Water system capacity charge.
Columbus City Codes § 1105.17
in effect1105.17 - Water system capacity charge.
No person shall make a service connection or any part thereof, unless a permit has been issued by the Director of Columbus Water & Power or appointed designee. The following charges shall be levied for each service connection made to any property and shall be paid at the time a permit is issued for the service connection. A separate payment shall be submitted for each permit requested.
If an existing tap is replaced with a new tap, the system capacity charge for the new tap shall be reduced by the system capacity rate for each tap replaced. Should the sum total of the credits exceed the system capacity rate for the new tap, the system capacity charge shall be zero (0.00). Replacement tap credits will be determined by current system capacity rates. No credit refunds will be issued.
For all taps used to supply fire protection only, the charge shall be one-half (½) the amount specified in this section.
Water System Capacity Charges Inside City
Tap Size | Amount
¾ | $1,406
1 | 2,210
1-½ | 4,821
2 | 10,045
3 | 20,089
4 | 40,179
6 | 64,286
8 | 112,501
10 | 220,984
12 | 341,520
16 | 401,788
Water System Capacity Charges
Contract Areas
Tap Size | Amount
¾ | 1,828
1 | 2,873
1-½ | 6,268
2 | 13,058
3 | 26,116
4 | 52,232
6 | 83,572
8 | 146,251
10 | 287,279
12 | 443,976
16 | 522,325
Water System Capacity Charges
Noncontract Areas
Tap Size | Amount
¾ | $2,109
1 | 3,315
1-½ | 7,232
2 | 15,067
3 | 30,134
4 | 60,268
6 | 96,429
8 | 168,751
10 | 331,475
12 | 512,280
16 | 602,682
(Ord. 525-96; Ord. 781-02 § 1: Ord. 1931-05 § 1; Ord. 422-06 § 2 (part); Ord. No. 3082-2025, § 1, 11-24-2025; Ord. No. 1882-2026, § 1, 6-29-2026)