§ 33.851.300 — Approval Criteria
Portland City Code (non-zoning titles; Title 33 separately); partial · Portland Zoning Code § 33.851.300
Corpus is an independent public-information project, not the official City of Portland website. Stable reference: corpuslaw.us/code/2a21e032-456c-41fe-8f64-468f4fbd51a7
33.851.300 Approval Criteria
Requests for a South Waterfront greenway review will be approved if the review body finds that the applicant has shown that all of the following approval criteria are met: A. Consistent with the purpose of the South Waterfront greenway. The following approval criteria must be met for all proposals: 1. When compared to the development required by the standards of 33.510.253, the proposal will better enhance the natural, scenic, historical, economic, and recreational qualities of the greenway; 2. When compared to the development required by the standards of 33.510.253, the proposal will better ensure a clean and healthy river for fish, wildlife, and people; 3. When compared to the development required by the standards of 33.510.253, the proposal will better embrace the river as Portland’s front yard; and 4. When compared to the development required by the standards of 33.510.253, the proposal will better provide for stormwater management. B. Development riverward of top of bank. If development is proposed riverward of top of bank, the following approval criteria must be met: 1. The riverbank will be protected from wave and wake damage; and 2. The proposal will not: a. Result in the significant loss of biological productivity in the river; b. Restrict boat access to adjacent properties; c. Interfere with the commercial navigational use of the river, including transiting, turning, passing, and berthing movements; d. Interfere with fishing use of the river; e. Significantly add to recreational boating congestion; and f. Significantly interfere with beaches that are open to the public. C. Proposals that do not meet the requirements of 33.510.253.E. If the proposal does not meet all of the applicable standards of Subsection 33.510.253.E., the following approval criteria must be met: 1. The proposal will restore and enhance the natural character of the area adjacent to the river and will allow more significant creation of habitat for fish and wildlife that could aid in supporting the recovery of native species of fish; and 2. The proposal will support or enhance the function of the greenway area as an active and vibrant waterfront and will provide sufficient opportunities for human interaction with the greenway. D. Buildings within the South Waterfront greenway setback area. If the proposal includes buildings that do not meet all of the applicable standards of 33.510.253.E.5.c, at least one of the following approval criteria must be met: 1. The proposal will increase the area available for riparian plant communities on the site by regrading within the greenway setback area to decrease the slope of the river bank (i.e., laying back the bank). Proposals meeting this approval criteria must show that the modified slope of the bank will be no steeper than 5:1, and that buildings will be set back at least 100 feet from ordinary high water and at least 30 feet from the modified top of bank; 2. The proposal will compensate for the reduction in setback through near shore and bank treatments that mimic the conditions found in more natural areas of the Lower Willamette River. Proposals meeting this approval criterion must demonstrate the following: a. Buildings will be set back at least 75 feet from the top of bank; b. The near shore and bank treatments will be installed riverward of top of bank; c. The near shore and bank treatments will provide resource enhancement, reestablish multiple riparian functional values, increase near shore or bank complexity, and be appropriate to the specific conditions of the site and the river. The complexity should be able to be maintained over time by natural river processes; and d. The proposal includes near shore and bank treatments that are valued at 700 dollars or more per linear foot of river facing site frontage. 3. The proposal will set all buildings back an average of 100 feet from top of bank; proposals meeting this approval criteria must show that buildings will be set back at least 75 feet from top of bank, that at least 50 percent of the length of all building walls facing the South Waterfront greenway setback area will be set back at least 125 feet from top of bank, and that averaging will better enhance the recreational and ecological functions of the greenway setback area; or 4. The proposal meets all of the requirements of the South Waterfront Greenway Development Plan and a modified setback distance has been identified on the site by the City as part of the plan. E. Trails, viewpoints, and pedestrian connections. If the proposal will include trails, viewpoints, or pedestrian connections that do not meet the standards of Subsection 33.510.253.E.5.e.or f. the proposal must meet approval criteria E.1. and E.2., and either E.3. or E.4.: 1. The proposed trail, viewpoints, and pedestrian connections will safely accommodate expected users; 2. The trail will include one or two paths and the width of the proposed trail, or the combined width of the paths that make up the trail, will be at least 18 feet; and 3. The proposed trail, viewpoints, and pedestrian connections will respond to topographic constraints of the site; or 4. The proposal meets all of the requirements of the South Waterfront Greenway Development Plan and the proposed trail, viewpoints, and pedestrian connections comply with those identified on the site as part of the plan. F. Landscaping and non-landscaped area. If the proposal will include landscaping or non- landscaped area that does not meet the standards of Subsection 33.510.253.E.5.b.or 5.g., the proposal must meet either approval criteria F.1. or F.2.: 1. The proposal will mitigate for any reductions in vegetative cover through the use of methods including near shore and bank restoration work, bioengineering, or green building technologies, including innovative stormwater management, on the site; or 2. The proposal meets one of the following: a. The proposal will better support the water quality goals of the City’s Stormwater Management Manual; b. The landscaping standards cannot be met on the site because of existing bank and soil conditions such as the presence of riprap or other obstructions; c. The proposal is necessary to ensure bank stability; or d. The proposal will allow greater visual access between the trail and other segments of the greenway, and will enhance safety for trail users. (Added by: Ord. No. 177082, effective 1/20/03; Amended by: Ord. No. 178425, effective 5/20/04; Ord. No. 183518, effective 03/05/10; Ord. No. 191477, effective 3/1/24.) The City of Portland is committed to providing meaningful access. To request translation, interpretation, modifications, accommodations, or other auxiliary aids or services, contact 311, Relay: 711. 503-823-4000: Traducción e Interpretación | Biên Dịch và Thông Dịch | अनुवादन तथा व्य ाख्या 口笔译服务 | Устный и письменный перевод | Turjumaad iyo Fasiraad Письмовий і усний переклад | Traducere și interpretariat | Chiaku me Awewen Kapas www.portland.gov/bps/accommodation
Ask a question about Portland law
Corpus searches the Portland sections it holds and shows the ones that match, with their citations. Free, no sign-in.
