Maintenance and inspection of structural control features.
Round Rock Code of Ordinances § 14-146.1
in effectSec. 14-146.1. - Maintenance and inspection of structural control features.
(a) Part III, Section B.4(c) of the TPDES permit requires the city to develop and implement an inspection program to ensure that all post-construction control measures are operating correctly and are being maintained as required.
(b) The owners of structural controls are required to develop and implement a maintenance plan addressing requirements to ensure that the structural controls are operating correctly. The maintenance plan must be filed with the city and filed in the real property records of the county in which the structural control measures are located.
(c) The owners of structural controls that were completed on or before September 1, 2023 are required to have the structural controls inspected before September 1, 2026. Thereafter, these owners are required to have the structural controls inspected on or before the third anniversary of the date of the immediately preceding inspection report.
(d) The owners of structural controls that are completed after September 1, 2023, are required to have the structural controls inspected on or before three years following the construction completion date. Thereafter, these owners are required to have the structural controls inspected on or before the third anniversary of the date of the immediately preceding inspection report.
(e) At least once every three years, the owners of structural controls are required to have the structural controls inspected by an engineer licensed in Texas. The first such inspection shall occur on or before the third anniversary of the completion of the construction of the structural control measures, and every third year thereafter. The owner shall file the engineer's report with the city for its review and approval.
(f) At a minimum, the engineer's report shall include the following:
(1) A history of maintenance activities on the structural control measures during the previous three years;
(2) An assessment of the condition of the structural control measures;
(3) The engineer's professional opinion related to the functionality of the structural control measures, and its ability to control quantity and/or quality of runoff in accordance with its original design; and
(4) The engineer's recommendations, if any, for remediation or maintenance of the structural control measure to meet the original design specifications.
(g) City staff will review the engineer's report to determine if it is in compliance with this section and if the structural controls are operating correctly and being maintained as required. If so, the city staff will approve the engineer's report.
(h) If the city staff determines that the engineer's report is not in compliance with this section, and/or that the structural control measures are not operating correctly, then the city staff shall disapprove the engineer's report. In that event, no later than ninety days following said disapproval, the owner shall have the structural control measures reinspected and cause a new engineer's report to be filed with the city.
(Ord. No. O-2023-244, § II, 8-24-2023)
Source: City of Round Rock, Texas, Code of Ordinances (Municode Library, library.municode.com)URL: https://library.municode.com/tx/round_rock/codes/code_of_ordinances?nodeId=PTIICOOR_CH14EN_ARTVIILDIPOINMSCO_S14-146.1MAINSTCOFEFetched: 11/16/2026