For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 22-77 — General standards for all zones

Code of Ordinances, City of Hattiesburg, Mississippi (Supp. No. 3: codified through Ordinance No. 3388, enacted September 16, 2025) · Hattiesburg Code of Ordinances § 22-77

Corpus is an independent public-information project, not the official City of Hattiesburg website. Stable reference: corpuslaw.us/code/2835ebb1-da15-486f-850f-9e5f89fcbdd9

Sec. 22-77. - General standards for all zones.

In all areas of special flood hazard the following provisions are required: (1) New construction and substantial improvements shall be anchored to prevent flotation, collapse and lateral movement of the structure. (2) Manufactured homes shall be anchored to prevent flotation, collapse, and lateral movement. Methods of anchoring may include, but are not limited to, use of over-the-top or frame ties to ground anchors. Dry stacked blocks (stacked without the use of mortar or cement to bond them together) are not to be used as an anchor/elevation method. This standard shall be in addition to and consistent with applicable state requirements for resisting wind forces. (3) New construction and substantial improvements shall be constructed with materials and utility equipment resistant to flood damage. (4) New construction or substantial improvements shall be constructed by methods and practices that minimize flood damage. (5) Electrical, heating, ventilation, plumbing, air conditioning equipment and other service facilities shall be designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding, such facilities shall be located a minimum one foot above the base flood elevation. (6) New and replacement water supply systems shall be designed to minimize or eliminate infiltration of floodwaters into the system. (7) New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of floodwaters into the systems and discharges from the systems into floodwaters. (8) On-site waste disposal systems shall be located and constructed to avoid impairment to them or contamination from them during flooding. (9) Any alteration, repair, reconstruction or improvements to a building that is in compliance with the provisions of this article shall meet the requirements of new construction as contained in this article. (10) Any alteration, repair, reconstruction or improvements to a building that is not in compliance with the provisions of this article shall be undertaken only if said nonconformity shall meet the requirements of new construction as contained in this article. (11) All gas and liquid storage tanks (both above and below ground) shall be adequately anchored to prevent floatation, lateral movement resulting from hydrodynamic forces, and the effects of buoyancy. (12) When new construction and substantial improvements are located in multiple flood zones or in a flood zone with multiple base flood elevations, they shall meet the requirement for the more stringent flood zone and the highest base flood elevation. (13) Require that all manufactured homes be placed or installed using methods and practices which minimize flood damage. Manufactured homes must be elevated and anchored to resist flotation, collapse, or lateral movement. Dry stacked blocks (stacked without the use of mortar or cement to bond them together) are not allowed within the special flood hazard area. (14) New construction and substantial improvement of any building inside the SFHA shall have the lowest floor (including basement) at least one foot above the centerline of the designated street, unless the topography of the property does not allow for strict adherence as determined by the floodplain administrator. Areas outside the SFHA shall be elevated in accordance with section 22-78(2). (15) All new horizontal additions must have the lowest floor and all HVAC, including ductwork, elevated to the regulatory freeboard. (16) Storage or processing of materials that are hazardous, flammable, explosive, or in time of flooding could become buoyant and pose an obstruction to flow, are prohibited within the community special flood hazard areas, to include identified floodways. Storage of material or equipment not otherwise prohibited shall be firmly anchored to prevent flotation. (17) New construction and substantial improvements of structures built on fill shall be constructed on properly designed and compacted fill that extends ten feet to 15 feet beyond the building walls before dropping below the base flood elevation, and shall have appropriate protection from erosion and scour as follows: a. Fill sites, upon which structures will be constructed or placed, must be compacted to 95 percent of the maximum density obtainable with the Standard Proctor Test method or an acceptable equivalent method. b. Fill slopes shall be no steeper than one foot vertical to two feet horizontal. c. Adequate protection against erosion must be provided for fill slopes. When expected velocities during the occurrence of the base flood are greater than five feet per second, armoring with stone or rock protection or material that will provide equivalent resistance will be provided. When expected velocities during the base flood are five feet per second, appropriate protection shall be provided by covering them with vegetative cover at a minimum. d. Fill shall be composed of clean granular or earthen material. (18) Any proposed development that includes a lake, dam and/or reservoir, whether inside or outside of a SFHA or on an individual lot or in a new subdivision, shall: a. Obtain all state and/or federal permits (i.e., dam safety construction permit, surface water impoundment permit, 404 permit, etc.) which may be required in connection with the proposed work prior to local permitting. Documentation shall include the designation of the type of dam or reservoir as high, significant or low hazard. A letter from the Mississippi Dam Safety Program will be acceptable documentation should no permitting be required. b. Utilize cluster development or similar development pattern to ensure that no structures built within the development are located within the dam inundation area, with deed restrictions recorded in tax records to ensure this area is not developed in the future for the protection of life and properties should the dam breach or fail. c. Designate the entire inundation area on site and building plans, including any areas outside the proposed new development areas that fall within the inundation area. d. A dam failure warning and response plan that describes the following: 1. A general description of the dam, including its distance upstream from the community; 2. Threat recognition system for primary and any secondary (backup) threat recognition procedures, and how and when the operator of the dam will notify the local emergency managers of a potential or actual dam breach; 3. Procedures for quarterly testing of all equipment and material needed for the system, including how and when the quarterly communication checks between the operator of the dam and emergency service officials will be documented; 4. An evacuation plan and corresponding map; 5. An inventory of all property exposed to dam failure flooding, including, but not limited to: (i) Types of buildings (residential, commercial, critical facility, etc.); (ii) Count (number per buildings per type); (iii) Land use (agricultural, open space, residential, etc.); (iv) Developed and undeveloped area within the dam failure inundation area; (v) List of any critical facilities that would be affected; (vi) The expected impacts of dam failure flooding on health, safety, community functions (police, fire and utility services) and potential for secondary hazards; and (vii) Documentation as to how the numbers of buildings used in the calculations were determined. e. A mandatory annual exercise or drill, with all actions taken, will be required in lieu of a response to an actual emergency or disaster during the previous year, with after-action report including lessons learned. f. Prior to permitting, the developer/owner will assist the city with development of a dam failure response operations that describes: 1. The actions to be taken and implemented when the dam failure flood threatens or occurs; 2. Identifying a responsible person for each action; 3. Defining the time needed to carry out the action activity; 4. Designating what actions are conducted by owner, emergency services, the community or others; 5. Any other information that specified agencies and organizations need in order to perform their assigned responsibilities; 6. Notification to all owners of existing structures that fall within the mapped inundation area of the potential danger; 7. A data base of people with special needs who require evacuation assistance when a dam failure warning is issued with a plan to provide transportation to secure locations, and of all public and private critical facilities or services that could be affected by a dam failure or that the loss of access would cause a critical situation, including contact persons and arrangements for special warnings and early notifications directly to those that may need advance warning; and 8. Each action item must include a list of the personnel, equipment, facilities, supplies and other resources needed to complete each task; and the source of the resource (owner/developer, community, other jurisdictions or private supplier).

(Ord. No. 3294, § 1(art. 5, § A), 9-7-2021)

Ask a question about Hattiesburg law

Corpus searches the Hattiesburg sections it holds and shows the ones that match, with their citations. Free, no sign-in.