§ 68.121 — Compliance
Saint Paul Legislative Code (Supp. No. 133, Update 1: codified through Ordinance No. 26-26, adopted May 13, 2026) · Saint Paul Legislative Code § 68.121
Corpus is an independent public-information project, not the official City of St. Paul website. Stable reference: corpuslaw.us/code/22db812a-1ed5-4f89-8230-0e479473559d
Sec. 68.121. - Compliance.
(a) Permit required. A building permit issued by the building official in conformance with the provisions of this chapter shall be secured as required by the Minnesota State Building Code prior to the erection, addition, modification, rehabilitation (including normal maintenance and repair), or alteration of any building, structure, or portion thereof; prior to the construction of a dam or on-site septic system; and prior to the repair of a structure that has been damaged by flood, fire, tornado, or any other source. A permit approved by the zoning administrator in conformance with the provisions of this chapter shall be secured prior to the use or change of use of a building, structure or land; prior to construction of a detached accessory structure, detached deck or platform, fence, retaining wall, or tank; and prior to the placement of fill, excavation of materials, or the storage of materials or equipment within the floodplain. A permit issued by the planning commission in conformance with the provisions of this chapter shall be secured prior to the change or expansion of a nonconforming use. (b) Compliance of uses or occupations required. No use or occupation of any lands, for any purpose whatsoever, shall hereafter be permitted within the floodplain management overlay districts without full compliance with the terms of this chapter and other applicable laws. (c) Compliance of structures, fill, etc. No structure, fill, material or object shall hereafter be placed on or removed from lands within the floodplain management overlay districts, and no structures or other object shall hereafter be located, used, occupied, constructed, erected, converted, altered, or enlarged within the district without full compliance with this chapter and other applicable laws. (d) Review of building permits for adequate floodproofing. All building permits for structures proposed to be floodproofed shall be reviewed to determine whether the structures will be adequately floodproofed. (e) Certification. Before a certificate of occupancy is issued for any development in the floodplain management overlay districts, the applicant shall submit to the zoning administrator certification by a registered professional engineer, registered architect, registered landscape architect or registered land surveyor that the finished fill and building elevations were accomplished in compliance with the provisions of this chapter. Finished fill and building elevations shall be verified by ground surveys. Floodproofing measures shall be certified by a registered professional engineer or registered architect. (f) Record of elevation of lowest floor and floodproofing. The zoning administrator shall maintain a record of the elevation of the lowest floor (including basement) of all new structures, altered structures or additions to existing structures in the floodplain. The zoning administrator shall also maintain a record of the elevation to which all new structures and alterations or additions to structures are floodproofed. (g) Notifications for watercourse alterations. The zoning administrator shall notify, in riverine situations, adjacent communities and the commissioner of the department of natural resources prior to the community authorizing any alteration or relocation of a watercourse. If the applicant has applied for a permit to work in the beds of public waters pursuant to Minn. Stat., ch. 103G, this shall suffice as adequate notice to the commissioner of natural resources. A copy of said notification shall also be submitted to the Chicago Regional Office of the Federal Emergency Management Agency (FEMA). (h) Notification to FEMA when physical changes increase or decrease the one hundred (100) year flood elevation. As soon as is practicable, but not later than six (6) months after the date such supporting information becomes available, the zoning administrator shall notify the Chicago Regional Office of FEMA of the changes by submitting a copy of said technical or scientific data.
(Ord. No. 25-72, § 1, 12-10-25)
Ask a question about St. Paul law
Corpus searches the St. Paul sections it holds and shows the ones that match, with their citations. Free, no sign-in.
