Colorado Springs City Code § 7.2.401 BP: BUSINESS PARK
7.2.401: BP: BUSINESS PARK:
A. Purpose: The BP zone district accommodates a limited group of, for example, professional, administrative, research, manufacturing, and light industrial uses. Land uses are as indicated in Table 7.3.2-A: Base and NNA-O District Use Table. Uses suitable for BP zone districts have operations that are quiet and clean to ensure the creation and maintenance of an environment that will protect the occupants of the business park from unintended adverse traffic, noise, or performance impacts. BP zone districts shall be located on lands that are suitable for industrial development, have adequate traffic capacity for the anticipated mix of uses as shown on the Major Thoroughfare Plan and applicable Land Use Plans. Before proceeding with any development, an applicant rezoning land to the BP zone district must obtain approval of a Land Use Plan pursuant to Section 7.5.514 (Land Use Plan).
[image omitted; see the official code]
B. Dimensional Standards: The following table is a summary of key district-specific dimensional standards. Complete dimensional standards, including standards for accessory structures, are included in Part 7.4.2 (Dimensional Standards) and Section 7.3.304 (Accessory Uses).
Table 7.2.4-A BP: Lot and Building Standards
Table 7.2.4-A BP: Lot and Building Standards
District Standards
| District area (minimum) | 10 ac.
Lot Standards
| Lot area (minimum) | N/A
| Lot width (minimum) | N/A
Setbacks (minimum) [1]
A | Front (minimum) | 20 ft
B | Side (minimum) | 10 ft
| Corner Lot - Side Street | 20 ft
C | Rear (minimum) | 25 ft
| Adjacent to existing or plannedresidential zone or use | 100 ft
Height (maximum)
D | Building height | 45 ft
Other Standards
| Front parking setback (minimum) | 20 ft
Notes:[1] Pursuant to Section 7.4.905 (Street Frontage and Street Trees), if the landscape setback is greater than the setback listed in this table, the landscape setback prevails.
C. Additional Standards:
1. When land is zoned into the BP zone district after the Effective Date, approval of a Land Use Plan pursuant to Section 7.5.514 (Land Use Plan) is required prior to any development on the land. Lands zoned into the former PIP-1 or PIP-2 zone districts prior to the Effective Date shall remain subject to any plans, conditions, or restrictions applicable under the pre-existing zoning or related zoning and land use approvals, but do not need to obtain approval of a Land Use Plan unless the Manager determines that the proposed development is of a size or intensity that was not anticipated, or creates potential impacts on the surrounding areas that were not considered, at the time of prior zoning or Land Use Plan approval. (Ord. 23-03)