§ 5.12.08 — Site Plan Review
Code of the City of Grand Rapids, Michigan (Supp. No. 70: codified through Ordinance No. 2026-08, enacted April 14, 2026) · Grand Rapids City Code § 5.12.08
Corpus is an independent public-information project, not the official City of Grand Rapids website. Stable reference: corpuslaw.us/code/2681e92d-d462-4117-87c3-ca7dfe905865
Sec. 5.12.08. - Site Plan Review.
A. Purpose. The purpose of the submittal is to ensure compliance with the development and design standards and requirements of this Chapter and to encourage quality development consistent with the goals of the Master Plan. A LUDS permit shall not be issued until the site plan has been approved. All projects requiring review shall submit a Site Plan Review application in accordance with this Article. B. Planning Commission Approval. A project requires Site Plan Review by the Planning Commission under any of the following circumstances. 1. Any proposed development that does not qualify for an Administrative Review under Section 5.12.16. or any project that qualifies for Administrative Review that the Director determines should be submitted for Site Plan Review by the Planning Commission. 2. Any proposed development on one (1) acre or more located in a TN-TBA, TOD, or C Zone District, where in the opinion of the Director, the site alterations would substantially change the way the site functions or operates, have the potential to adversely affect adjacent properties, decrease the compatibility of the surrounding built environment, or substantially alter the character of the neighborhood. 3. Special Land Uses in all Zone Districts. 4. Development Plans (Preliminary and Final), and Minor Deviations of an approved Development Plan, for a PRD Planned Redevelopment District. 5. Approvals and amendments of Planned Sign Programs. 6. Recommendation to the City Commission for a Final Site Plan for a Site Condominium. C. Other Approvals. 1. A Site Plan Review is not required for the following, but shall be considered a Counter Review as set forth in Section 5.12.16. a. Detached single-family dwellings; and b. Projects where interior construction does not increase gross floor area, increase the intensity of use, or effect parking requirements on a site that meets all development requirements and site design standards of this Chapter. 2. Site Condominiums. A Final Site Plan approval by the City Commission is required for a site condominium, following a recommendation by the Planning Commission. D. Application and Review Process. 1. An application shall be filed with the Planning Department, as provided in Section 5.12.04. for either a Preliminary or Final Site Plan Review. 2. Preliminary Site Plan Review. a. If desired by the applicant, a Preliminary Site Plan Review application may precede the Final Site Plan Review, in accordance with the procedures set forth in this Article. If a Preliminary Site Plan Review is elected, a Preliminary Site Plan shall be submitted for review by the Planning Commission. b. The Director may also require submission of a Preliminary Site Plan for projects that raise complex issues, including, but not limited to, the need for major infrastructure improvements and other neighborhood or community-wide effects that would benefit from a Planning Commission review. c. The purpose of the Preliminary Site Plan Review is to provide an opportunity for input at the earliest stages of the development process, and to permit the Planning Commission to inform the applicant of the general suitability of the proposed plans prior to incurring extensive engineering and other costs which might be necessary for Final Site Plan approval. d. The Director may require additional information specific to the site if deemed necessary to assist in the determination of compliance with the Review Standards of Section 5.12.08.E. e. The Planning Commission shall review the Preliminary Site Plan Review application for conformity with the requirements of this Chapter and the review standards of this Article. f. Comments from the Planning Commission do not confer upon the applicant any development approvals or other rights. 3. Final Site Plan Review. a. A Final Site Plan Review shall be required for those projects for which a Preliminary Site Plan Review has been approved and for applications meeting the requirements of Section 5.12.08.B. b. A Final Site Plan Review application may be submitted for review without first receiving approval of a Preliminary Site Plan Review under the provisions of D.2., above. c. The Planning Commission shall review the Final Site Plan Review application for conformity with the requirements of this Chapter and the review standards of this Article. d. Following approval of a Final Site Plan Review, and other approvals that may be required by this Chapter, the applicant may submit for further permits as required by this Chapter and other provisions of the City Code. 4. Optional Public Hearing. In accordance with the Zoning Act, a public hearing for a Site Plan Review is not required. A public hearing shall be held if required by the Planning Commission or Director and notices sent in accordance with Section 5.12.05.B. E. Review Standards. The following review standards shall apply for Site Plan Reviews by the Planning Commission and Director Review. Site Plan Review approval shall be granted only if the application meets all the applicable requirements of this Chapter and the following standards. 1. Master Plan/Zoning Ordinance. The proposed development will meet the purpose and intent of the Master Plan and Zoning Ordinance, including the Zone District. 2. Site Design. a. The site is designed to comply with all provisions of this Chapter. b. The site will be developed so as not to impede the normal and orderly development or improvement of surrounding property for uses permitted by this Chapter. c. Redevelopment of existing sites are brought into conformance with all site improvement provisions of this Chapter relative to and proportionate to the extent of redevelopment, as determined by the Director or Planning Commission, as applicable. d. Every building, structure or dwelling unit is provided with adequate means of ingress and egress by public streets and walkways. e. All elements of the site design are harmoniously and efficiently organized in relation to topography, the size and type of lot, character of the neighborhood and adjoining property, and the type, size, and proportions of buildings. f. All buildings or groups of buildings are arranged so as to permit access for emergency vehicles by practicable means. g. Outdoor lighting is designed so that it is deflected away from adjacent properties and does not impede the vision of drivers on public streets, adversely affect abutting properties, or unnecessarily affect the natural evening sky. 3. Environment. a. Site landscape features, such as notable mature vegetation and steep slopes, will be preserved in their natural state insofar as practicable by minimizing tree and soil removal, alteration to the natural drainage courses, and the amount of cutting, filling and grading. b. Natural features and site topography are incorporated into the proposed site design to the maximum extent practicable. c. Buildings and structures are placed in a manner that preserves and protects environmentally sensitive areas. d. Landscape buffers or greenbelts are provided that ensure that proposed uses are adequately buffered from one another and from surrounding public and private property. Special emphasis is placed on the preservation of notable vegetation that provides an effective landscape screen between properties, where desirable. e. Stormwater management measures will be employed to satisfy Chapter 32 and other City ordinances related to water quality. 4. Vehicular, Bicycle, and Pedestrian Circulation. a. Driveways are located to minimize conflict with traffic operations on abutting streets and the number of driveways is the minimum needed to provide reasonable access to the site. b. The width of streets and driveways are appropriate for the existing and anticipated volume of traffic. c. The arrangement of public or common ways for vehicular and pedestrian circulation respect the pattern of existing or planned streets and pedestrian or bicycle pathways in the area. d. Off-street parking and loading areas are provided with particular attention to the effects of noise, glare, and odor on adjacent properties in the proposed development. e. Safe, convenient and well-defined vehicular, bicycle, and pedestrian circulation within and to and from the site is provided. Driveways, streets and other elements are designed to promote safe and efficient movement within the site and at its access points. f. Pedestrian pathways connect to transit stops or stations where practicable. g. Bicycle facilities shall be planned to ensure that conflicts between cyclists, vehicles, and pedestrians are minimized to the greatest possible extent. 5. Public Facilities. The scale and design of the proposed development does not place an excessive burden on services currently furnished or may be required by the City or other public agency, including, but not limited to, fire and police protection, water supply, stormwater management, sanitary sewage removal and treatment, traffic control, and administrative services. F. Decisions. 1. The Planning Commission shall approve, approve with conditions, postpone or deny the plan, stating the reasons for its decision in the minutes. The decision of the Planning Commission cannot be appealed to the Board of Zoning Appeals. 2. Conditions imposed by the Planning Commission shall meet the standards of Section 5.12.02.B.3. The Planning Commission may refer to Section 5.2.20 Infrastructure and Service Needs for additional conditions as warranted. 3. Site Plan Review approval cannot be used to permit a building or site requirement that does not meet the requirements of this Chapter. To this end, the Commission shall not have the authority to change any part of the site plan that meets the allowable uses or Development Requirements of the Zone District, or reverse the approval of an Administrative Departure. 4. Modifications Permitted. a. For applications related to an application for approval of a shopping center or other integrated complex, as defined by this Chapter, the Planning Commission may approve modifications to the parking and sign requirements of Articles 10 and 15 respectively to accommodate design considerations such as shared parking arrangements, sign consolidation, and other similar elements. b. Modifications shall only be granted if the Commission finds that they would result in an improved design, rather than simply as a reduction in required parking or a request for larger or additional signs. 5. Effective Date. Site Plan Review approvals shall have immediate effect. Other required approvals shall have the effective date applicable to that approval. 6. Duration of Approval. a. Preliminary Site Plan. A Preliminary Site Plan approval shall be valid for a period of two (2) years. If a Final Site Plan Review application has not been submitted within the two (2) year period, the approval for the Preliminary Site Plan shall lapse and a new Preliminary or Final Site Plan Review application shall be required. b. Final Site Plan. A Final Site Plan Review approval shall be valid for a period of one (1) year, in which time a LUDS and/or building permit shall be obtained and the first phase of construction substantially commenced. c. Extension. Upon written request prior to expiration of the approval, two (2) extensions of up to six (6) months may be granted for a Final Site Plan Review approval if the Planning Commission finds that the extension is warranted due to circumstances beyond the control of the applicant. d. Expiration. If no action is taken to initiate substantial construction after the expiration of the initial approval period or extension, the Final Site Plan Review approval shall expire when applicable LUDS and/or building permits expire and a new approval shall be required. G. Minor Amendments. Any proposed changes by the holder of an approved Final Site Plan shall be submitted to the Director, including documentation detailing the conditions necessitating the changes. 1. The Director may approve minor amendments that do not alter the basic design nor any specific conditions imposed as part of the original approval, including the following. a. Change in the building size, up to ten (10) percent in total floor area. b. Movement of buildings or other structures by not more than ten (10) feet. c. Replacement of plant material specified in the landscape plan with comparable materials of an equal or greater size and/or number. d. Changes in building materials or colors that are similar to and have the same general appearance to, or of a comparable or higher quality than, the previously approved material. e. Adjustments to the location and layout of parking lots, provided the perimeter setbacks, yards and buffers, and required parking are maintained. f. Sign modifications to location, sign face, landscaping and lighting, provided the general sign design, number of signs, and dimensional requirements are maintained. g. Relocating fencing, walls, or screening (not including screening walls), provided that the same level and quality of materials and screening are maintained. h. Changes in floor plans that do not alter the character of the use. i. Changes required by outside agencies such as the county, state, or federal officials or agencies of competent jurisdiction. j. Other minor modifications deemed appropriate by the Director that do not alter the basic design or any specific conditions imposed as part of the original approval. 2. If the Director determines a proposed amendment is not minor, the proposed amendment shall be submitted as a new application and reviewed in accordance with the requirements of this Article. H. Project Phasing. 1. Phasing Plan. Requests for project phasing shall be approved by the Planning Commission as part of the Site Plan Review. The phasing plan shall include the likely sequence and timeline for construction, as well as the reasoning behind the phased approach. 2. Contiguous Sequencing. Project phasing shall be sequenced so that development phases are contiguous, and that each phase has the potential to stand on its own in the event future phases are not constructed. 3. Lapse. The time period for the lapse of a construction phase shall not exceed twelve (12) months from the issuance of a Certificate of Occupancy. 4. Traditional Neighborhood Zoning Classification. a. Where two (2) or more structures are proposed on the same site within a Traditional Neighborhood classification, the first structure to be built shall be located along the primary public street, abutting the public right-of-way (front structure). b. The linear building frontage of the structure located along the primary public street shall be at least equal to the linear building frontage of the largest structure(s) to be constructed in subsequent phases.
(Ord. No. 2022-30, § 4, 8-23-22)
Ask a question about Grand Rapids law
Corpus searches the Grand Rapids sections it holds and shows the ones that match, with their citations. Free, no sign-in.
