For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 56-203 — Regulatory floodplain use and limitations

Denver Revised Municipal Code (Supp. No. 147, Update 3: codified through Ordinance No. 0852-26, enacted July 13, 2026) · Denver Revised Municipal Code § 56-203

Corpus is an independent public-information project, not the official City of Denver website. Stable reference: corpuslaw.us/code/220fcd22-dc18-4631-a349-72cdf69ca95a

Sec. 56-203. - Regulatory floodplain use and limitations.

(a) General. The following provisions shall apply to all uses within all areas of regulatory floodplains as defined and adopted under subsections 56-202(d) and (e) of this article. (b) Existing uses. An existing use in a regulatory floodplain may be changed to any use which is allowed by the ordinances of the city; provided, however, that such change of an existing use shall be limited by and shall be in accordance with the regulations herein established. (c) Regulatory floodplain. In all areas of the regulatory floodplain, the following provisions are required: (1) No development, use, fill, excavation, construction or alteration within a regulatory floodplain shall be permitted, which acting alone or in combination with existing or future uses, would cause or result in any of the following: a. The storage or processing of materials that are buoyant, flammable, explosive or otherwise potentially injurious to human, animal or plant life in time of flooding; b. The disposal of garbage, sludge, waste materials or other potentially injurious substances in the floodplain; c. An obstruction or depositing of any material which would impair the flow capacity of a regulatory floodplain or increase floodwater depths or velocities so as to cause probable damage to others wherever located; d. A substantial increase in sedimentation and/or erosion. (2) All new construction, lateral additions, and substantial improvements shall be approved by the manager for location and shall be: a. Designed (or modified) and adequately anchored to prevent flotation, collapse, or lateral movement of the structure resulting from hydrodynamic and hydrostatic loads, including the effects of buoyancy; and b. Designed and constructed with flood damage-resistant materials below the FPE; and c. Designed and constructed by methods and practices that minimize flood damages; and d. Designed and constructed with gas, electrical, heating, ventilation, plumbing, air conditioning, and communications equipment and other service facilities that are designed and/or located so as to prevent water from entering or accumulating within the components, or otherwise damaged, during conditions of flooding. (3) On-site waste disposal systems shall be located to avoid impairment to them or contamination from them during flooding. (4) No new manufactured home, new manufactured home park, or expansion to an existing manufactured home park shall be located in the regulatory floodplain. (5) All new and replacement water supply systems shall be designed to minimize or eliminate infiltration of floodwaters into the system. (6) All new and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of floodwaters into the system and discharge from the system into floodwaters. (7) For all proposed uses or developments that alter a watercourse within a regulatory floodplain, the following standards apply: a. Channelization and flow diversion projects shall appropriately consider issues of sediment transport, erosion, deposition, and channel migration and properly mitigate potential problems through the project as well as upstream and downstream of any improvement activity. A detailed analysis of sediment transport and overall channel stability should be considered, when appropriate, to assist in determining the most appropriate design. b. Channelization and flow diversion projects shall evaluate the residual floodplains. c. Any channelization or other stream alteration activity proposed by a project proponent must be evaluated for its impact on the regulatory floodplain and be in compliance with all applicable federal, state and local floodplain rules, regulations and ordinances. d. Any stream alteration activity shall be designed and sealed by a licensed Colorado Professional Engineer or Certified Professional Hydrologist. e. All activities within the regulatory floodplain shall meet all applicable federal and state requirements and regulations, as well as the provisions of this article and implementing regulations adopted by the manager. f. Within the floodway, stream alteration activities shall not be constructed unless the project proponent demonstrates through a floodway analysis and report, sealed by a licensed Colorado Professional Engineer, that there is not more than a 0.00-foot rise in the proposed conditions compared to existing conditions floodway resulting from the project, otherwise known as a no-rise certification, unless a CLOMR for the floodway revision has been approved by FEMA. g. Maintenance shall be required for any altered or relocated portions of watercourses so that the flood-carrying capacity is not diminished. (8) For waterways with base flood elevations for which a regulatory floodway has not been designated, no proposed use or development shall be permitted within zone AE, unless it is demonstrated that the cumulative effect of the proposed development, when combined with all other existing and anticipated development, will not increase the water surface elevation of the base flood more than one-half (0.5) foot at any point within the community; unless a FEMA approved CLOMR has been issued for that use or development. (9) Permitted uses: The following uses shall be permitted within the regulatory floodplain to the extent that they will comply with all requirements of this article and the Denver Zoning Code: a. Agricultural uses such as general farming, pasture, grazing, outdoor plant nurseries, horticulture, truck farming, forestry, sod farming and wild crop harvesting; b. Uses such as loading areas, parking areas, airport landing strips and storage yards for equipment or machinery easily removed from the site or not subject to flood damage; c. Private and public recreational uses such as parks, golf courses, driving ranges, archery ranges, picnic grounds, boat launching ramps, and hiking, biking and horseback riding trails; d. Utility facilities that are not considered to be critical facilities including, but not limited to, wastewater facilities, water, gas and electric distribution facilities, roadways and bridges; e. Fill, excavation or deposit of materials: 1. Any such fill, excavation or deposit of materials shall be permitted only upon a finding that the fill, excavation or deposit of materials will have some beneficial purpose and the amount thereof will not be greater than is necessary to achieve that purpose, as demonstrated by a plan submitted by the owner showing the final dimensions of the proposed fill, excavation or material and the use to which the altered land will be put; 2. The fill or material does not encroach on the floodway; 3. Any fill or deposit that reduces the hydraulic capacity shall require appropriate hydraulic studies and a review of the urban impact on such reduction; 4. The fill or material will be protected against erosion by rip-rap, strong vegetative cover or bulkheading. (d) The floodway. The floodway is an extremely hazardous area due to the velocity of floodwaters which carry debris, potential projectiles, and erosion potential. In addition to subsection 56-203(c), the following provisions shall also apply to all uses within the floodway: (1) No encroachments, including fill, obstructions, new construction, lateral additions, substantial improvements, or other development shall be permitted within the floodway unless it has been demonstrated through hydrologic and hydraulic analyses performed by a licensed Colorado Professional Engineer and in accordance with standard engineering practice that the proposed encroachment would not result in any increase (requiring a no-rise certification) in flood levels during the occurrence of the base flood. (2) No building designed for human occupancy shall be placed in the floodway. (3) Encroachments may be permitted in the floodway that result in an increase in base flood elevations, provided that a CLOMR for the floodway revision is approved by FEMA. (e) Flood storage area. In addition to the provisions of subsection 56-203(c), the following requirements shall also apply to all uses in the flood storage area: (1) Residential construction. New construction, lateral addition, and substantial improvement of any residential structure shall meet the following requirements: a. Have the lowest floor (including basement) and all associated machinery and equipment, elevated with a minimum of one and one-half (1½) feet of freeboard. b. Within zones AH and AO, have adequate drainage paths around structures on slopes, to guide floodwaters around and away from proposed structures. c. Upon completion of construction, and prior to certificate of occupancy, a "finished construction" version of the FEMA Elevation Certificate must be submitted to, and approved by, the Floodplain Administrator. (2) Nonresidential construction. New construction, lateral addition, and substantial improvement of any commercial, industrial or other nonresidential structure, with the exception of critical facilities, shall meet the following requirements: a. Either have the lowest floor (including basement) and all associated machinery and equipment: 1. Elevated with a minimum of one and one-half (1.5) feet of freeboard; or 2. Together with attendant utility and sanitary facilities be dry floodproofed with a minimum of one and one-half (1.5) feet of freeboard. b. Within zones AH and AO, have adequate drainage paths around structures on slopes, to guide floodwaters around and away from proposed structures. c. Upon completion of construction, and prior to certificate of occupancy, a "finished construction" version of the FEMA elevation certificate must be submitted to, and approved by, the floodplain administrator. If dry floodproofed, a "construction drawings" version of the FEMA Floodproofing Certificate must be submitted to, and approved by, the floodplain administrator prior to permit issuance and a "finished construction" version of the FEMA floodproofing certificate must be submitted to, and approved by, the floodplain administrator prior to validation of certificate of occupancy. (3) Crawlspaces. New construction, lateral addition, and substantial improvement involving any crawlspace shall meet the following requirements: a. The crawlspace, and all machinery and equipment, must either: 1. Have the interior grade elevated with a minimum of one and one-half (1.5) feet of freeboard; or 2. Be wet floodproofed with a minimum of one and one-half (1.5) feet of freeboard. b. Wet floodproofing shall only be permitted for crawlspaces meeting the following requirements: 1. They shall be used solely for parking of vehicles, building access, or limited storage and not used for human habitation; and 2. All associated machinery and equipment shall be elevated or dry floodproofed to a minimum of the FPE; and 3. The interior grade elevation that is below the FPE shall not be lower than two (2) feet below the lowest adjacent grade; and 4. The height of the crawlspace, measured from the bottom of the floor joist to the top of footing, shall not exceed four (4) feet at any point; and 5. An adequate drainage system that allows floodwaters to drain from the interior area of the crawlspace following a flood shall be provided; and 6. The enclosed area shall be designed to automatically equalize hydrostatic flood forces on exterior walls by allowing for the entry and exit of floodwaters as required under NFIP regulations Section 60.3(c)(5). (4) Accessory structures. New construction, lateral addition, and substantial improvement of any accessory structure shall meet the following requirements: a. Have the lowest floor (including basement) and all associated machinery and equipment be either: 1. Elevated with a minimum of one and one-half (1.5) feet of freeboard; or 2. Wet floodproofed with a minimum of one and one-half (1.5) feet of freeboard. b. Within zones AH and AO, have adequate drainage paths around structures on slopes, to guide floodwaters around and away from proposed structures. c. Upon completion of construction, and prior to certificate of occupancy, a FEMA Elevation Certificate must be submitted to, and approved by, the floodplain administrator. d. Wet floodproofing shall only be permitted for accessory structures meeting the following requirements: 1. They shall be used solely for parking of vehicles, building access, or limited storage and not used for human habitation; and 2. They shall be designed to have low flood damage potential, and be no more than six hundred (600) square feet; and 3. They shall be constructed and placed on the building site so as to offer the minimum resistance to the flow of floodwaters; and 4. They shall be firmly anchored to prevent floatation, collapse and lateral movement; and 5. All associated machinery and equipment shall be elevated or dry floodproofed to a minimum of the FPE; and 6. The enclosed area shall be designed to automatically equalize hydrostatic flood forces on exterior walls by allowing for the entry and exit of floodwaters as required under NFIP regulations Section 60.3(c)(5); and 7. They shall not be placed in the floodway unless it meets the provisions of subsection 56-203(d). (5) Critical facilities. New construction, lateral addition, and substantial improvement of critical facilities shall be regulated as in subsection 56-203(e)(2), except critical facilities shall be protected to a higher standard than structures not determined to be critical facilities. For the purposes of this article, protection shall include: a. Location outside of the regulatory floodplain; or b. Elevation of the lowest floor (including basement), and all machinery and equipment, with a minimum of two (2) feet of freeboard; or c. Dry floodproofing (including attendant utility and sanitary facilities) with a minimum of two (2) feet of freeboard. d. New critical facilities shall, when practicable. have continuous non- inundated access (ingress and egress for evacuation and emergency services) during the base flood. (6) Recreational vehicles (RV): All RVs placed on sites within zones A1-30, AH, and AE on the regulatory floodplain map shall either: a. Be on the site for fewer than one hundred eighty (180) consecutive days; or b. Be fully licensed and ready for highway use. An RV is ready for highway use if it is on wheels or a jacking system, attached to the site only by quick disconnect type utilities and security devices, and has no permanently attached additions. (f) Areas removed from SFHA by LOMR-F. For purposes of this article, areas that have been removed from the SFHA by a FEMA issued LOMR-F are hereby subject to the same provisions as subsection 56-203(e)(1), (2), (3), (4) and (5). These areas will not be subject to floodplain regulation if the LOMR-F area has since been superseded by a standard LOMR.

(Ord. No. 158-86, § 1, 3-17-86; Ord. No. 547-13, § 4, 11-4-13)

Ask a question about Denver law

Corpus searches the Denver sections it holds and shows the ones that match, with their citations. Free, no sign-in.