For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 77.210 — Filing statement of cost by developer

Salem Revised Code, City of Salem, Oregon (Supp. No. 26: codified through Ordinance No. 10-26, adopted August 10, 2026) · Salem Revised Code § 77.210

Corpus is an independent public-information project, not the official City of Salem website. Stable reference: corpuslaw.us/code/2aea7af6-073c-4e66-a5a2-02a70c854264

Sec. 77.210. - Filing statement of cost by developer.

(a) Upon completion of the traffic signal installation, the developer shall file with City Engineer an itemized cost statement thereof. In addition to actual construction costs, costs associated with design, production of construction documents, permitting, bonding, and any other costs associated with the design of the signal, as well as right-of-way acquisition, signal interconnect, street lighting directly associated with the signal, and other materials directly related to the installation of the signal shall be eligible for reimbursement. (b) If the total cost shown on the itemized statement exceeds the estimate in the approved application, the Director may approve the overage for the purposes of calculating the pro-rata share reimbursements if the Director is satisfied the overage was due to conditions not readily foreseen at the time of the construction.

(Prior Code, § 77.210; Ord. No. 8-2003)

Ask a question about Salem law

Corpus searches the Salem sections it holds and shows the ones that match, with their citations. Free, no sign-in.