One-half (½) unit
Restaurant (order from menu) | Ten (10) units
Lounge | Five (5) units
Fast food restaurant | Eight (8) units
Laundromat | One-half (½) unit per washer
Convenience store w/cooking | Five (5) units
Office building | One unit per three thousand (3,000) s.f. or portion thereof of total space
Warehouse | One unit per ten thousand (10,000) s.f. or portion thereof of total warehouse space plus one unit per two thousand (2,000) s.f. or portion thereof of office space
Carwash (full service) | Ten (10) units per bay
Carwash (self service) | Two (2) units per bay
Service station | Five (5) units
Manufacturing facility | Negotiated (based on one unit per each two hundred (200) G.P.D. peak demand)
(3) This fee will apply to all branch or extension sewer mains connected to and flowing through the improvements. Together the improvements shall be referenced to as the Hazelwood Drainage Basin Improvements Project. The fee shall be collected until such time as Clarksville Gas and Water has recovered the total cost of said improvements. At such time as the total cost of said improvements has been fully and wholly recovered the aforementioned unit sewer capacity fee shall become zero dollars ($0.00).
(m) Oakland Road Drainage Basin:
(1) A wastewater drainage basin is hereby established to be known as the Oakland Road Drainage Basin and more fully defined as the general area outlined on exhibit "B." In addition to the current connection fee authorized under this section 13-309, a wastewater capacity fee based on the number of residential equivalent units (REU) demanded to equal the peak day anticipated volume, or part thereof, is hereby assessed in the HDB. A residential equivalent unit shall be defined as two hundred (200) gallons per day peak demand. The fee shall be two hundred seventy-five dollars ($275.00) per REU. The fee is due and payable prior to the issuance of a sewer connection permit. For commercial/industrial purposes the peak demand shall be based on fixture values as established in the latest publications of the American Water Works Association.
(2) The following schedule shall prevail to establish a guide as to the number of residential equivalent units associated with certain types of activities:
Single family dwelling (home) | One unit
Apartment (each) | One unit
Motel room (each) | One-half (½) unit
Restaurant (order from menu) | Ten (10) units
Lounge | Five (5) units
Fast food restaurant | Eight (8) units
Laundromat | One-half (½) unit per washer
Convenience store w/cooking | Five (5) units
Office building | One unit per three thousand (3,000) s.f. or portion thereof of total space
Warehouse | One unit per ten thousand (10,000) s.f. or portion thereof of total warehouse space plus one unit per two thousand (2,000) s.f. or portion thereof of office space
Carwash (full service) | Ten (10) units per bay
Carwash (self service) | Two (2) units per bay
Service station | Five (5) units
Manufacturing facility | Negotiated (based on one unit per each two hundred (200) G.P.D. peak demand)
(3) This fee will apply to all branch or extension sewer mains connected to and flowing through the improvements. Together the improvements shall be referenced to as the Oakland Road Drainage Basin Improvements Project. The fee shall be collected until such time as Clarksville Gas and Water has recovered the total cost of said improvements. At such time as the total cost of said improvements has been fully and wholly recovered the aforementioned unit sewer capacity fee shall become zero dollars ($0.00).
(1963 Code, § 28-56; Ord. No. 34-1985-86, 12-5-85; Ord. No. 16-1987-88, 10-1-87; Ord. No. 4-1990-91, 9-6-90; Ord. No. 28-1990-91, 1-15-91; Ord. No. 54-1990-91, 6-20-91; Ord. No. 47-1991-92, 3-5-92; Ord. No. 59-1991-92, 6-4-92; Ord. No. 18-1993-94, 10-7-93; Ord. No. 36-1996-97, 2-6-97; Ord. No. 7-1997-98, 8-7-97; Ord. No. 37-1997-98, 11-6-97; Ord. No. 63-1997-98, 5-7-98; Ord. No. 58-1999-00, 2-10-00; Ord. No. 7-2004-05, 10-7-04; Ord. No. 85-2004-05, 6-21-05; Ord. No. 44-2006-07, 12-7-06; Ord. No. 83-2006-07, 3-1-07; Ord. No. 13-2008-09, 9-9-08; Ord. No. 5-2010-11, 9-2-10; Ord. No. 82-2012-13, 7-2-13; Ord. No. 22-2015-16, 10-1-15; Ord. No. 49-2016-17, 4-6-17; Ord. No. 20-2020-21, § 1, 10-1-20)