For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 118-208 — Industrial user discharge permit issuance

Code of the City of Charleston, West Virginia (Supp. No. 56: codified through Bill No. 8069, enacted March 16, 2026) · Charleston, W. Va., City Code § 118-208

Corpus is an independent public-information project, not the official City of Charleston website. Stable reference: corpuslaw.us/code/2a67ef6d-9013-480e-8c32-7d1569cc181a

Sec. 118-208. - Industrial user discharge permit issuance.

(a) Industrial user discharge permit duration. An industrial user discharge permit shall be issued for a specified time period, not to exceed five years from the effective date of the permit. An industrial user discharge permit may be issued for a period less than five years, at the discretion of the board. Each industrial user discharge permit will indicate a specific date upon which it will expire. (b) Industrial user discharge permit contents. An industrial user discharge permit shall include such conditions as are deemed reasonably necessary by the general manager to prevent pass through or interference, protect the quality of the waterbody receiving the POTW's effluent, protect worker health and safety, facilitate sludge management and disposal, protect ambient air, and protect against damage to the POTW. (1) Industrial user discharge permits must contain: a. A statement that indicates the industrial user discharge permit issuance date, expiration date and effective date. b. A statement that the industrial user discharge permit is nontransferable without prior notification to the board in accordance with section 118-208(f) of this division, and provisions for furnishing the new owner or operator with a copy of the existing industrial user discharge permit. c. Effluent limits, including BMPs, based on applicable pretreatment standards. d. Self monitoring, sampling, reporting, notification, and record-keeping requirements. These requirements shall include an identification of pollutants (or BMPs) to be monitored, sampling location, sampling frequency, and sample type based on federal, state, and local law. e. A statement of applicable civil and criminal penalties for violation of pretreatment standards and requirements, and any applicable compliance schedule. Such schedule may not extend the time for compliance beyond that required by applicable federal, state, or local law. f. Requirements to control slug discharge, if determined by the board to be necessary. (2) Industrial user discharge permits may contain, but need not be limited to, the following conditions: a. Limits on the average and/or maximum rate of discharge, time of discharge, and/or requirements for flow regulation and equalization; b. Requirements for the installation of pretreatment technology, pollution control, or construction of appropriate containment devices, designed to reduce, eliminate, or prevent the introduction of pollutants into the POTW; c. Requirements for the development and implementation of spill control plans or other special conditions including management practices necessary to adequately prevent accidental, unanticipated, or nonroutine discharges; d. Development and implementation of waste minimization plans to reduce the amount of pollutants discharged to the POTW; e. The unit charge or schedule of user charges and fees for the management of the wastewater discharged to the POTW; f. Requirements for installation and maintenance of inspection and sampling facilities and equipment, including flow measurement devices; g. A statement that compliance with the industrial user discharge permit does not relieve the permittee of responsibility for compliance with all applicable federal and state pretreatment standards, including those which become effective during the term of the industrial user discharge permit; h. Other conditions as deemed appropriate by the general manager to ensure compliance with this division, and state and federal laws, rules, and regulations; i. Limits on the average and/or maximum concentration, mass or other measure of identified wastewater constituents or properties; j. Development and implementation of spill control plans or other special conditions, including additional management practices necessary to adequately prevent accidental, unanticipated or routine discharges; k. Specifications for monitoring programs, which may include sampling locations, frequency of sampling, number, types and standards for testing, and reporting schedules; l. Compliance schedules; m. Requirements for submission of technical reports or discharge reports; n. Requirements for maintaining and retaining plant records relating to wastewater discharge as specified by the general manager and affording the general manager access to records; o. Requirements for the notification of any new introduction of wastewater constituents or any substantial change in the volume or character of the wastewater being used by the permittee; p. Requirements for the notification of any change in the manufacturing and/or pretreatment process used by the permittee; and q. Requirements for the notification of excess, accidental or slug discharges. (c) Industrial user discharge permit decisions. The board will evaluate the data furnished by the user and may require additional information. Within 60 days of receipt of a complete permit application, the board will determine whether to issue an industrial user discharge permit. The board may deny any application for an industrial user discharge permit. (d) Industrial user discharge permit issuance process. (1) Public notification. Once the board has prepared a draft industrial user discharge permit, the permit applicant will publish in a newspaper of general circulation in Kanawha County a Class I legal notice, in a form acceptable to the board, of its application to obtain an industrial user discharge permit, and the board shall receive comments on the permit application for a period not less than 30 days. The notice will indicate a location where the draft permit may be reviewed and an address where written comments may be submitted. (2) Permit appeals. The board shall provide public notice of the issuance of an industrial user discharge permit. Any person, including the user, may petition the board to reconsider the terms of an industrial user discharge permit within 30-calendar days of notice of its issuance. a. Failure to submit a timely petition for reconsideration shall be deemed to be a waiver of the administrative appeal. b. In its petition, the appealing party must indicate the industrial user discharge permit provisions objected to, the reasons for this objection, and the alternative condition, if any, it seeks to place in the industrial user discharge permit. c. The effectiveness of the industrial user discharge permit shall not be stayed pending the appeal. d. If the board fails to act within 45 days of the filing for reconsideration the request for reconsideration shall be deemed to be denied. Decisions not to reconsider an industrial user discharge permit, not to issue an industrial user discharge permit, or not to modify an industrial user discharge permit shall be considered final administrative actions for purposes of judicial review. (3) All industrial user discharge permits issued to a user are superseded upon the issuance of a new industrial user discharge permit to that user. (e) Industrial user discharge permit modification. (1) The board may modify an industrial user discharge permit for good cause, including, but not limited to, the following reasons: a. To incorporate any new or revised federal, state, or local pretreatment standards or requirements; b. To address significant alterations or additions to the user's operation, processes, or wastewater volume or character since the time of the industrial user discharge permit issuance; c. A change in the POTW that requires either a temporary or permanent reduction or elimination of the authorized discharge; d. Information indicating that the permitted discharge poses a threat to the POTW, board personnel, or the receiving waters; e. Violation of any terms or conditions of the industrial user discharge permit; f. Misrepresentations or failure to fully disclose all relevant facts in the industrial user discharge permit application or in any required reporting; g. To correct typographical or other errors in the industrial user discharge permit; or h. To reflect a transfer of the facility ownership or operation to a new owner or operator where requested in accordance with section 118-208(f). (f) Industrial user discharge permit transfer. (1) Industrial user discharge permits may be transferred to a new owner or operator only if the permittee gives at least 30 calendar days advance notice to the board and the board approves the industrial user discharge permit transfer. The notice to the board must include a written certification by the new owner or operator which: a. States that the new owner and/or operator has no immediate intent to change the facility's operations and processes; b. Identifies the specific date on which the transfer is to occur; and c. Acknowledges full responsibility for complying with the existing industrial user discharge permit. (2) Failure to provide advance notice of a transfer renders the industrial user discharge permit void as of the date of facility transfer. (g) Industrial user discharge permit revocation. The board may revoke an industrial user discharge permit for including, but not limited to, the following reasons: (1) Failure to notify the board of significant changes to the wastewater discharge prior to the changed discharge; (2) Failure to provide prior notification to the board of changed conditions pursuant to section 118-209(d) of this division; (3) Misrepresentation or failure to fully disclose all relevant facts in the industrial user discharge permit application; (4) Falsifying self-monitoring reports or certification statements; (5) Tampering with monitoring equipment; (6) Refusing to allow the general manager timely access to the facility premises and records; (7) Failure to meet compliance schedules; (8) Failure to pay fines; (9) Failure to pay rates or fees as established pursuant to this article; (10) Failure to complete a wastewater survey or the industrial user discharge permit application; (11) Failure to provide advance notice of the transfer of business ownership of a permitted facility; (12) Violation of any pretreatment standard or requirement, or any terms of the industrial user discharge permit or this article; or (13) Cessation of operations of the permitted facility. (h) Permit reissuance. The user shall apply for permit reissuance by submitting a complete permit application a minimum of 90 days prior to the expiration of the user's existing permit. (i) Continuation of expired permits. An expired permit will continue to be effective and enforceable until the permit is reissued if: (1) The industrial user has submitted a complete permit application at least 90 days prior to the expiration date of the user's existing permit. (2) The failure to reissue the permit, prior to expiration of the previous permit, is not due to any act or failure to act on the part of the industrial user.

(Ord. No. 7596, 9-16-2013)

Ask a question about Charleston law

Corpus searches the Charleston sections it holds and shows the ones that match, with their citations. Free, no sign-in.