For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 42-245 — General performance criteria for stormwater management

Code of Ordinances, City of Olive Branch, Mississippi (Supp. No. 14: codified through Ordinance of June 17, 2025) · Olive Branch Code of Ordinances § 42-245

Corpus is an independent public-information project, not the official City of Olive Branch website. Stable reference: corpuslaw.us/code/27736c6c-3ea6-4676-a90e-9a7c733f568a

Sec. 42-245. - General performance criteria for stormwater management.

Unless judged by the AEA to be exempt or granted a waiver, the following performance criteria shall be addressed for stormwater management at all Sites: (1) All site designs shall establish stormwater management practices to control the peak flow rates of stormwater discharge associated with specified design storms and reduce the generation of stormwater. These practices should seek to utilize pervious areas for stormwater treatment and to infiltrate stormwater runoff from driveways, sidewalks, rooftops, parking lots, and landscaped areas to the maximum extent practical to provide treatment for both water quality and quantity. (2) Annual groundwater recharge rates shall be maintained, by promoting infiltration through the use of structural and non-structural methods. At a minimum, annual recharge from the post development site shall mimic the annual recharge from predevelopment site conditions. (3) To protect stream channels from degradation, a specific channel protection criteria shall be provided as prescribed in the stormwater design manual. (4) Stormwater discharges to critical areas with sensitive resources (i.e., swimming beaches, recharge areas, water supply reservoirs) may be subject to additional performance criteria, or may need to utilize or restrict certain stormwater management practices. (5) Certain industrial sites are required to prepare and implement a stormwater pollution prevention plan (SWPPP), and shall file a Notice of Intent (NOI) under the provisions of the National Pollutant Discharge Elimination System (NPDES) general permit. The SWPPP requirement applies to both existing and new industrial sites. (6) Stormwater discharges from land uses or activities with higher potential pollutant loadings, known as contaminated properties, may require the use of specific structural STPs and pollution prevention practices. (7) Prior to design, applicants are required to consult with the AEA to determine if they are subject to additional stormwater design requirements. (8) The calculations for determining peak flows as found in the Stormwater Design Manual shall be used for sizing all stormwater management practices.

(Ord. of 1-21-2020(1))

Ask a question about Olive Branch law

Corpus searches the Olive Branch sections it holds and shows the ones that match, with their citations. Free, no sign-in.