For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 4-20-44 — Floodplain Development Permits and Flood Control Variance Fees

Boulder Revised Code 1981 (Supplement167; ordinances effective through July30,2026; five publisher-pending ordinances held); partial · Boulder Revised Code 1981 § 4-20-44

Corpus is an independent public-information project, not the official City of Boulder website. Stable reference: corpuslaw.us/code/1faccb47-9ecd-4548-bdbb-fa2660dfc571

4-20-44. - Floodplain Development Permits and Flood Control Variance Fees.

(a) If the floodplain development permit is for a development not located within the conveyance zone: (1) An applicant for a floodplain development permit for the construction of a fence, or for flatwork, shall pay $35. (2) An applicant for a floodplain development permit for construction of a shed, garage, deck, or for interior or exterior "rehabilitation" as defined in Section 9-16-1, "General Definitions," B.R.C. 1981, of an existing structure shall pay $85. (3) An applicant for a floodplain development permit for improvements or additions to an existing structure not meeting the thresholds for "substantial damage," "substantial improvement" or "substantial modification" as defined in Section 9-16-1, "General Definitions," B.R.C. 1981, shall pay $350. (4) An applicant for a floodplain development permit for work on an existing residential structure exceeding the threshold for "substantial damage," "substantial improvement" or "substantial modification" as defined in Section 9-16-1, "General Definitions," B.R.C. 1981, or any new residential, commercial, or mixed-use structure elevated to flood protection elevation shall pay $700. (5) An applicant for a floodplain development permit for an addition to an existing structure, "substantial improvement," "substantial modification" or construction of a new structure with "floodproofing" as that term is defined in Section 9-16-1, "General Definitions," B.R.C. 1981, shall pay $3,675. (b) If the floodplain development permit is for a development located within the conveyance zone or the floodway: (1) An applicant for a floodplain development permit where a floodplain analysis is not required shall pay $700. (2) An applicant for a floodplain development permit where the city manager, pursuant to Paragraph 9-3-6(b)(3), B.R.C. 1981, requires the applicant to furnish a floodplain analysis, the applicant shall pay $3,600 plus additional consultant or third-party reviewer costs for the associated analysis and review. (c) An applicant for a floodplain development permit for an emergency operations plan shall pay: (1) $700 for an evacuation plan. (2) $1,400 for a shelter-in-place plan. (d) An applicant for a floodplain development permit for a hazardous materials facility shall pay $700 for containment of hazardous materials or shall apply for elevation or floodproofing permits as described above. (e) An applicant for a floodplain map revision shall pay: (1) $700 for a map revision that involves fill. (2) $3,600 for a map revision that includes a floodplain analysis, plus additional consultant costs or third-party reviewer for the associated analysis and review. (f) An applicant for a variance from the floodplain regulation provisions of Section 9-3-7, "Variances," B.R.C. 1981, shall pay $1,400. (g) An applicant shall pay a revision fee of twenty-five percent of the application fee for review of revisions to items (a) through (f) of this section. (h) An applicant for a floodplain information request shall pay $28 for each address. Ordinance Nos. 4748 (1983); 4946 (1985); 5012 (1986); 5199 (1989); 5425 (1991); 5525 (1992); 5676 (1994); 5760 (1995); 5835 (1996); 6034 (1998); 7349 (2004); 7439 (2005); 7476 (2006); 7564 (2007); 7629 (2008); 7820 (2011); 8651 (2025); 8727 (2026)

Ask a question about Boulder law

Corpus searches the Boulder sections it holds and shows the ones that match, with their citations. Free, no sign-in.