Sec. 5.3.03. - Nonconforming Buildings or Structures.
A. Continuation. A nonconforming building or structure may be continued so long as it remains otherwise lawful, subject to the provisions of this Section. B. Extensions and Expansion. 1. No nonconforming building or structure may be enlarged or altered in a way that increases its nonconformity, except as noted in subsection B.2. below. 2. A nonconforming building or structure may be extended along the portion of the building that is nonconforming provided the following conditions are met: a. The existing building or structure must meet at least one-half (½) of the required setback or Required Building Line (RBL) of the Zone District. b. The extension of the nonconforming setback or RBL of a building or structure shall not be greater than fifty (50) percent of the total length of the existing building side that is to be extended. c. Additions to an existing building which is nonconforming by reason of the building height shall be permitted, provided the addition is no higher than the existing building and has a setback from all property lines that is equal to the height of the new addition. d. All parking requirements are met related to the expanded area. C. Reconstruction or Movement. 1. Reconstruction. a. Should a nonconforming building or structure be destroyed to an extent of more than seventy-five (75) percent of its replacement cost, exclusive of the foundation, it shall be reconstructed only in conformance with the provisions of this Chapter. b. Should a nonconforming building or structure be destroyed to an amount equal to or less than seventy-five (75) percent of its estimated replacement cost, exclusive of the foundation, it may be reconstructed in its previously nonconforming location. c. Replacement costs shall be provided by the owner using estimates from at least two (2) contractors in the business of undertaking this work. 2. Movement. a. Should a nonconforming building or structure be moved to a different lot, it shall be moved to a location that complies with the requirements of this Chapter. b. If moved on the same lot, the location shall comply with the requirements of this Chapter unless an Administrative Departure is approved for a location that brings it closer to conformity with the Zone District.
Ask a question about Grand Rapids law
Corpus searches the Grand Rapids sections it holds and shows the ones that match, with their citations. Free, no sign-in.