For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 120-7 — Control of Storm Water Discharge

Milwaukee Code of Ordinances (Volumes 1-3 revised through Common Council action of Sept. 22, 2026) · Milwaukee Code of Ordinances § 120-7

Corpus is an independent public-information project, not the official City of Milwaukee website. Stable reference: corpuslaw.us/code/283aa047-d902-4d14-a0a5-5d73659b0039

120-7. Control of Storm Water Discharge.

1. APPLICABILITY. No person shall proceed with any residential, commercial, industrial or institutional improvement or subdivision of property without having provided for appropriate storm water measures that control or manage runoff from such development or redevelopment or future development of the subdivided property. A storm water management plan addressing storm water runoff quality control, quantity control or both must be submitted and approved pursuant to sub. 2 or waived pursuant to sub 4. A plan is required: a. Before an existing drainage system is altered, rerouted, deepened, widened, enlarged, filled or obstructed in preparation for improvement. b. Before or concurrent with the submittal and approval of an erosion and sediment control plan as specified in ch. 290. c. Before the development or redevelopment is permitted for commencement of construction. 1.5 MILWAUKEE RIVER GREENWAY SITE PLAN REVIEW OVERLAY ZONE. This section shall not apply to any property located within the Milwaukee River greenway site plan review overlay zone, as shown on the city zoning map and established by common council file number 081568. Properties in the overlay zone shall be subject to the storm water management regulations of s. 120-14. 2. DEVELOPMENT CRITERIA. A storm water management plan is required if any of the following criteria are met: a. The development or redevelopment causes a land disturbing activity of one acre or more. b. The development or redevelopment causes the cumulative area of all land disturbing activities at a property to be one acre or more over a 3-year period. c. The development or redevelopment occurring causes an increase of 0.5 acres or more of impervious area. d. The construction or reconstruction of a public road will increase impervious surface by one-half acre or more. 3. EXEMPTIONS. The following activities are exempt from the storm water management plan requirements: a. Agricultural activities not associated with development. b. Maintenance, alteration, use or improvement to an existing structure or construction activity which does not significantly change or affect the water quality and hydrologic conditions of the surface water discharge which has a previously approved storm water management plan. c. Maintenance activities undertaken by any municipal, state or federal governmental agency. d. Storm water management measures to be undertaken by the city on an outfall in a specified watershed, when the city engineer has determined that the person need not prepare a storm water management plan. e. Reconstruction of public roads when the area of impervious surface is not changing. f. Pavement maintenance activities, such as sealing, milling and overlaying, or pulverizing. 4. WAIVERS. a. Requests to waive the storm water management plan requirements shall be submitted to the city engineer for approval. b. The person shall also submit a narrative description and drawings of the proposed development or improvement. The city engineer may request other information that is reasonably necessary to evaluate the waiver. c. The city engineer shall coordinate a review by city agencies and may grant a waiver if the development is primarily a storm water reduction or green infrastructure project and will not: c-1. Increase the rate or volume of storm water runoff. c-2. Have an adverse impact on a wetland, watercourse or receiving body of water. c-3. Contribute to the degradation of water quality. c-4. Otherwise impair attainment of the objectives of this chapter. 4.5. PEAK RUNOFF RELEASE RATE CALCULATIONS. a. Peak runoff release rates shall be calculated using NOAA Atlas 14 precipitation depths and NRCS MSE3 precipitation distribution. b. Refer to s. NR 151.123(1), Wis. Adm. Code, for maximum predevelopment runoff curve numbers for developments that include but are not limited to areas like new subdivisions and undeveloped urban areas. 5. RUNOFF RELEASE RATE. a. If the development or redevelopment occurring causes an increase of 0.5 acres or more of impervious area, the release rate and requirements shall be governed by Milwaukee metropolitan sewerage district chapter 13 - surface water and storm water rules. b. If the development or redevelopment occurring is subject to the requirements of sub. 2 and does not cause an increase of 0.5 acres or more of impervious area, the peak runoff flow rates under post-development conditions shall be at least 10% less than the peak runoff rates under pre-development conditions during 2-year and 100-year, 24-hour storm events. c. If demolition or construction during redevelopment will disturb an area between 3.5 and 5 acres, then the runoff release rate shall be reduced by 15%. d. If demolition or construction during redevelopment will disturb an area exceeding 5 acres, then the runoff release rate shall be reduced by 20%. 6. RUNOFF DISCHARGE QUALITY CONTROL. a. Runoff quality shall meet or exceed the following criteria: a-1. For new development, by design, reduce to the maximum extent practicable, the total suspended solids load by 80%, based on an average annual rainfall, as compared to no runoff management controls. No person shall be required to exceed an 80% total suspended solids reduction to meet the requirements of this paragraph. a-2. For redevelopment, by design, reduce to the maximum extent practicable, the total suspended solids load by 40%, based on an average annual rainfall, as compared to no runoff management controls. No person shall be required to exceed a 40% total suspended solids reduction to meet the requirements of this paragraph. a-3. For in-fill development under 5 acres that occurs within 10 years after October 1, 2002, by design, reduce to the maximum extent practicable, the total suspended solids load by 40%, based on an average annual rainfall, as compared to no runoff management controls. No person shall be required to exceed a 40% total suspended solids reduction to meet the requirements of this paragraph. a-4. For in-fill development under 5 acres that occurs 10 or more years after October 1, 2002, by design, reduce to the maximum extent practicable, the total suspended solids load by 80%, based on an average annual rainfall, as compared to no runoff management controls. No person shall be required to exceed an 80% total suspended solids reduction to meet the requirements of this paragraph. a-5. Any other regulatory agency requirements specific to the discharge produced by the development. b. Applicability. This subsection applies to whenever a storm water management plan is required in the separate storm sewer system or if storm water runoff from the development or redevelopment is subject to the requirements of sub. 2 and storm water runoff from that development or redevelopment discharges into waters of the state. 6.5. GREEN INFRASTRUCTURE REQUIRED. a. If a stormwater management plan is required under sub. 2 and is not waived under sub. 4, then the development or redevelopment shall include green infrastructure with a detention volume equal to at least one-half inch multiplied by the total area of new or redeveloped impervious surface. A green infrastructure plan required under this paragraph shall be submitted and approved as part of the stormwater management plan. b. A green infrastructure plan required under par. a shall include: b-1. A description of the project and the dimensions of the new impervious surface. b-2. A description of the proposed green infrastructure and the dimensions of the green infrastructure. b-3. One or more drawings showing the new impervious surface and the green infrastructure. b-4. Calculations showing the detention volume needed and the detention volume provided by the proposed green infrastructure. b-5. If applicable, a description of any conditions that support a reduction in green infrastructure implementation to a maximum extent practicable according to s. 120-4, and a description of any suggested alternate green infrastructure arrangement. Any reduction in or alternate green infrastructure arrangement must be approved by the city engineer. b-6. An annual maintenance plan for the proposed green infrastructure. c. A green infrastructure plan shall determine the detention volume provided by the proposed green infrastructure through project-specific modeling, a calculating tool identified by the department or a schedule of green infrastructure detention volume estimates according to type made available by the department. 7. MAINTENANCE OF EFFORT. For a redevelopment site where the redevelopment will be replacing an older development that was subject to s. 120-7, the responsible party shall meet the total suspended solids reduction and peak flow control standards applicable to the older development or meet the redevelopment standards of this chapter, whichever is more stringent. 8. MAXIMUM EXTENT PRACTIC-ABLE. If a design cannot meet the total suspended solids reduction performance standard of sub. 6, the storm water management plan shall include a written, site-specific explanation of why the total suspended solids reduction performance standard cannot be met and why the total suspended solids load will be reduced only to the maximum extent practicable. 9. INTENT TO PROCEED. The department of public works shall be notified 3 working days before any work is commenced on the site. The contact phone number shall be listed in the storm water management plan.

Ask a question about Milwaukee law

Corpus searches the Milwaukee sections it holds and shows the ones that match, with their citations. Free, no sign-in.