22.170.140 - Completion of Work under Grading Permit

A. Final Inspection. Upon completion of the work, the owner shall notify the Director that the site is ready for final inspection. The Director shall not give final approval until all work, including installation of all drainage control facilities and their protective devices and all erosion control measures, has been completed in accordance with the final approved plans and required reports have been submitted. B. Final Plans. When grading plans have been modified during construction, the Director may require an as-graded plan including existing grade, location of discharge points, elevations, and location and maintenance requirements of all surface and subsurface drainage control facilities as called out by a drainage control plan.

(Ord. 123107, § 1, 2009.)