For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 74-512 — Off-site facilities

Atlanta City Code (Code of Ordinances, Part II) (Supp. No. 108, Update 1: codified through Ordinance No. 2026-37 (26-O-1511), enacted September 30, 2026) · Atlanta City Code § 74-512

Corpus is an independent public-information project, not the official City of Atlanta website. Stable reference: corpuslaw.us/code/20e8b430-9808-466b-9527-ec4fa123e1d8

Sec. 74-512. - Off-site facilities.

(a) The stormwater management plan for each development shall provide for stormwater management measures located on the site, unless provisions are made to manage stormwater by an off-site facility or regional stormwater management facility in which case the following applies: (1) An approved operation and maintenance agreement must be recorded by the applicant or owner in the deed records of the Superior Court of Fulton or DeKalb County, whichever is applicable, on the following land: a. the land where the off-site facility or regional stormwater management facility is physically located; b. the site; and c. any future sites that may utilize the off-site facility or regional stormwater management facility. (2) The off-site facility or regional stormwater management facility must be designed and adequately sized to provide a level of stormwater quantity and quality control that is equal to or greater than that which would be afforded by on-site stormwater management measures. (3) On-site measures shall be implemented, where necessary, to protect upstream and downstream properties and drainage channels from the site to the off-site facility. (b) A stormwater management plan that shows the adequacy of the off-site facility or regional stormwater management facility must be submitted to the department. (c) To be eligible for a modification, the applicant or owner must demonstrate to the satisfaction of the department that the use of an off-site facility or regional stormwater management facility will not result in the following impacts to upstream or downstream areas: (1) Increased threat of flood damage to public health, life, and property; (2) Deterioration of existing culverts, bridges, dams, and other structures; (3) Accelerated streambank or streambed erosion or siltation; (4) Degradation of in-stream biological functions or habitat; or (5) Water quality impairment in violation of state water quality standards, or violation of any state or federal regulations.

(Ord. No. 2020-66(20-O-1498), § 1, 11-25-20)

Ask a question about Atlanta law

Corpus searches the Atlanta sections it holds and shows the ones that match, with their citations. Free, no sign-in.