For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 8-3C-6 — PUBLIC IMPROVEMENT ACCEPTANCE

City Code of West Jordan, Utah (2026 S-39: code current through Ord. 26-41, passed 7-28-2026) · West Jordan City Code § 8-3C-6

Corpus is an independent public-information project, not the official City of West Jordan website. Stable reference: corpuslaw.us/code/2032a3cb-59e0-4b0a-a956-61bc9baf6115

8-3C-6: PUBLIC IMPROVEMENT ACCEPTANCE:

A. Public Improvement Acceptance: City CITY: The municipal corporation and political subdivision of the state of Utah known as the City of West Jordan. acceptance of public improvements shall occur only after the city engineer verifies all of the following: 1) all systems are constructed; 2) all corrections list items are complete; 3) all city inspections and reinspections are complete, except the final inspection to occur at the end of the warranty period; 4) all public improvements are in compliance with city ordinances, standards, specifications and the approved engineering drawings; 5) a maintenance plan has been submitted to the city for public landscaping improvements; 6) as built drawings have been submitted to the city; 7) the developer has provided financial assurance for the warranty; and 8) the subdivision plat is recorded. Acceptance shall not be deemed to have occurred unless and until the plat has been recorded and the city administrator has issued a validly executed letter of acceptance. B. Timing of City CITY: The municipal corporation and political subdivision of the state of Utah known as the City of West Jordan. Inspection and Acceptance: After completing all systems, the developer shall submit a written request for the city to perform an inspection of the public improvements. Failure to request city inspections and reinspections in writing WRITING: Communication in printed, handwritten, digital, or other permanent format. shall delay the city's inspection and potential acceptance. The date of city acceptance shall be the later of: 1) the date on which the plat is recorded; or 2) the date on which the city administrator signs the letter of acceptance. C. Temporary System Connections: Prior to city CITY: The municipal corporation and political subdivision of the state of Utah known as the City of West Jordan. acceptance of public improvements, the city engineer may authorize temporary connection to the city's existing infrastructure for the purpose of testing and inspecting the public improvements. The connection shall not become permanent unless and until the date of city acceptance as defined in this article. At any time prior to city acceptance, including, without limitation, any time prior to plat recordation, the city engineer's authorization for temporary connection may be revoked if the city engineer determines that public improvements may not be timely completed or dedicated to the city. (Ord. 14-07, 3-12-2014; amd. Ord. 19-48, 12-11-2019, Effective at 12 noon on January 6, 2020)

Ask a question about West Jordan law

Corpus searches the West Jordan sections it holds and shows the ones that match, with their citations. Free, no sign-in.