§ 52.12. - Cost; special compensation fees.
(a) Unless otherwise authorized by the city council and except as hereinafter provided, when application is made for a water main extension, the office of public utilities shall cause to be prepared an estimate of the cost to complete such extension for a time-and-materials job or shall prepare a total cost for a unit-cost job. The developer shall provide, free of charge, all necessary easements for all CWLP water facilities for the purpose of providing water to the development. (b) Time-and-materials estimates shall be prepared for: (1) All non-single-family/duplex residential developments including commercial developments; (2) Off-site main extensions needed to bring water service to the entrance of a proposed single-family/duplex residential development; (3) Pressure taps of supply mains; and (4) Any water main boring work. (c) Unit-cost total cost quotes shall be provided for all new single-family/duplex residential developments. Except for costs as might apply from section 52.12(b), the unit-cost quote is intended to be an all-in total cost quotation to provide all labor, equipment, and materials to provide water distribution throughout the interior of new single-family/duplex residential subdivisions. These costs will include pipe[s], valves, fittings, hydrants, small diameter distribution to each lot, granular backfill at street crossings, design and construction engineering costs, preparation of Illinois Environmental Protection Agency construction and operating permits for the facilities, and flushing, sampling, and laboratory testing of the water in the new main. Initial unit costs shall be $45 per linear foot of installed water main plus $350 per lot ($500 for duplex lots), and shall remain in effect until May 15, 2013, when said unit costs shall be adjusted in accordance with section 52.12(d). (d) Unit costs for total cost quotations provided in section 52.12(c) shall be adjusted each May 15 beginning on May 15, 2013, based on the same percent change as the change in the annual value of the United States Department of Labor, Bureau of Labor Statistics (BLS), Consumer Price Index, Midwest Region, All Items, Size Class B/C (Series ID CUURX200SA0). In the event this Series ID CUURX200SA0 is no longer provided by the BLS, CWLP will use the nearest equivalent replacement available provided by the BLS. The current rates will be available from the water distribution engineering department. (e) Payment shall be made prior to construction of the water system. Construction shall begin within a reasonable amount of time after payment. In the event there are changes in the construction plans, any resulting increased costs shall be paid for by the developer, and any decrease in costs shall be reimbursed by CWLP. All payments shall be at the applicable rate at the time payment is made. In the event that construction is delayed by the developer for a period of six months or longer from the time of initial payment, the cost shall be adjusted to the then current rate. Three methods of payment are available to the applicant: (1) Method 1. The applicant for such extension shall deposit with the office of public utilities an amount equal to the time-and-materials estimate or the amount equal to the total cost for a unit-cost job, as applicable. CWLP will order materials and complete the extension. (2) Method 2. The applicant, for a time-and-materials job, shall deposit with the office of public utilities an amount equal to the material costs (total estimate amount less the labor and equipment line items) in the estimate. For a unit-cost job, the applicant shall deposit with the office of public utilities 50% of the total cost. Upon purchase and receipt of materials, the city will notify the applicant and will schedule a construction date. The applicant will forward to the city the amount of the balance of payment due. The city will confirm a construction date, but likely no sooner than 48 hours after receipt of the balance of payment. (3) Method 3. The applicant shall obtain an irrevocable letter of credit from a bank in the amount of funds equal to the estimated cost for a time-and-materials job or equal to the total cost for a unit-cost job, as applicable for the proposed project. The letter of credit shall be structured such that upon receiving a request from the city, the bank shall deliver to the city such funds as the city may desire for the needs of the project without further involvement by the applicant. All fees to establish and maintain the letter of credit will be the responsibility of the applicant. (4) For all of the above alternate payment plans on all time-and-materials jobs, the applicant will be refunded such amount of the deposit or draw as shall not be needed to pay the cost of such extension. If the cost of the extension exceeds the estimate, the applicant shall be billed for the excess. For unit-cost jobs, the total cost is the amount paid; there is no associated refund for overpayment or billing the excesses. (f) The owners of property fronting on and which will be served by water mains 12 inches or less in diameter constructed by the city entirely out of city funds shall in addition to the customary tapping charges pay a special compensation fee as provided in subsection (g) below. (g) A special compensation fee for each lot or parcel to be served with water shall be charged at the rate of $9 for each front foot of any lot or parcel before a tap utilizing ¾-inch or one-inch pipe will be allowed. No additional special compensation fee will be required where a second tap is required and the special compensation fee has been paid for the frontage involved. (h) If a building is located or constructed on an unplatted area, a tap will be granted for a specifically described tract less than the whole unplatted area, but only for a tract having a minimum frontage of 50 feet. However, the frontage must cover all the premises comprising the yard of the particular property. (i) In cases of odd shaped lots or tracts or unusual circumstances or taps utilizing larger than one-inch pipe, the amount of the special compensation fee shall be ascertained by the manager of the water division in a manner equitable to both the city and the applicant based on the proportionate size of the water service, the extent of property to be served and the probable use of water. (j) In all cases the minimum special compensation fee shall be the sum of $450.
(Ord. No. 670-9-95, § 1(Exh. J), 9-19-95; Ord. No. 593-11-98, § 1, 11-17-98; Ord. No. 227-7-12, Exh. A, 7-3-12)
Ask a question about Springfield law
Corpus searches the Springfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.