Sec. 114-119. - Extension of facilities for development.

Extension of facilities to any development shall be in accordance with the following requirements: (1) Extension of facilities for new developments shall be the sole expense and responsibility of the owner/developer, unless otherwise specified herein. (2) All plans for new extensions or connections for facilities shall be reviewed and approved by the office of the city engineer prior to the commencement of any work. (3) Any and all work associated with extending facility infrastructure shall be inspected and tested by personnel from either city engineer's office or the water division. No facilities will be accepted as public infrastructure until the city engineer's office approves all work. (4) Individual meter connections to residential or commercial lots or units as part of a facilities extension are the sole responsibility of the owner/developer. City forces will set meters as needed per the approved "Schedule of Fees". Connections shall be made in accordance with the typical service connection detail provided by the city. (5) Individual meter connections to existing residential or commercial lots or units up to two inches shall be made by city forces in accordance with the approved "Schedule of Fees". (6) Private developments requiring master metered connections to city facilities shall be in accordance with the following: a. Installation of the meter vault, meter and bypass piping shall be the sole responsibility of the owner/developer. All of the work will be inspected and tested by personnel from either city engineer's office or the water division. No facilities will be accepted as public infrastructure until the city engineer's office approves all work. b. The owner/developer shall be required to perform all work necessary to connect the master meter to existing city infrastructure with the exception of the wet tap. The wet tap will be made by city forces after the owner/developer has paid the appropriate fee in accordance with the approved "Schedule of Fees".

(Code 1968, § 31-61; Ord. No. 1981-27, § 3, 11-3-1981; Ord. No. 1994-11, § 2, 9-6-1994; Ord. No. 2025-16, § I, 1-6-2026)