22.900D.150 - Electrical permit fees

A. Permit fees when plans and specifications are reviewed 1. Permit fees for electrical installations for which plans and specifications are reviewed by the Director shall be charged on a valuation basis as set forth in Table D-14 for 22.900D.150. 2. The Director shall determine the value of the construction, which is the value to the vendee of all labor, material, fittings, apparatus, and the like, whether actually paid for or not, supplied by the permit holder and/or installed by the permit holder as a part of, or in connection with, a complete electrical system, but that does not include the cost of utilizing equipment connected to the electrical system. The Director may require verification of the stated cost of any work subject to these fees. If the cost of any proposed installation is unknown, an estimate of the cost shall be made and used to compute the permit fee. The permit fee specified in Table D-14 for 22.900D.150 is due at the time of application. Upon completion of the installation, a fee adjustment may be made in favor of The City of Seattle or the permit holder, if requested by either party. 3. If a duplicate set of approved plans is submitted for examination and approval at any time after a permit has been issued on the original approved plans, hourly charges for Departmental work shall be assessed. B. Permit fees if plans and specifications are not required 1. Permit fees for electrical installations, additions, and alterations for which plans and specifications are not required shall be as set forth in Table D-15 for 22.900D.150. The permit fee specified in Table D-15 for 22.900D.150 is due at the time of application. 2. Permit fees for temporary electrical installations shall be charged for services only at the rate set forth in Table D-15 for 22.900D.150. 3. If the base fee and SDCI hourly rate are used to calculate the fee in Table D-15 for 22.900D.150, use Section 22.900B.010 to determine the permit fee. 4. Permit exemptions in the Electrical Code apply to the fees in 22.900D.150. C. Phased permits 1. If an electrical project is proposed to be installed in phases and the Director determines that separate electrical permits may be issued for portions of the project, the permit fee for the initial permits shall be based on the estimated value of the work under that permit according to Table D-14 for 22.900D.150. The fee for the final permit shall be the fee based on the total value of the electrical installations minus the sum of the values of the initial permits. 2. If an applicant requests that an application for a permit be divided into separate applications subsequent to the initial submittal of a unified application, an additional fee shall be charged at the rate of one times the base fee for each separate application which results from the division. D. Renewals and reestablishment The fee to renew or reestablish an electrical permit is 1/4 times the SDCI base fee if renewed 30 days prior to expiration or up to one year after. For electrical permits renewed more than one year after expiration, the rate is 1/2 times the SDCI base fee. Table D-14 for 22.900D.150 — ELECTRICAL PERMIT FEES (When Plans Are Reviewed) Total Valuation | Fee $0 to $1,000 | $260 for the first $1,000 of value or fraction thereof $1,001 to $5,000 | $260 for the first $1,000 of value plus $6 for each additional $100 of value or fraction thereof $5,001 to $25,000 | $500 for the first $5,000 of value plus $2.75 for each additional $100 of value or fraction thereof $25,001 to $50,000 | $1,050 for the first $25,000 of value plus $2.50 for each additional $100 of value or fraction thereof $50,001 to $75,000 | $1,675 for the first $50,000 of value plus $2.25 for each additional $100 of value or fraction thereof $75,001 to $100,000 | $2,237.50 for the first $75,000 of value plus $2 for each additional $100 of value or fraction thereof $100,001 to $175,000 | $2,737.50 for the first $100,000 of value plus $8 for each additional $1,000 of value or fraction thereof $175,001 to $250,000 | $3,337.50 for the first $175,000 of value plus $7.50 for each additional $1,000 of value or fraction thereof $250,001 to $500,000 | $3,900 for the first $250,000 of value plus $7 for each additional $1,000 of value or fraction thereof $500,001 to $750,000 | $5,650 for the first $500,000 of value plus $6.50 for each additional $1,000 or fraction thereof $750,001 to $1,000,000 | $7,275 for the first $750,000 of value plus $6 for each additional $1,000 of value or fraction thereof $1,000,001 to $1,500,000 | $8,775 for the first $1,000,000 of value plus $5.50 for each additional $1,000 of value or fraction thereof $1,500,001 to $2,000,000 | $11,525 for the first $1,500,000 of value plus $5 for each additional $1,000 of value or fraction thereof $2,000,001 to $2,500,000 | $14,025 for the first $2,000,000 of value plus $4.50 for each additional $1,000 of value or fraction thereof $2,500,001 to $3,000,000 | $16,275 for the first $2,500,000 of value plus $4 for each additional $1,000 of value or fraction thereof $3,000,001 to $3,500,000 | $18,275 for the first $3,000,000 of value plus $3.50 for each additional $1,000 of value or fraction thereof $3,500,001 to $4,000,000 | $20,025 for the first $3,500,000 of value plus $3 for each additional $1,000 of value or fraction thereof $4,000,001 to $4,500,000 | $21,525 for each additional $4,000,000 of value plus $2.75 for each additional $1,000 of value or fraction thereof $4,500,001 to $5,000,000 | $22,900 for the first $4,500,000 of value plus $2.50 for each additional $1,000 of value or fraction thereof $5,000,001 to $10,000,000 | $24,150 for the first $5,000,000 of value plus $2.25 for each additional $1,000 of value or fraction thereof $10,000,001 and up | $34,150 for the first $10,000,000 of value plus $2 for each additional $1,000 of value or fraction thereof Correction or revision | SDCI hourly rate, 1 hour minimum Get started - when submitting application with plans - branch circuits only | SDCI base fee × 1/2 plus administrative fee Renewable energy systems: 12 kW to 26 kW | SDCI base fee × 3 Table D-15 for 22.900D.150 — Electrical Permit Fees (When Plans Are Not Required) 1. Administrative Fee a. An administrative fee of $55.48 will be charged in addition to the other fees specified in this table for all items except subsection 3.f of this Table D-15 for 22.900D.150. b. A change fee of $55.48 will be charged if work is added to an issued permit and if other information is changed. 2. Minimum Permit Fee The minimum fee for a standard Online Trade-Construction (OTC) self-issued electrical permit is $105.12, except for the Ufer Inspection Only Specialty Permit, subsection 3.c of this Table D-15 for 22.900D.150. 3. Specialty Permits | Size | Fee a. Service repair (mast and meter base only) | Any | $146.00 b. Temporary construction power (for services under 400 amps. Ufer included if inspected simultaneously) | Any | $146.00 c. Ufer inspection only (Included with standard OTC electrical permit) | Any | Administrative fee only d. Ufer test (only when Ufer covered prior to inspection) | Any | $292.00 e. Underground work only (per inspection, raceways only) | Any | $146.00 f. SCL request for safety inspection | Any | $146.00 No administrative fee g. Special events i. Inspections occurring during normal business hours | SDCI base fee × 1 (minimum 1/2 hour) ii. Inspections occurring outside normal business hours | SDCI base fee × 1.5 (minimum 1.5 hours) 4. Inspection only (Half-hour inspection where no other fee applies) | Fee Each | $146.00 5. Low-voltage and Communication Systems 1, 2 | Fee Low-voltage systems 3 ? sound systems, security systems, fire alarms, nurse call, industrial controls, and similar | Requires separate permit for each system a. Control unit | $17.52 each b. Device (activating, horn, alarm, etc.) | $2.92 each Communications systems 4 - voice cable, data cable, coaxial cable, fiber optics, and similar | The maximum fee is $636.56 a. Control unit | $17.52 each b. Outlet | $2.92 each 6. New or Altered Electrical Service 5 | Fee Up to 125 amperes | $146.00 150 to 200 amperes | $292.00 225 to 350 amperes | $365.00 400 amperes or more | Plan review only 7. Branch Circuit and/or Feeder 6 (new or altered - defined as the replacement, installation or modification of receptacles, switches, luminaires, or wiring on a branch circuit or feeder) | Fee Up to 25 amperes | $26.28 30 to 50 amperes | $43.80 60 to 200 amperes | $146.00 225 to 350 amperes | $292.00 8. Heaters and Furnaces 3 | Fee Up to 2 kW | $8.76 3 kW to 15 kW | $23.36 16 kW to 40 kW | $78.84 41 kW or more | $146.00 9. Transformers 3, 4 | Fee Up to 6 kVA | $20.44 7 kVA to 15 kVA | $64.24 16 kVA to 45 kVA | $146.00 46 kVA or more | $219.00 10. Car Chargers 3 | Fee Level 1 Car Charger (120 volts) Each | $26.28 Level 2 Car Charger (208-240 volts) 15 amperes to 25 amperes | $26.28 30 amperes to 50 amperes | $52.56 60 amperes to 225 amperes | $108.04 250 amperes or more | Plan review only Level 3 Car Charger (DC) 15 amperes to 50 amperes | $73.00 60 amperes to 125 amperes | $146.00 150 amperes to 225 amperes | $219.00 250 amperes or more | Plan Review Only 11. Renewable Energy Systems 3,7 (photovoltaic, wind power generation, etc.) | Fee Below 12 kW | $438.00 12. Motors 3 | Fee Up to 1/2 HP | $8.76 3/4 to 5 HP | $32.12 6 to 20 HP | $73.00 21 to 49 HP | $146.00 50 HP or more | $219.00 Footnotes to Table D-15 for 22.900D.150 1 Single family dwelling electrical permits do not require additional fees for voice audio or data systems except for security systems, which require permit fees. 2 Communication systems include, but are not limited to, systems listed in Article 770 and Chapter 8 of the Seattle Electrical Code. 3 Exception to footnote 6—Heaters and Furnaces, Transformers, Car Chargers, Renewable Energy Systems, and Motors are separate fees, and include the branch circuits feeding them. 4 The transformer fee includes the primary feeder and one secondary feeder up to and including the first panelboard or disconnect. Additional secondary panelboards or disconnecting means are charged at the appropriate panel rate. 5 Service or panel fees include the conductors feeding the panel. 6 New or altered branch circuits now include device connections (luminaires, receptacles, switches, washers, disposals, etc.). 7 OTC permits, for photovoltaic systems below 12 kW require supporting documents and one-line diagram. Photovoltaic systems above 12 kW require a plan review permit as in Table D-14 for 22.900D.150.

(Ord. 127360, § 4, 2025; Ord. 127134, § 10, 2024; Ord. 127133, § 10, 2024; Ord. 126709, § 10, 2022; Ord. 126473, § 3, 2021; Ord. 126213, § 4, 2020; Ord. 125982, § 13, 2019; Ord. 125451, § 10, 2017; Ord. 125184, § 14, 2016; Ord. 124919, § 109, 2015 [department name change and other cleanup]; Ord. 124636, § 12, 2014; Ord. 124047, § 18, 2012; Ord. 123755, § 10, 2011; Ord. 123453, § 16, 2010; Ord. 122855, § 11, 2008; Ord. 121664, § 16, 2004; Ord. 121338, § 4, 2003; Ord. 120997, § 14, 2002; Ord. 120818, § 16, 2002; Ord. 120448, §§ 10, 11, 12, 2001; Ord. 119766, § 13, 1999; Ord. 119255, § 2, 1998.)

Ask a question about Seattle law