§ 18.20.210 — CLEANUP AND PROTECTION OF PUBLIC RIGHTS OF WAY

City Code of Salt Lake City, Utah (2026 S-21: current through Ord. 49-26, passed September 15, 2026) · Salt Lake City Code § 18.20.210

Corpus is an independent public-information project, not the official City of Salt Lake City website. Stable reference: corpuslaw.us/code/23b91620-5c34-43b8-9c91-a25d9c82a0fe

18.20.210: CLEANUP AND PROTECTION OF PUBLIC RIGHTS OF WAY:

A. Each permit holder shall be responsible to see that vehicles used in the process of carrying out the work authorized by the permit shall not track any mud, dirt or debris of any kind upon any streets or sidewalks within the corporate limits of Salt Lake City Corporation unless a permit has been obtained from the city engineer for use of a designated portion of the right of way with provisions made to keep that portion of the right of way and adjacent areas cleared of mud, dirt or debris of any kind. The permittee shall install a suitable process to clean the wheels of the equipment prior to its leaving the job site and entering the streets of Salt Lake City Corporation. The suitable process shall consist of: 1. A cleaning area and crew to clean mud and dirt off the wheels and exterior body surface of the trucks, or its equivalent; 2. The cleaning area shall be arranged to furnish adequate draining to prevent puddling; the cleaning area shall be kept mud free and may be on a macadam or concrete slab; 3. The cleaning area shall be located on private property and arranged in such a way that there is no blocking of vehicular or pedestrian traffic on city rights of way except where permission has been granted by the city engineer; 4. The cleaning water or solution used for cleaning shall not be allowed to enter the city streets, gutter, or storm drain or sanitary sewer system. B. All trucks and equipment leaving the site with earthen materials or loose debris shall be loaded and/or covered in such a manner as to prevent dropping of materials on city streets and/or sidewalks. C. Ramps constructed over curbs and gutters shall not interfere with or block the passage of water along the gutter and shall be constructed of asphalt material that will not erode or deteriorate under adverse weather conditions. D. The permit holder shall install erosion and water runoff controls sufficient to ensure that no stormwater, surface water, sediments or debris from the construction site shall drain or wash or be tracked into any public right of way or other adjacent properties, including curb and gutter, unless permission has been granted through the erosion control plan. These controls shall be sufficient to cover any contingency, including, but not limited to, seasonal storms, unseasonal storms, or methods of construction. The building official or the city engineer may require, when in his/her discretion he/she deems necessary, an erosion control plan to be submitted for approval. Such plan may be required any time during construction and must be submitted within 5 days of the request. The building official or the city engineer may suspend all work until the plan requested is approved. The permit holder will maintain all erosion control facilities throughout the life of the construction project. He/she will monitor their effectiveness after storms and make the necessary adjustments to ensure they function correctly. E. The sidewalk and/or curb and gutter shall not be used for storage of debris, dirt or excavated materials. In addition, the sidewalks shall not be removed, blocked or otherwise rendered unusable by either the storage of construction equipment or materials or the construction procedures used, unless a safe, usable alternate walkway along the same side of the street is provided by the contractor unless a permit has been issued by the city engineer. All alternate walkways shall be ramped in accordance with handicap ramp requirements and so constructed as to provide an all weather walking surface 4 feet wide as sound and smooth as the normal concrete sidewalk. F. The permit holder shall be responsible for the immediate removal of mud, dirt or debris deposited on city streets, sidewalks and/or curb and gutters by equipment leaving the site or by the permit holder's construction procedures. G. If it becomes necessary for the city street crews to remove any mud, dirt, or debris which has been deposited upon a street or sidewalk of Salt Lake City Corporation, the total cost to the city of such removal will be charged to the property owner or permit holder, including legal fees, if any. Payment of such charges will be made to the city prior to certification of final inspections, utility clearances, and issuance of a certificate of occupancy. H. The building official or the city engineer is empowered to suspend any permit until the permit holder installs the necessary cleaning equipment and/or erosion control facilities to ensure that no dust or debris is deposited upon the streets and sidewalks of Salt Lake City Corporation. Such device shall operate in a manner satisfactory to the building official or the city engineer. (Ord. 91-24, 2024: Ord. 65-87 § 1, 1987: prior code § 5-5-20)

Ask a question about Salt Lake City law

Corpus searches the Salt Lake City sections it holds and shows the ones that match, with their citations. Free, no sign-in.