Wind turbine generator deicing -- requirement
Mont. Code Ann. § 75-26-403
in effect75-26-403. Wind turbine generator deicing -- requirement
After January 1, 2026, a wind turbine generator must use commercially reasonable efforts to mitigate icing risks during an operator-controlled turbine rotor blade deicing process if the wind turbine generator is:
(1) 500 feet or more in height, as measured from the natural ground level at the base of the tower to the tip of the turbine rotor blade;
(2) constructed within an area with an ice class rating of 4 or more, as defined in international energy agency guidelines published in February 2017; and
(3) located within a distance of 1,500 feet from an occupied residence.
En. Sec. 2, Ch. 761, L. 2025.