33.854.340 Proposals Without a Land Division
The approval criteria of this section apply to Planned Developments that do not include a land
division, except Planned Developments that are only using the commercial/mixed use zones Planned
Development bonus. The approval criteria are:
A.
Services.
1.
The proposed use must be in conformance with the Arterial Streets Classifications and
Policies of the Transportation Element of the Comprehensive Plan;
2.
The approval criteria of Section 33.654.110.D, Connectivity and Location of Rights-of-
Way, must be met;
3.
The standards of Section 33.651.020, Water Service Standards, must be met;
4.
The standard of Section 33.652.020, Sanitary Sewer Disposal Service Standard, must
be met; and
5.
The standard of Section 33.653.020, Stormwater Management Standard, must be met.
B.
Tree preservation. The proposal must meet the requirements of Chapter 33.630, Tree
Preservation.
C.
Combined flood hazard area.
1.
RF through R2.5 zones. In the RF through R2.5 zones, all proposed building locations
must be outside of the combined flood hazard area.
2.
RM1 through RX, C, E, I, CI, and IR zones. In the RM1 through RX, C, E, I, CI, and IR
zones, all proposed building locations must be outside of the combined flood hazard
area where possible. Where it is not possible to have all building locations outside of
the combined flood hazard area, all proposed building locations must be configured to
reduce the impact of flooding and to provide the greatest protection for development
from flooding. Proposed building locations must be clustered on the highest ground
and near the highest point of access, and they must be configured in a manner that
will minimize obstruction of floodwaters.
D.
Landslide hazard areas. Buildings, services and utilities should be located on the safest part
of the site so that the risk of a landslide affecting the site, adjacent sites, and sites directly
across a street or alley from the site, is reasonably limited.
Determination of whether the proposed layout and design reasonably limits the risk of a
landslide will include evaluation of the Landslide Hazard Study and will take into
consideration accepted industry standards for factor of safety. Alternative development
options including alternative housing types and reduced density may be required in order
to limit the risk to a reasonable level.
E.
Clearing, grading, and land suitability.
1.
Existing contours and drainage patterns of the site must be left intact wherever
practicable. Where alteration to existing drainage patterns is proposed, it must not
adversely impact adjacent properties by significantly increasing volume of runoff
or erosion;
2.
Clearing and grading should be sufficient for construction of development shown on
the Clearing and Grading Plan;
3.
Clearing and grading should be limited to areas of the site that are reasonably
necessary for construction of development shown on the Clearing and Grading Plan;
4.
Topsoil must be preserved on site to the extent practicable for use on the site after
grading is complete;
5.
Soil stockpiles must be on the site and located in areas designated for clearing and
grading, if practicable;
6.
The limits of disturbance and tree protection measures shown on the Preliminary
Clearing and Grading Plan must be adequate to protect trees shown to be retained on
the tree preservation plan; and
7.
Where geologic conditions or historic uses of the site indicate that a hazard may exist,
the applicant must show that the site is suitable for the proposed development. The
applicant may be required to make specific improvements in order to make the site
suitable for the intended uses and the provision of services and utilities.
F.
Streams, springs, seeps, and wetlands.
1.
If there is a stream, spring, seep, or wetland outside of an Environmental Overlay Zone
on the site, then the stream, spring, seep, or wetland must be preserved in an
easement. The edges of the easement must be at least 15 feet from the edges of the
stream, spring, seep, or wetland. The edges of a seep, spring, or wetland are
determined through a wetland delineation, performed by an environmental scientist,
and approved by PP&D. For seeps and springs, if one or more wetland characteristics
are absent from the resource, the delineation will be based on the wetland
characteristics present. The edges of a stream are defined as the top-of-bank. Where
the edge of the stream, spring, seep, or wetland is less than 15 feet from the edge of
the site, the easement boundary will be located along the edge of the site.
2.
The following development, improvements, and activities are allowed in
the easement:
a.
Disturbance associated with discharging stormwater to the stream channel or
wetland, when BES has approved the stormwater system design;
b.
Removal of non-native invasive species with hand held equipment;
c.
Planting of native vegetation listed on the Portland Plant List when planted with
hand held equipment;
d.
Erosion control measures allowed by Title 10 of Portland City Code;
e.
Construction of required driveway connections or required connections to
services when there is no practicable alternative to locating the driveway or
service connections within the easement; and
f.
Maintenance and repair of existing utilities, services, and driveways;
3.
Public or private rights of way may cross the seep, spring, stream, or wetland
easement if the following approval criteria are met:
a.
There is no reasonable alternative location for the right-of-way;
b.
The applicant has demonstrated that it is possible to construct street
improvements within the right-of-way that will meet all of the following:
(1) The street improvements will not impede the flow of the stream, spring,
or seep;
(2) The street improvements will impact the slope, width, and depth of the
stream channel, spring, seep, or wetland to the minimum extent
practicable; and
(3) The street improvements will not impede fish passage in a stream, spring, or
seep that has been identified by the Oregon Department of Fish and Wildlife
as fish-bearing.
4.
Minimum density is waived in order to better meet the standards of paragraphs F.1-
F.3, above.
G.
Transportation impacts.
1.
The transportation system must be capable of supporting the proposed development
in addition to the existing uses in the area. Evaluation factors include: safety, street
capacity level of service, connectivity, transit availability, availability of pedestrian and
bicycle networks, access restrictions, neighborhood impacts, impacts on pedestrian,
bicycle, and transit circulation. Evaluation factors should be balanced; a finding of
failure in one or more factors may be acceptable if the failure is not a result of the
proposed development, and any additional impacts on the system from the proposed
development are mitigated as required by criterion G.2;
2.
Measures proportional to the impacts of the proposed use are proposed to mitigate
on- and off-site transportation impacts. Measures may include: transportation
improvements to on-site circulation, public street dedication and improvement or
private street improvements, intersection improvements, transportation and parking
demand management actions, street crossing improvements, improvements to the
local pedestrian and bicycle networks, and transit stop improvements;
3.
Transportation improvements adjacent to the development and in the vicinity needed
to support the development are available or will be made available when the
development is complete or, if the development is phased, will be available as each
phase of the development is completed;
Changes to an Approved Planned Development