Temporary removal of wires and supporting fixtures by nonprofit housing development corporation.
R.I. Gen. Laws § 39-2-15.1
in effect39-2-15.1. Temporary removal of wires and supporting fixtures by nonprofit housing development corporation.
(a) Whenever, in order to move a building to be used as affordable housing for low- and
moderate-income persons for a period of not less than ten (10) years, a nonprofit
housing development corporation desires that the pipes, mains, poles, wires, conduits,
or fixtures of a public utility be cut, disconnected, or removed, the public utility
shall cut, disconnect, or remove the same at its own expense.
(b) A nonprofit housing development corporation that desires the cutting, disconnection,
or removal of mains, poles, conduits, wires, or fixtures of a public utility shall
give written notification thereof to the commission and the utility company. The written
notification must contain the location of the site where the structure is presently
located; the location of the final destination of the structure; the path of the proposed
move, described in reference to the crossings of streets or highways; and the date
of the required cutting, disconnection, or removal.
(c) Upon receipt of the written notification described in subsection (b), the commission
shall promptly determine whether the applicant is a nonprofit housing development
corporation within the meaning of this chapter, and shall also determine whether the
structure to be moved will be maintained as affordable housing for a period of not
less than ten (10) years. A resolution, issued by the board of directors of the nonprofit
housing development corporation and recorded at the land records office of the locality
to where the structure is to be moved, stating that the structure will be used as
affordable housing for a period of not less than ten (10) years, shall be satisfactory
evidence that the requirements of this section have been satisfied. If the commission
determines that the applicant satisfies the requirements of this section, it shall
give notice thereof to the public utilities and require the applicant to coordinate
its building move with the path(s), date(s), and time(s) as determined by the public
utilities; however, the date(s), and time(s) shall be no later than thirty (30) days
from the date the public utilities have received notice of the commission’s determination.
(d) If, at any time during the ten-year (10) period following the cutting, disconnection,
or removal of the pipes, mains, poles, wires, conduits, or fixtures of a public utility,
the nonprofit housing development corporation shall utilize the structure for any
purpose other than affordable housing, the nonprofit housing development corporation
shall reimburse the public utility for the cost of the cutting, disconnection, or
removal of the same.
P.L. 1988, ch. 580, § 3.
Source: State of Rhode Island General Assembly (rilegislature.gov)URL: https://webserver.rilegislature.gov/Statutes/TITLE39/39-2/39-2-15.1.htmFetched: 10/20/2026
