Sec. 20-267. Grading and drainage regulations; inspections and supervision.

(a) Supervised Grading Required. All fills used or intended to be used for the support of foundations of structures and, when required by the Engineering Director, all grading affecting stability of adjacent property, shall be performed under the supervision of an engineer registered in the State of Arizona and shall be designated "supervised grading." Grading not supervised in accordance with this section shall be designated "regular grading." (b) Regular Grading Requirements. The Engineering Director may inspect the work, and may require adequate inspection and compaction control by soils testing agency. (c) Supervised Grading Requirements. For supervised grading, it shall be the responsibility of the supervising engineer to supervise and coordinate all site inspection and testing during grading operations. Soils Reports shall also be required as specified in section 20-258. All necessary reports, compaction data, and soils engineering and engineering geological recommendations shall be submitted to the Engineering Director by the supervising Engineer. Soil reports certifying the compaction or acceptability of all fills shall be required except as exempted by Section 20-264(b). These shall include, but not be limited to, inspection of areas cleared, compacted, and otherwise prepared to receive fill; the placement and compaction of fill material; and the inspection or review of the construction of retaining walls, subdrains, drainage devices, buttress fills, and similar measures. (d) Notification of Non-Compliance. If, in the course of fulfilling his responsibility under this chapter, the supervising engineer finds that the work is not being done in conformance with this chapter or the plans approved by the Engineering Director, he shall immediately notify the person in charge of the grading work and Engineering Director in writing of the non-conformity and of the corrective measures to be taken. (Ord. No. 98-95, enacted, 8/26/98; Ord. No. 02-41, 6/7/02, amended (SUPP 2002-2))