For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 55-147 — Affirmative defenses to discharge violations of federal categorical pretreatment standards and local limits

Code of Ordinances, City of Corpus Christi, Texas (Supp. No. 44: codified through Ordinance No. 033940, enacted June 2, 2026) · Corpus Christi Code of Ordinances § 55-147

Corpus is an independent public-information project, not the official City of Corpus Christi website. Stable reference: corpuslaw.us/code/286f8a00-99ec-4419-8fac-42737fed6634

Sec. 55-147. - Affirmative defenses to discharge violations of federal categorical pretreatment standards and local limits.

(a) Act of God. If a person can establish that an event that would otherwise be a violation of this article, a wastewater permit, a directive issued under this article, or any pretreatment standard or requirement was caused solely by an act of God, war, strike, riot, or other catastrophe, the event is not a violation of this article, a wastewater permit, a directive issued under this article, or any pretreatment standard or requirement. (b) Affirmative defenses to other general and specific prohibitions. An industrial user shall have an affirmative defense to an enforcement action brought against it for noncompliance with the general and specific prohibitions in subsection 55-141(a) of this article if it can prove that it did not know or have reason to know that its discharge, along or in conjunction with discharges from other sources, would cause pass through or interference and that either: (1) A local limit exists for each pollutant discharged and the industrial user was in compliance with each limit directly prior to, and during, the pass through or interference, or (2) No local limit exists, but the discharge did not change substantially in nature or constituents from the user's prior discharge when the city was regularly in compliance with its TPDES permit, and in the case of interference, was in compliance with applicable sludge use or disposal requirements. (c) Bypass. (1) Definitions. a. Bypass means the intentional diversion of wastestreams from any portion of an industrial user's treatment facility. b. Severe property damage means substantial physical damage to property, damage to the treatment facilities which causes them to become inoperable, or substantial and permanent loss of natural resources which can reasonably be expected to occur in the presence of a bypass. Severe property damage does not mean economic loss caused by delays in production. (2) An industrial user may allow any bypass to occur which does not cause pretreatment standards or requirements to be violated, but only if it also is for essential maintenance to assure efficient operation. These bypasses are not subject to the provisions of subsection (c)(3) and subsection (c)(4). (3) a. If an industrial user knows in advance of the need for a bypass, it shall submit prior notice to the POTW, at least ten (10) days before the date of the bypass if possible. b. An industrial user shall submit oral notice of an unanticipated bypass that exceeds applicable pretreatment standards to the POTW within twenty-four (24) hours from the time it becomes aware of the bypass. A written submission shall also be provided within five (5) days of the time the industrial user becomes aware of the bypass. The written submission shall contain a description of the bypass and its cause; the duration of the bypass, including exact dates and times, and, if the bypass has not been corrected, the anticipated time it is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the bypass. The director may waive the written report on a case-by-case basis if the oral report has been received within twenty-four (24) hours. (4) a. Bypass is prohibited, and the POTW may take enforcement action against an industrial user for a bypass, unless: b. Bypass was unavoidable to prevent loss of life, personal injury, or severe property damage; c. There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime. This condition is not satisfied if adequate back-up equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass which occurred during normal periods of equipment downtime or preventive maintenance; and d. The industrial user submitted notices as required under subsection (c)(3) of this section. (5) The director may approve an anticipated bypass, after considering its adverse effects, if the director determines that it will meet the three (3) conditions listed in subsection (c)(4)a.

(Ord. No. 21666, § 1, 6-1-1993; Ord. No. 24793, § 1, 3-5-2002; Ord. No. 25377, § 12, 7-22-2003; Ord. No. 032342, § 1, 2-9-2021)

Ask a question about Corpus Christi law

Corpus searches the Corpus Christi sections it holds and shows the ones that match, with their citations. Free, no sign-in.