§ 19-65 — Sewer tap and activation fees
Code of Ordinances of the City of Tyler, Texas (September 2026: including amendments through September 9, 2026) · Tyler City Code § 19-65
Corpus is an independent public-information project, not the official City of Tyler website. Stable reference: corpuslaw.us/code/24a729e7-3dd8-4e95-bd02-fac87f2a3021
Sec. 19-65. Sewer tap and activation fees.
a. Sewer tap fee. Installation of sewer connections (taps) and service connections from the main to the property line or point of user connection shall be performed only by Division employees or a contractor approved by the Director. The following charge shall be made for sewer connections, payable in advance: Sewer Tap Fee Size of Service | Charge 4-inch | $ 2050.00 (0-2006-79; 9-13-2006) (0-2008-128; 9/24/08) (Ord. No. 2009-7, 2/11/09) (Ord. No. 0-2017-77; 9/13/17) (Ord. No. 0-2018-69; 9/12/18) (Ord. No. 0-2019-80; 9/25/19) b. Activation fee. The tap fee shall include the cost of a tap and service connection from the main to the property line when the total length is fifty (50) feet or less and when installation is not by boring or tunneling under a street or other structure. In such cases the cost of tap and service shall be the actual cost of furnishing and installing the tap and service line plus a factor of 1.25 to cover overhead and administrative cost. Sewer services six (6) inches and larger will require an approved manhole at the junction with the main. The charge for six (6) inch and larger service connection will be the actual cost of construction including labor, equipment, materials and street restoration, times a factor of 1.25 to cover overhead and administrative costs. By permission of the Director, sewer services six (6) inches and larger may be constructed by an approved contractor. It is the responsibility of the property owner to maintain the private lateral sewer service from the sewer main to and on owners' property, including the connection to the sewer main. In addition to the sewer tap fee, there shall be payable in advance a sewer activation fee. The following fees shall be charged: Size of Service | Charge 4-inch | $26.50 6-inch and larger | $26.50 The Director may allow the construction of a single service connection to service two properties using a "y" at the joint property line. The connected property owner(s) shall be responsible for maintenance of that portion of the private lateral sewer service line extending from the sewer main to and through the "y" located at the joint property line, including the connection to the sewer main.(Ord. No. O-96-54, 6-26-96) (Ord. No. 0-99- 70, 10-1-99) (Ord 0-2003-42, 9-10-2003) (0-2008-128; 9/24/08) (Ord. No. 2009-7, 2/11/09) (Ord. No. 2020-72; 08/12/2020)
Ask a question about Tyler law
Corpus searches the Tyler sections it holds and shows the ones that match, with their citations. Free, no sign-in.
