§ 523.25 — Interconnection Service for Distributed Generation

Codified Ordinances of the City of Cleveland, Ohio (2026 S-28: current through legislation passed October 19, 2026) · Codified Ordinances of Cleveland § 523.25

Corpus is an independent public-information project, not the official City of Cleveland website. Stable reference: corpuslaw.us/code/24a6c955-f234-4c6d-8c36-3f4974b2882a

§ 523.25 Interconnection Service for Distributed Generation

(a) Applicability. Interconnection shall be available to residential and non-residential customers whose accounts are paid in full at the time of the request for interconnection and who purchase their requirements of electric service from the Division under the applicable rate schedule and own and operate distributed generation located on the residential and/or non-residential customer’s premises. (b) Definitions. (1) “Customer premises” is the site where the distributed generation is produced and consumed, including adjacent or contiguous property. (2) “Distributed generation” is electrical generation located on the customer’s premises that: A. Is primarily intended to offset part or all of the customer’s own electrical requirements on the premises; B. Is interconnected with the Division’s electric system in compliance with the terms of division (c) of this section; and C. Operates in parallel with the Division’s distribution system. (3) “Excess generation” is the kilowatt hours of energy supplied by the customer’s distributed generation resource that exceeds the amount of energy consumed by the customer in a billing period. (c) Service by Distributed Generation. No customer shall transmit, distribute or deliver electricity from the customer’s distributed generation to any location other than the Customer’s premises absent the Division’s written consent. (d) Interconnection. No customer shall connect distributed generation to the Division’s distribution system except upon the Division’s approval of a written application in a form prescribed by the Division. The customer shall be responsible for the permitting, design, installation, operation, and maintenance of the distributed generation; the costs of any necessary modification of the Division’s facilities; and payment of the Division’s cost to review the application and perform any necessary studies. The distributed generation shall comply with all applicable safety, power quality, and interconnection requirements established by the National Electric Code (“NEC”), the Institute of Electrical and Electronics Engineers (“IEEE”), Underwriters Laboratories (“UL”), and any applicable local and state agencies. The Division shall have the right to approve the type of generation installed by the customer based on considerations of health, safety, regulatory compliance by the Division, and the reliability of the Division’s distribution system. The Division shall limit interconnected distributed generation to fifteen percent (15%) of the peak load of the line or line segment, or such other limit as the Division deems appropriate for safety and reliability purposes. (e) Sales to Customer. Customer shall pay for electricity delivered to customer from the Division measured by a single bidirectional electric meter or meters capable of recording the flow of electricity in each direction. Sales to a customer with a customer-owned distributed generation facility shall be consistent with the applicable retail rate tariff established by the Division applicable to the customer as if there were no customer-owned renewable resource generation facility pursuant to Sections 523.02 through 523.0491. Except for Commercially Contracted Alternative Rate and Capacity Enhancement customers, the Customer shall also pay a Power Supply Recovery (PSR) charge pursuant to Section 523.21. (f) Credits. Credits for Excess Generation from a Customer-Owned Distributed Generation Facility, Credits for Excess Generation, as defined in the Interconnection Standards for Installation and Parallel Operation of Customer-Owned Renewable Electric Generation Facilities, from an approved Customer Distributed generation facility shall be calculated using at the Division’s avoided power supply cost rate as determined by the Division as published annually, and as may be adjusted at any time. In exchange for the Excess Generation, the customer shall receive a monetary credit issued in accordance with Section 523.26(d) on a monthly basis (Customer Owned Generation Credit). After the PSR is calculated, the Division will remove the costs related to the capacity and transmission to determine the Customer Owned Generation Credit. The Division shall not provide, and the customer shall not be entitled to, Customer Owned Generation Credits for any month where the Customer: (a) terminates service from the Division at the customer premises; (b) vacates the customer premises; or (c) does not receive electric service from the Division. (g) Standby Power Charge. Distributed generation installations of any kind totaling ten (10) kilowatts or less at a single premise shall not be subject to standby power charges. There shall be no standby power charge for wind or solar distributed generation of any size. All other distributed generation installations totaling more than ten (10) kilowatts at a single premises shall be subject to the standby rate contained in Section 523.12 multiplied by the rated capacity of the distributed generation. (h) Liability. The City shall not be liable directly or indirectly for permitting or allowing the connection of customer’s distributed generation to the Division’s distribution system or for the acts or omissions of the customer generator that cause property damage, loss, injury, or death to any person. (Ord. No. 587-2026. Passed 7-15-26, eff. 7-20-26) Note: Former section 523.25 was repealed by Ord. No. 910-98, passed 2-14-00, eff. 2-22-00.

Ask a question about Cleveland law

Corpus searches the Cleveland sections it holds and shows the ones that match, with their citations. Free, no sign-in.