§ 25-6-261 — PERMIT REQUIRED FOR A PROJECT
Austin City Code (Supp. No. 174: codified through Ordinance No. 20260521-050, effective June 1, 2026) · Austin City Code § 25-6-261
Corpus is an independent public-information project, not the official City of Austin website. Stable reference: corpuslaw.us/code/217e0d3d-d96a-449c-bb42-ae4c6b962466
§ 25-6-261 - PERMIT REQUIRED FOR A PROJECT.
(A) Except as provided by Subsection (C), a person must obtain a right-of-way construction permit to: (1) construct, alter, repair, or remove a sidewalk, curb, gutter, driveway approach, or pedestrian way; or (2) remove a tree from public right-of-way. (B) A separate permit is required for each lot or tract of land on which activity described in Subsection (A) occurs. (C) A permit is not required if the proposed construction: (1) is performed in accordance with an approved site plan; (2) is performed as part of the construction of a new subdivision if the construction: (a) is included on the subdivision's approved street and drainage construction plans, and (b) the proposed construction occurs at the time that construction of the street and drainage systems occurs; or (3) is a minor repair or construction, as determined by the city manager; or (4) will be performed by a public utility or franchise holder. (D) The exemption provided by Subsection (C)(2) does not apply after the City accepts the street and drainage construction of a subdivision. (E) A person may not transfer or assign a permit issued under this division.
Source: Section 13-5-64, 13-5-65(c), 13-5-71, and 13-5-82(b); Ord. 990225-70; Ord. 010329-18; Ord. 031211-11; Ord. 20060504-039.
Ask a question about Austin law
Corpus searches the Austin sections it holds and shows the ones that match, with their citations. Free, no sign-in.
