21-0706. - Construction requirements.

All WECS installations shall meet the following requirements: A. WECS towers shall be designed to withstand winds of 100 mph or greater, or requirements of the International Building Code, whichever is greater. B. Height of WECS installations shall not exceed limits as established by Federal Aviation Administration regulations. C. All WECS shall be equipped with overspeed devices. D. All electrical transmission lines from the WECS shall be underground. E. The WECS installation shall be located so that any overhead electric distribution lines carrying voltage in excess of 240 volts to ground will be located outside of the TCA. F. Except as hereinafter provided, the WECS installation shall be located so that the TCA will fall entirely within the property on which the installation is to be constructed and so that no part of any building on the premises will be located within the TCA.

Source: 2166 (1984), 4594 (2007).