§ 3.4 — Final plat
Code of Ordinances of the City of Huntsville, Alabama (Supp. No. 30 (codified through Ord. No. 26-196, adopted March 12, 2026) with enacted ordinances through Ord. No. 26-837 (September 24, 2026) applied from official council minutes and ordinance copies) · Huntsville Code of Ordinances, App. B, art. 3, § 3.4
Corpus is an independent public-information project, not the official City of Huntsville website. Stable reference: corpuslaw.us/code/20458bd9-28c6-4eff-bb45-2edfe15a22a5
3.4. - Final plat.
(1) Application procedure. Following the approval of the preliminary plat, the owner of land or his representative shall file an application for approval of a final plat. The application shall: A. Be made on forms available at the office of the manager of planning. B. Be accompanied by a minimum of three copies of the final plat as described in these regulations and complying in all respects with these regulations. C. Be accompanied by the actual closure computations for the boundary traverse. Such boundary traverse shall close to a minimum accuracy of one part in 5,000. D. Be presented to the manager of planning sufficiently in advance of the meeting of the planning commission to allow time for his review. E. Be accompanied by a performance bond, if required, in a form satisfactory to the city attorney and in an amount established by the city engineer based upon cost estimates of the engineer of record. F. Be accompanied by a digital submittal as described in [subsection] article 3.3(3)S., in compliance with all final plat requirements to the Geographic Information and Mapping Services (G.I.M.S.) department, with electronic notification to the planning division, engineering division and Huntsville Utilities. (2) Final plat requirements. The final subdivision plat shall be presented in india ink on tracing cloth or reproducible mylar. The final plat shall contain the same information shown on the preliminary plat, as well as the following: A. The names and deed book and page of all adjoining property owners of record, or the names of adjoining developments; the names of adjoining streets. B. Notation of any proposed streets and rights-of-way adjacent to the subdivision. C. Notation of any restrictions by plats. (i) Restricted use areas shall be shown giving dimensions and locations, and shall be labeled "Restricted Use Area". (ii) A geotechnical investigation and testing report has been prepared for (name of development) as shown hereon and is recorded with the Office of the Probate Judge in Deed Book _______ page _____. Due to the documented evidence of natural or man-made hazards and/or sensitive environmental features existing on or near lots _____, all required construction plans submitted for a building permit on any of the said lots shall be certified to by a geotechnical engineer as being adequate to meet the minimum required standards and practices for stability and bearing capacity as established by the regulations of the City of Huntsville, Alabama. Prior to issuance of a certificate of occupancy on lots _____, all site construction and building construction shall be certified to by a geotechnical engineer as having been completed in compliance with the required standards and practices for stability and bearing capacity as established by the regulations of the City of Huntsville, Alabama, and as set forth in the aforementioned certified construction plans. (iii) All hazard zone lands as defined by the Zoning Ordinance of the City of Huntsville, Alabama, shall be shown giving locations and dimension, and shall be labeled hazard zone. D. Subdivisions shall have the lot size for each lot on the final plat. E. All existing monuments and all monuments to be installed are to include the material of which the monuments, corners or other points are made and shall be noted at the representation thereof or by legend. F. Endorsements and certificates as follows: (i) A certificate of accuracy by a surveyor licensed to practice in the State of Alabama and licensed with the City of Huntsville, Alabama. STATE OF ALABAMA ___________ COUNTY I, (owner's land surveyor), do hereby certify that I am a licensed land surveyor and licensed in Huntsville, Alabama, and that I have surveyed the lands embraced in the within plat or map designated as (subdivision name) all lying within _______ County, Alabama. It is further certified that said plat or map is a true plat or map of lands embraced therein, giving the length and bearings of the boundaries of each block and lot and block number; showing the streets, alleys and public grounds; giving the bearings, length, width and name of each street; showing the relation of the lands to the government survey; (or, in the case of a resubdivision, "showing the relation of the land to the survey of _______ as recorded in the Probate Office of _______ County in Plat Book _____, Page _____"); and that monuments shown hereon shall be installed at all lot corners and curve points prior to final inspection by the city engineer of the City of Huntsville, Alabama. (ii) A certificate of title showing ownership of land.* I, (land owner) the owner of the lands embraced in said plat, hereby join in this certificate as required by law for the purpose of giving full force and effect to the platting of said lands embraced in said plat as contemplated and required by law. In witness whereof, said (owner's land surveyor), surveyor, and (land owner), owner, have caused these presents to be duly executed and hereunto set our hand and affix our seals this the _____ day of _______, 20_____. *A written "Title Opinion" certified to by a licensed attorney that all names shown on the plat include all owners as of the date of signing and that the owners of the property are one and the same as those signing the plat. (iii) A notary's acknowledgment of the certificates referred to in (i) and (ii) above. STATE OF ALABAMA _______ COUNTY I, (name of notary public), a notary public in and for said county of said state, hereby certify that (owner's land surveyor) whose name is signed to the foregoing certificate and who is known to me, acknowledged before me on this day, that being informed of the contents of said certificate he has executed the same voluntarily on the day the same bears date. (For Non-Corporate Ownership) And I further certify that (land owner/owners, whose name/names are signed to the foregoing certificate who are known to me, acknowledged before me on this day that being informed of the contents of the foregoing certificate, they, as such land owners executed the same voluntarily. In witness whereof, I hereunto set my hand and seal, this the _____ day of _______, 20_____. (For Corporate Ownership) And I further certify that (land owner), (title), (corporation) and (land owner), (title), (corporation) whose name(s) are signed to the foregoing certificate who are known to me, acknowledged before me on this day that being informed of the contents of the foregoing certificate, they, as such officers and with full authority executed the same voluntarily for and as the act of said corporation. In witness whereof, I hereunto set my hand and seal, this the _____ day of _______, 20_____. | _____ Notary Public (iv) A certificate by the geotechnical engineer of record, for subdivisions requiring geotechnical investigation and testing: Due to the documented evidence of potential geologic hazards existing on or near the lots shown hereon, I, ___________, the geotechnical engineer of record having caused investigations and tests to be performed and based on the findings of said investigations and tests do hereby certify that all lots shown hereon exhibit no apparent geologic or geotechnical constraints which would render said lots unfit for development. _____ Date | _____ Geotechnical Engineer of Record (v) For developments where construction is proposed on lands or portions of lands which are designated as hazard zone as defined by the Zoning Ordinance of the City of Huntsville, Alabama, the following certifications: ENGINEER OF RECORD I, ___________, the engineer of record, certify that the proposed development shown hereon is designed in accordance with sound engineering standards and practices, and in accordance with all applicable development regulations. I further certify that I have caused prudent investigation testing and inspections to be performed on all lands within the proposed development identified as hazard zone, as defined by the Zoning Ordinance of the City of Huntsville, Alabama, including geotechnical analysis and testing on all hazard zone lands and on lands upslope and downslope of the proposed development, and I have instructed the land surveyor as to those areas within the proposed development that fall within the hazard zone for inclusion in the development plats. Based upon the investigation, testing and inspections performed, as defined and discussed in the geotechnical analysis and report dated _______ and submitted in connection herewith, and further based upon any remedial measures taken in connection with the hazards defined therein, I certify that, within acceptable geotechnical standards, development of the property as shown on the plat will not diminish the stability of the slope or otherwise increase the likelihood of landslide or other slope failure and that the buildable areas designated hereon can meet a minimum safety factor of 1.5 for stability. _____ Date | _____ Engineer of Record OWNER I, ___________, owner/owners of the lands embraced hereon, hereby certify that I have caused investigation in accordance with sound engineering standards and practice to be made of Hazard Zone lands, as defined by the Zoning Ordinance of the City of Huntsville, Alabama, within the development as shown hereon. I further understand the potential and inherent danger of said lands and that landslides have originated in conditions that regularly exist on said Hazard Zone lands. With this knowledge, I hereby certify that I have caused all prudent measures to be taken in the design of the development as shown hereon, including an analysis of all lands upslope and downslope of the Hazard Zone lands, to assure that the site is safe for the proposed development, and within acceptable geotechnical standards the proposed development will not diminish the stability of the slope or otherwise increase the likelihood of landslide or other slope failure. _____ Date | _____ Owner (vi) A certificate for approval of City Engineer, City of Huntsville. The undersigned, as City Engineer of the City of Huntsville, Alabama, hereby approved the within plat for the recording of same in the Probate Office of _______ County, Alabama, this the _____ day of _______, 20_____. | _____ City Engineer City of Huntsville, Alabama (vii) A certificate for approval of Huntsville Utilities. The undersigned, a duly authorized representative of Huntsville Utilities of the City of Huntsville, Alabama, hereby approves the within plat for the recording of same in the Probate Office of _______ County, Alabama, this the _____ day of _______, 20_____. | _____ Name and Title (viii) A certificate for approval by the county health department for subdivisions not served by a sanitary sewer system. From the septic tank information submitted to the _______ County Health Department for lots _____ of _______ Subdivision, the following recommendations are made: a) Lots _____ meet _______ County Health Department requirements and should operate satisfactorily; b) Lots _____ require further engineering and/or alternative septic system installation; c) Lots _____ were not tested. Each lot or tract shall be investigated further and approved or disapproved on its own merits. The undersigned, a duly authorized representative of the _______ County Health Department, hereby approves the within plat for the recording of same in the Probate Office of _______ County, Alabama, this the _____ day of _______, 20___. | _____ Name and Title (ix) A certificate for approval by the planning commission. The within plat of (name of subdivision), _______ County, Alabama, is hereby approved by the Planning Commission for the City of Huntsville, Alabama, for recording of same in the Probate Office of _______ County, Alabama, this the _____ day of _______, 20_____. The recording must be accomplished by the day of _______, 20_____. If the plat is not recorded by this date, the approval of the plat by the planning commission shall be deemed to have expired. Planning Commission for the City of Huntsville, Alabama By _____ Title _____ (x) A certificate for recording by the probate judge. STATE OF ALABAMA COUNTY PROBATE JUDGE I, ___________, Judge of Probate of the county and state aforesaid, certify that the within and foregoing instrument of writing was filed for record in this office on the _______ day of _______, 20 _____ at _____ o'clock and duly recorded in Plat Book _______, Page _______. | ________ Judge of Probate (xi) A flood hazard certification as shown on the preliminary plat. (xii) A certificate indicating that either all required improvements have been installed or that sufficient bond exists to cover the cost of improvements. OPTION 1 - IMPROVEMENTS INSTALLED I hereby certify that I have inspected the water system improvements for the subdivision shown hereon and that the installation is in accordance with the approved construction plans and plat for this subdivision and meets the construction specifications of the Water Department. | _____ Manager or Authorized Representative City of Huntsville Water Department, County Water System, or Local County Water System I hereby certify that I have inspected the following improvements for the subdivision shown hereon: streets, sidewalks, storm drainage, sanitary sewer, traffic control devices, street markers, monuments. I find that these improvements have been installed in accordance with the approved construction plans and plat for this subdivision and meet the construction specifications of the City of Huntsville, Alabama. | _____ Engineer of Record I hereby concur with and approve of the engineer's certification above. | _____ City Engineer City of Huntsville, Alabama OPTION 2 - POST BOND FOR IMPROVEMENTS I recommend bond for assurance of installation of streets, storm drainage, sanitary sewers, sidewalks, traffic control devices and monuments as required in the approved construction plans and plat for the subdivision shown hereon shall be in the amount of $ _____. | _____ City Engineer City of Huntsville, Alabama I recommend bond for assurance of installation of water improvements as required in the approved construction plans and plat for the subdivision shown hereon shall be in the amount of $ _____. | _____ Manager or Authorized Representative City of Huntsville Water Department, County Water System, or Local County Water System I hereby approve bond for assurance of improvements described above as required by the Huntsville Subdivision Regulations for the subdivision shown hereon in the amount of $ _____. | _____ City Attorney I hereby received and placed on file with the City of Huntsville bond as initialed by the City Attorney in the amount of $ _____ for the subdivision shown hereon. | _____ City Clerk-Treasurer (xiii) For planned developments and private subdivisions, additional certificates as necessary to insure adequate access for public protection and utilities as well as conformance to applicable plans and ordinance requirements. (3) Planning commission review and approval. After review of final subdivision plat, the planning commission shall approve the plat for recording or shall disapprove the plat and state the reasons for disapproval. At the time of final plat approval, the planning commission may stipulate the time period when the required improvements shall be installed, but in no event shall the period of time for completion of required improvements exceed two years from the date of final approval. (4) Copy of final plat to all certifying agencies. Following the planning commission approval of the final plat, one reproducible copy of the final plat as approved shall be presented by the owner or his representative to the Vice President of Operations of Huntsville Utilities. Any other agencies certifying the final plat shall be presented a print of the final plat as approved. (5) Recording of plat. If the final plat as approved by the planning commission is not recorded within six months of the date of final approval, the approval of the plat shall be deemed to have expired.
Ask a question about Huntsville law
Corpus searches the Huntsville sections it holds and shows the ones that match, with their citations. Free, no sign-in.
