§ 22.170.140 — Completion of Work under Grading Permit
Seattle Municipal Code (Supp. No. 44: codified through Ordinance No. 127459, passed June 30, 2026) · Seattle Mun. Code § 22.170.140
Corpus is an independent public-information project, not the official City of Seattle website. Stable reference: corpuslaw.us/code/2baf0090-d881-43c4-8f03-6c7e626f8a29
22.170.140 - Completion of Work under Grading Permit
A. Final Inspection. Upon completion of the work, the owner shall notify the Director that the site is ready for final inspection. The Director shall not give final approval until all work, including installation of all drainage control facilities and their protective devices and all erosion control measures, has been completed in accordance with the final approved plans and required reports have been submitted. B. Final Plans. When grading plans have been modified during construction, the Director may require an as-graded plan including existing grade, location of discharge points, elevations, and location and maintenance requirements of all surface and subsurface drainage control facilities as called out by a drainage control plan.
(Ord. 123107, § 1, 2009.)
Ask a question about Seattle law
Corpus searches the Seattle sections it holds and shows the ones that match, with their citations. Free, no sign-in.
