For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 10-104 — Waiver of Development Exactions

Code of Ordinances of the City of Tyler, Texas (September 2026: including amendments through September 9, 2026) · Tyler City Code § 10-104

Corpus is an independent public-information project, not the official City of Tyler website. Stable reference: corpuslaw.us/code/250fa64a-8bb5-4464-90b5-6c8c93a4902d

Sec. 10-104. Waiver of Development Exactions

A property owner or applicant for preliminary or final plat approval may file a petition for relief from a dedication or construction requirement that is applied or imposed as a condition of approval of a preliminary plat, or final plat. The procedures for filing such a waiver are set forth in this code. a. Petition for Relief The property owner or applicant must submit a written petition for relief to the Planning Department at least 10 days prior to the Planning and Zoning Commission's consideration of the plat. The petition must list the reasons for the waiver request and must indicate the dedication and/or construction requirements for which relief is being requested. An applicant may also submit a petition for relief from conditions of plat approval added by the Commission in its consideration of a plat. This petition must be submitted no later than 10 days following the commission's action. b. Consideration of Plat After receipt of a petition for relief, the Planning Department will schedule consideration of the plat together with development exaction waiver within the 30-day time frame required by state law. c. Study Required The petitioner must provide a study in support of the petition at the time the written petition is filed. The Planning Director may extend the time for submitting the study upon the request of the applicant. The study must include the following information: 1. Total capacity of the City's public infrastructure system or improvements to be dedicated to the City to be utilized by the proposed subdivision, employing standard measures of capacity and equivalency tables that relate to the type of development proposed to the quantity of system capacity. In no case may the calculation of the capacity used by a proposed commercial or multifamily development be based on development intensities less than the mid-point of intensity allowed by the particular zoning for the property or the specific use being sought. If the proposed subdivision is to be developed in phases, such information must be provided for the entire development, including any phases already developed. 2. Total capacity to be supplied to the City's public infrastructure system by the proposed dedication of an interest in land or construction of capital improvements. If the development application is part of a phased development, the information must include any capacity supplied by prior dedications or construction of capital improvements. 3. Comparison of the capacity of the City's public facilities system to be consumed by the proposed subdivision with the capacity to be supplied by the proposed dedication of an interest in land or construction of capital improvements. In making this comparison, the impacts on the City's public facilities system from the entire development will be considered. 4. The effect of any City participation in the costs of oversizing the capital improvements to be constructed in accordance with the City's requirements. d. Processing of Petition The Engineering Department will evaluate the petition and supporting study and make a recommendation to the Planning and Zoning Commission based upon the petitioner's study and his/her own analysis. Engineering may use any reasonable methodology and information in evaluating the petitioner's study. In making a recommendation based on the study the following criteria will be considered: -Neighborhood Connectivity and street network -Drainage -Topography -Continuity of neighborhood design -Access -Street alignment -Possible resubdivision of remainder e. Consideration of Petition for Relief The petition for relief will be considered by the Planning and Zoning Commission when the plat is considered. Based upon the application, supporting study and Engineering's report, the Commission will determine whether the application of the regulations for dedication or public improvements is roughly proportional to the nature and impact created by the development. The Planning and Zoning Commission will take one of the following actions in considering the petition for relief: 1. Deny the petition for relief, and impose the standard or condition requiring dedication or construction of capital improvements in accordance with the regulations contained within this ordinance. 2. Recommend to City Council approval of the petition for relief, in whole or in part, for any dedication or construction requirement necessary to meet the criteria for final approval. 3. Accept alternative designs for the public infrastructure system or improvements to be dedicated to the City. 4. Delay the imposition of the requirement until a future phase of development. If a delay is granted, the future phase of development must be clearly defined. (Ord No. 0-2011-45, 6/8/11) f. Criteria for Approval The City Council will determine whether the application of the regulations requiring dedication of an interest in land for public improvements or construction of capital improvements is roughly proportional to the nature and extent of the impacts created by the proposed development on such water, wastewater, roadway, or drainage system, and reasonably benefits the development. The Council will take into account the evidence submitted by the petitioner and Engineering's report and recommendation. (Ord. 0-2012-38, 4/25/12) g. Appeals The decision of the Planning and Zoning Commission on a petition for relief may be appealed in accordance with Article VIII of this code. An appeal constitutes authorization for the plat to also be placed on the City Council's agenda for consideration and action. h. Lapse of Plat Approval If relief is granted to the petitioner, it will remain in effect for the time period specified for each type of plat, and will end upon expiration of the plat. i. Plat Modification If a plat for which relief was granted is modified to increase the number of residential units or the intensity of nonresidential uses, Engineering may require a new study to validate the relief. The petition for relief and new study must be submitted and processed according to the procedures outlined above. (Ord. No. O-2018-17; 2/14/18)

Ask a question about Tyler law

Corpus searches the Tyler sections it holds and shows the ones that match, with their citations. Free, no sign-in.