For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 27-155.3.5 — Streetlights

Code of Ordinances, City of Tampa (Supp. No. 148: codified through Ordinance No. 2025-152, enacted December 18, 2025) · Tampa City Code § 27-155.3.5

Corpus is an independent public-information project, not the official City of Tampa website. Stable reference: corpuslaw.us/code/21ee00bb-2a1f-42cc-8ea3-9d2cc4e7680c

Sec. 27-155.3.5. - Streetlights.

(a) The developer shall be required, as a condition of his subdivision plat approval, to provide street lighting meeting the standards established by the department of public works and establish the funding mechanism. (b) The developer shall install underground wiring unless the area is determined by the department of public works to be an existing overhead wiring area. Poles must meet the specifications of the department of public works and Tampa Electric Company for lighting along public rights-of-way. Specifications for poles along private rights-of-way must also be approved by the department of public works. (c) The developer or an existing neighborhood or commercial area may make an up-front lump sum payment, bond the cost or request that the city or CDD levy a special assessment for the cost of streetlights. (1) Lump sum and bonded payment. The lump sum payment or bond shall be due to the city during the final plat process. The lump sum payment or bond shall cover the base facility charge for twenty (20) years (the average life of the lighting system). a. Streetlight formula. The streetlight formula employed by the city to determine the lump sum payment or the amount of the bond is as follows (Base facility charge + pro rata share of franchise fee) × number of locations × 12 months × 20 years b. Streetlights on public rights-of-way. The following shall apply to streetlights installed on public rights-of-way: 1. Payment. The developer may either i. pay the lump sum amount pursuant to the streetlight formula, or ii. post a performance bond to insure that the lump sum will be paid in the future. 2. The developer's streetlight cost shall include the equipment, material and installation costs (base facility charge). 3. The city shall pay the fuel, energy and maintenance costs. The city shall contract with TECO to install the streetlights and pay the entire TECO monthly bill. c. Streetlights on private rights-of-way. The following shall apply to streetlights installed on private rights-of-way: 1. Payment. The developer may either i. post a performance bond using the streetlight formula as, or ii. provide the city with a copy of an executed agreement with the company which will install the streetlights. The agreement must be approved by the city attorney's office and the department of public works. d. If a developer chooses to bond the streetlight cost, the bond shall not be extended if one-third (⅓) or more of the total number of units in the subdivision have received a certificate of occupancy. (2) Special assessment. A developer or an existing neighborhood or commercial area of any subdivision may apply at the final plat submission to the city for a special assessment to be levied against the lots in the subdivision for the full amount of the streetlight costs on public rights-of-way in the subdivision including all administrative expenses associated with the special assessment on a yearly basis. a. Public hearing to establish. After public notice city council shall hold a public hearing to establish a special assessment program for the area in the application. b. Levy. The special assessment shall be levied by the city pursuant to F.S. § 197.3632, the Uniform Method for the Levy, Collection, and Enforcement of Non-ad Valorem Assessments. c. Interim costs. At the final plat submission between the date of final plat approval and the inclusion of the subdivision or area in the special assessment program, the developer shall contract directly with TECO for the installation of the streetlights and payment of the streetlight costs until the date the special assessment is effective. d. Assessments. The special assessments shall be divided into master improvement streetlights and local streetlights and shall be levied according to the benefit provided by the streetlights to each lot. The benefit to each lot shall be determined by the size of each lot. Lots of the same approximate size in a subdivision shall be subject to the same rate(s). City council shall determine if the lots in a subdivision are of the same approximate size; provided, however lots which are of the same approximate size shall not vary more than one thousand five hundred (1,500) square feet in size. The special assessment shall be based on the type of pole and fixture and all associated costs, including administrative costs.

(Ord. No. 89-261, § 2(35-146), 10-12-89; Ord. No. 91-89, § 22, 5-30-91; Ord. No. 96-241, § 42, 10-31-96; Ord. No. 99-177, § 1, 8-5-99; Ord. No. 2013-67, § 1(Exh. A), 5-16-2013)

Ask a question about Tampa law

Corpus searches the Tampa sections it holds and shows the ones that match, with their citations. Free, no sign-in.