§ 12.16.635 — Wastewater discharge permit contents
Reno Administrative Code, City of Reno, Nevada (Supp. No. 65, Update 1: codified through Ordinance No. 6740, adopted May 6, 2026) · Reno Administrative Code § 12.16.635
Corpus is an independent public-information project, not the official City of Reno website. Stable reference: corpuslaw.us/code/1ff03390-5756-46a5-a4c4-1098a5cfa038
Sec. 12.16.635. - Wastewater discharge permit contents.
Wastewater discharge permits issued to Class III, IV, and V industrial users shall be expressly subject to all provisions of this article and all other applicable regulations, user charges and fees established by the city. Permits may contain the following: (a) A statement that indicates the permit's issuance date, expiration date and effective date; (b) A statement on permit transferability; (c) The unit charge or schedule of user charges and fees for the wastewater to be discharged into a public sewer; (d) Limits on the average and/or maximum wastewater constituents and characteristics including, but not limited to, effluent limits, including best management practices, based upon applicable pretreatment standards; (e) Limits on average and maximum rate and time of discharge or requirements for flow; (f) Requirements for installation and maintenance of inspection and sampling facilities and equipment; (g) Self-monitoring, sampling, reporting, notification and record-keeping requirements including, but not limited to, identification of the pollutants to be monitored, sampling location, sampling frequency and sample type, based on federal, state and local law; (h) Best management practices (BMPs) to control specific pollutants as necessary to meet the objectives of this article; (i) Compliance schedules; (j) Requirements for notification of the city of any new introduction of wastewater constituents or any significant change in the volume or character of the wastewater constituents being introduced into the wastewater treatment system; (k) Requirements to control and report any slug discharges and notify the city immediately of any changes at its facility affecting potential for a spill or slug discharge and to notify the POTW immediately in the event of a slug, spill or accidental discharge to the POTW; (l) Statements of applicable administrative, civil and/or criminal penalties for the violation of pretreatment standards and requirements, the permit, this article, and any applicable compliance schedule; (m) Requirements to reapply for a new permit prior to expiration of the existing permit; (n) Additional monitoring to be reported; (o) Requirements for the installation of pretreatment technology, pollution control, or construction of appropriate containment devices, designed to reduce, eliminate, or prevent the introduction of pollutants into the treatment works; (p) Closure requirements for permitted facilities undergoing partial or complete closure activities to ensure closure activities are completed and wastes have been properly disposed and remaining access to sanitary and storm sewers are protected; (q) Other conditions as deemed appropriate by the city or the director to ensure compliance with all applicable rules and regulations.
(Ord. No. 6305, § 1, 8-28-13)
Ask a question about Reno law
Corpus searches the Reno sections it holds and shows the ones that match, with their citations. Free, no sign-in.
